PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract is a Firm Fixed Price solicitation issued by the U.S. Army Corps of Engineers for a pre-demolition environmental survey at NASA’s Wallops Flight Facility in Wallops Island, Virginia, under solicitation number W912DY26RA086. The scope requires the contractor to conduct comprehensive environmental sampling of designated facilities to identify and quantify hazardous materials including asbestos-containing materials (ACM), oil-containing residue (ORM), RCRA 8 metals, lead-based paint, and polychlorinated biphenyls (PCBs) in paint, with all work strictly adhering to federal, state, and local regulations. The contractor must access all areas of concern including exteriors, roofs, basements, and crawl spaces, and provide detailed documentation noting any inaccessible areas along with their size and prior use. Sampling results must be analyzed in laboratories within specified timeframes, culminating in a Pre-Demolition Assessment Report that fully characterizes contamination and recommends safe removal and disposal methods. The contract includes mandatory compliance with safety protocols requiring a designated Site Safety and Health Officer, Accident Prevention Plans, Activity Hazard Analyses, and Site-Specific Addenda, with all personnel subject to installation security, OPSEC, and AT Level I training. The contractor must have an effective quality control system covering all on- and off-site operations, and work is subject to 100% inspection upon key deliverables. The solicitation is 100% set aside for Economically Disadvantaged Women-Owned Small Businesses (EDWOSB), with proposal submission required through the Procurement Integrated Enterprise Environment system by June 4, 2026. Offerors must submit a technical proposal limited to 20 pages without pricing references, a signed cost summary sheet, and a Gantt chart outlining the project schedule with mobilization and task sequencing. All proposals must include CMMC certification status for information systems handling Federal Contract Information or Controlled Unclassified Information, and flow-down of CMMC requirements to subcontractors is mandated. The contractor must provide proof of E-Verify compliance for personnel screening, be registered in SAM with UEI and CAGE codes, and comply with Davis-Bacon wage standards. Payment is processed through the U.S. Army Corps of Engineers’ Resident Management System and Wide Area Workflow, with invoices submitted to the Facilities Reduction Program. The period of performance runs from June 29, 2026, to March 12, 2027, with evaluation based on a lowest
General Info
Agency
NAICS
Place of Performance
Wallops Island, VA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS