Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Active
RFP-DS-0149State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

West Basin Municipal Water District has issued solicitation RFP-DS-0149 to engage a System Integrator for the replacement of three obsolete process-level Programmable Logic Controllers (PLCs) and associated SCADA equipment at the Torrance Refinery Water Recycling Plant. The project aims to mitigate the high risk of unplanned facility shutdowns by replacing existing Modicon 984 and Quantum controllers with at least three Modicon M580s. The scope of work includes transferring control logic, designing network and panel drawings, developing HMI screens, and performing comprehensive testing, including baseline field loop checks, Factory Acceptance Testing (FAT), and Site Acceptance Testing (SAT). All work must adhere to the District's specific instrumentation, control, and electrical standards, as well as cybersecurity policies and California prevailing wage laws. Proposals are due by November 5, 2026, and will be evaluated on a 100-point scale based on the best overall value. The District provides scoring incentives for Small, Local, and Veteran Owned Business Enterprises, with potential point additions or price reductions for qualifying firms. Selected consultants will be required to provide professional qualifications for key personnel and maintain specific insurance minimums, including 2 million dollars in commercial general liability. The contract will be administered on a time-and-material basis, with monthly invoicing submitted to the District's Carson, California office.

General Info

West Basin seeks a System Integrator to replace obsolete PLCs at Torrance plant.

Agency

California → Engineering - ProductionView Agency

NAICS

541512 - Computer Systems Design ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(14)

EA25WBM048 IC&E Standards

PDFspecifications

EA25WBM048 PCS Standards Implementation Guide

PDFspecifications

EA25WBM048 - PCS Standards Operating Guide

PDFspecifications

EA25WBM048 PCS Tag Naming Standards v0.2.0

PDFspecifications

EA25WBM048 PLC Style Guide v0.1.0

PDFspecifications

General Services Agreement - West Basin Municipal Water District

DOCX10 pagescontract-document

Professional Services Agreement - West Basin Municipal Water District

DOCX10 pagescontract-document

Professional Services Agreement - West Basin Municipal Water District

DOCX11 pagescontract-document

Professional Services Agreement - West Basin Municipal Water District

DOCX8 pagescontract-document

Professional Services Agreement - West Basin Municipal Water District

DOCX9 pagescontract-document

Supply Agreement No. W___ between West Basin Municipal Water District and Supplier

DOCX10 pagescontract-document

Transportation Services Agreement - West Basin Municipal Water District

DOCX8 pagescontract-document

West Basin Municipal Water District - Torrance Refinery PLC Replacements RFP

PDFrfp

Vendor Information Request Form - West Basin Municipal Water District

PDF1 pagevendor-information-request

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering - Production
Contacts2 people available
OfficeCarson, CA, 90746, USA
Organization / Agency
California → Engineering - Production
View Agency Profile
Office AddressCarson, CA, 90746, USA
Contacts
Jason KungOperation Analyst II
David ShullSenior Contracts Administrator

Interested Companies (18)

Show more
The RoviSys
Aurora, OH
SKM Engineering
Bountiful, UT
PBLA Surveying
Redlands, CA

See All 18 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
West Basin Municipal Water District (West Basin or District) is committed to providing reliable and resilient nitrified and reverse osmosis-treated recycled water supply from the Torrance Refinery Water Recycling Plant (TRWRP) to the Torrance Refinery (TORC) for its cooling tower and boiler feed applications. To support that objective, the District proactively identifies high-risk equipment to prevent unplanned failures. The three programmable logic controllers (PLCs) automating the processes behind the nitrified equipment and the reverse osmosis equipment have experienced several failures on critical components, disrupting operations. The existing controllers continue to operate with obsolete components that present a high risk of failure and minimal spare part availability. A concurrent failure of all three PLCs would result in a shutdown of the facility, potentially interrupting production for an extended period of time. To mitigate this risk, the District is moving forward with developing a Request for Proposals to solicit competitive proposals to design the replacement of the PLCs in question.

Similar Contracts

Same NAICS industry code

NAICS: 541512
New
SLED
Website Strategy, Design, Development & Ongoing Services for the Village of Schaumburg, Al Larson Cultural Center & 90 North
Solicitation # 2026-RFP-061
The Village of Schaumburg is seeking a full-service partner under solicitation 2026-RFP-061 to modernize and coordinate its digital presence through the strategy, design, development, and ongoing maintenance of three distinct websites: the primary Village of Schaumburg site, the Al Larson Cultural Center site, and the 90 North entertainment district site. The project scope encompasses a comprehensive lifecycle including strategy briefs, UX/UI design, content inventory and migration, and the implementation of a secure, scalable CMS. All deliverables must adhere to plain-language writing standards and meet ADA and WCAG 2.1 Level AA accessibility requirements. The initial term for implementation is expected to begin in May 2027 for one year, with the possibility of three additional one-year extensions. Proposals are due by October 16, 2026, via the OpenGov portal and will be evaluated on a points-based system focusing on firm qualifications, project approach, technical solution, and cost. The selected contractor must provide ongoing hosting and support and maintain comprehensive general liability insurance of at least 1,000,000 dollars per occurrence. Optional add-on services may include AI technology, chatbot integration, FOIA request management, and agenda management. Administration of the contract is led by the Director of Communications and Outreach, with payments processed within 30 days of approved invoicing. All respondents must comply with the Equal Employment Opportunity Clause required by the Illinois Fair Employment Practices Commission.
Communications Department

POSTED

about 22 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → Engineering - Production

Same awarding agency

NAICS: 811310
SLED
On-Call Pump and Motor Repairs, Rebuilds, and Replacement Services
Solicitation # RFP-TH-0143
West Basin Municipal Water District is soliciting proposals for an on-call agreement to provide pump and motor mechanical and electrical repair, rebuild, and replacement services. The contract is anticipated to begin in October 2026 with an initial one-year term and a possible one-year extension, featuring a total not-to-exceed value of 1,000,000 dollars. The scope of work includes the disconnection, removal, transport, repair, and re-installation of critical equipment across various treatment facilities, with a requirement that all rebuilds meet manufacturer specifications using OEM parts. Contractors must adhere to strict emergency response times, including responding to requests within one hour and providing onsite support within 12 hours. Proposals are due by October 1, 2026, and will be evaluated on a 100-point scale based on qualifications, experience, safety records, and price. Pricing is submitted via a specific bid response table for various repair scenarios, with materials paid at actual cost plus a maximum 10 percent markup. Award incentives are available for Small, Local, or Veteran Owned Business Enterprises. Selected contractors must comply with California prevailing wage laws and maintain comprehensive insurance coverage, including 2,000,000 dollars in commercial general liability and professional liability per occurrence. Final acceptance requires the project site to be restored to a clean and safe condition and the successful completion of post-installation performance testing.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

22 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS