Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Primrose Residential Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Hesperia

NAICS

236116 - New Multifamily Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Primrose Avenue and Yucca Street, Hesperia, CA, 92345

Set-Aside

NONE

Documents

(4)

NOI Primrose Residential Project Hesperia CA

PDFnotice-of-intent

Notice of Completion for Primrose Residential Project

PDFnotice-of-completion

Summary Form City of Hesperia - Primrose Residential Project

PDFenvironmental-summary

Primrose Residential Project Initial Study/Mitigated Negative Declaration July 2025

PDFenvironmental-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Hesperia
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Hesperia
Office AddressN/A
Contacts
Jessica CleavengerSenior Environmental Planner
Edgar GonzalezSenior Planner
San Luis Concrete CorpOwner

Interested Companies (1)

Show more
SWCA Environmental Consultants
Phoenix, CA

Full Description

Show more
The project includes the construction of a 36-unit multi-family residential development consisting of nine two-story apartment buildings and associated site improvements including a paved access road and parking areas, a 3,398-square-foot leasing office building with a common recreation room, common outdoor recreation areas, a trash enclosure, a playground, a stormwater infiltration system, perimeter fencing, and other on-site improvements. The project would also include off-site utility improvements along the property frontages along Yucca Street and Primrose Avenue. Each apartment building would have four residential units, including two 2-bedroom units and two 3-bedroom units. The project would provide 82 total parking spaces on-site, including 72 standard spaces, 6 compact spaces, and 4 spaces compliant with the Americans with Disabilities Act (ADA) accessibility requirements. Thirty-eight of the parking spaces provided on-site would be covered. Each apartment building would have a total floor area of approximately 5,568 square feet. Each residential unit would include a 114-square-foot outdoor patio. Each two-story apartment building would have a maximum height of 28 feet, 8 inches, and would be located a minimum of 15 feet from the adjacent two-story buildings. The apartment buildings would generally have a craftsman architectural style and be constructed with earthtone colors and materials, including, but not limited to, stucco walls, wood trim, masonry veneer, and concrete or clay tile roofing. All residential units would be constructed with heating, ventilation, and air conditioning (HVAC) systems, and fire sprinkler systems, and each building rooftop would include solar photovoltaic-ready zones. The two-story apartment buildings would be configured in a courtyard configuration, with walkways and landscaping located between each building. The project site would be accessed via a gated access road that would be constructed along the south and west edges of the site, providing access from both Primrose Avenue and Yucca Street. On-site parking spaces would be provided along the southern and western sides of the property and within a parking lot in the northwestern corner of the site, adjacent to the leasing office building. A 6-foot masonry wall would be constructed along the southern and western property lines. A wrought iron fence with decorative pillars would be erected along the project frontages facing Primrose Avenue and Yucca Street, with the exception of the gated vehicle and pedestrian access points. Other on-site improvements would include common outdoor recreation areas, a playground, a trash enclosure, mailboxes, walking paths, and landscaping. The project would include the installation of water, wastewater, and stormwater pipelines within the project site. The project includes the construction of an on-site stormwater infiltration system that would include a series of area drains and catch basins located within the site and a proposed underground MC-3500 Stormtech chamber system for infiltration. The Stormtech chamber system would be located under the parking lot in the northwestern corner of the project site. This system would be approximately 2,120 square feet in area and would have a capacity of 9,557 cubic feet (0.22 acre-feet). On-site water and wastewater infrastructure would connect to off-site City pipelines, as described below. The project would include off-site improvements within the City’s public right-of-way along Primrose Avenue and Yucca Street, including the construction of a sidewalk, curb, and gutter along the project site frontages and utility connections. Sidewalk ramps would be constructed adjacent to the proposed site access road entrances. Frontage improvements would also include the installation of new 32-foot-tall streetlights along the west side of Primrose Avenue and the south side of Yucca Street, and a fire hydrant on the west side of Primrose Avenue. The project includes the installation of two new connections to City water lines, including one 2-inch diameter PVP pipe connection to the existing 8-inch diameter waterline beneath Primrose Avenue and a 6-inch diameter PVP pipe connection to the existing 8-inch diameter waterline beneath Yucca Street. The project would also include a new 6-inch diameter sewer lateral connection to a proposed 8-inch diameter sewer main located beneath Primrose Avenue, which will connect with an existing 12-inch diameter sewer main located beneath Yucca Street. Project construction activities would result in approximately 2.73 acres of total site disturbance, including 2,220 cubic yards of cut and 300 cubic yards of fill material. The project would result in an estimated addition of approximately 28,905 square feet of new impervious surface area on-site. Including proposed off-site improvements, the project would result in a total of 39,965 square feet of new impervious surface area. Construction activities would be anticipated to last approximately six to eight months. The project includes a preliminary erosion control plan, which identifies several stormwater best management practices (BMPs) to be implemented during construction activities. These BMPs include, but are not limited to, installation of gravel bags along the perimeter of the project site, construction of a stabilized construction entrance to the site, installation of an above-ground concrete washout area, construction of a temporary sediment basin, use of fiber rolls and gravel bags for inlet protection, street sweeping, application of soil stabilizer, and application of wind erosion control sprays.

Similar Contracts

Same NAICS industry code

NAICS: 236116
New
Federal
Pueblo Pintado Staff Quarters Design Build
Solicitation # 75H70126R00056
The Indian Health Service is conducting a sources sought notice to gather market information for the planned design-build construction of 82 new LEED-certified staff quarters and associated amenities in Pueblo Pintado, New Mexico, to support the new Pueblo Pintado Health Center. The project, estimated between $50 million and $100 million, involves comprehensive site development including underground utilities, roads, sidewalks, lighting, security infrastructure, recreational facilities such as basketball and tennis courts, playgrounds, picnic areas, RV sites, and a housing support building, all designed to meet sustainability goals and cultural context in a remote Navajo Nation location. The contract is anticipated to be awarded as a competitive two-phase firm-fixed-price design-build under FAR Part 15, with selection based on best-value tradeoff, and is expected to commence in late spring or early summer of 2027 with a two-year performance period. The project falls under NAICS code 236116 and is subject to the Navajo Preference in Employment Act. The government intends to require a Project Labor Agreement (PLA) post-award and is soliciting input on labor market conditions, including the availability of union and non-union labor, potential impacts on competition and cost, and the applicability of a PLA given the remote location of the site. Respondents are requested to provide company details, small business certifications including Native American-owned (IEE/ISBEE), 8(a), HUBZone, WOSB, or SDVOSB status, bonding capacity, and project experience from the past six years with similar large-scale residential construction. IEE/ISBEE firms must submit a completed IHS representation form and Bureau of Indian Affairs Certificate of Degree of Indian Blood documentation, with personally identifiable information redacted. Responses are due by 2:00 PM PT on August 21, 2026, and must be submitted to Matt Sanders at matt.sanders@ihs.gov; no proposals are being accepted and no reimbursement will be provided for response costs. This notice is strictly for acquisition planning purposes under FAR Part 10 and does not constitute a solicitation or commitment to award.
Division Of Engineering Svcs - Seattle

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 236116
New
SLED
Development Plan (RD24-00008), Tentative Map (RT26- 00001), Conditional Use Permit (RCUP24-00004), And Regular Coastal Permit (RRP24-00006) – 217 S Myers BeachThe project at 217 South Myers Street in Oceanside, California, involves the demolition of an existing cottage and the construction of five condominium units distributed across two three-story buildings. Located within the Appealable area of the Coastal Zone and the Townsite Neighborhood Planning Area, the site is zoned as Downtown Subdistrict 5 with a General Plan Land Use designation of Downtown and a Local Coastal Program Land Use Plan designation of High Density Residential. The development requires approval of multiple permits including a Development Plan, Tentative Map, Conditional Use Permit, and Regular Coastal Permit to ensure compliance with local and coastal regulations. All activities must align with the stringent land use and environmental standards applicable to the coastal zone and high-density residential area. The project is overseen by the City of Oceanside, with key contacts including Senior Planner Dane Thompson and architect Kirk Moeller, who serve as primary points of communication for planning and design matters. The permits were posted for public review on August 6, 2026, and the project is listed under the California Environmental Quality Act system with the project number 2026080179. Construction will occur in a densely structured urban setting where density, design consistency, and coastal access are critical considerations, requiring adherence to the Local Coastal Program and municipal zoning codes governing the Downtown Subdistrict.
City of Oceanside

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236116
New
SLED
University Station Residential ProjectThe University Station Residential Project involves the demolition of four existing office buildings totaling 216,000 square feet and two parking garages to make way for a new mixed-use residential development. The project will include up to 297 multi-family residential units in a five-story building reaching a maximum height of 64 feet above grade, along with up to 111 three-story townhouse units spread across 26 buildings with a maximum height of 38 feet. Thirteen of the townhouse units will be located on a 0.94-acre parcel currently within the City of San José, while the remainder of the townhouses and the main residential building will be situated on the Santa Clara parcel. The project will achieve an average density of 37 dwelling units per acre and will feature an 8.5-foot-wide sidewalk along the frontage of El Camino Real and Campbell Avenue to improve pedestrian access. To facilitate development, the 0.94-acre parcel in San José will be annexed into the City of Santa Clara, which requires formal detachment from San José and annexation into Santa Clara. Upon approval, the Santa Clara General Plan will be amended to designate the annexed parcel for Santa Clara Station Mixed Use, encompassing both Regional Commercial and High Density Residential land uses, and the parcel will be rezoned to Mixed Use-Regional Commercial (MU-RC). The project is being led by Bixby Land Company with key contacts including Senior Planner Steve Le and Project Manager Nick Towstopiat, and is listed under a forecast notice issued by the City of Santa Clara with a posted date of August 6, 2026. The development aims to transform underutilized commercial property into a higher-density residential community consistent with transit-oriented growth principles.
City of Santa Clara

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236116
New
SLED
Affordable Housing Development and Owner-Occupied Rehabilitation
Solicitation # 27-03
The County of Shasta is soliciting proposals from qualified affordable housing developers to secure Permanent Local Housing Allocation (PLHA) funding for the predevelopment, acquisition, rehabilitation, and preservation of at least four units of affordable rental and ownership housing, including Accessory Dwelling Units (ADUs). Projects must be located within the County of Shasta excluding the City of Redding, except where City of Redding PLHA funds have already been committed; the City of Shasta Lake will only approve owner-occupied rehabilitation projects. Eligible projects must serve households earning up to 120 percent of the Area Median Income (AMI), with priority given to workforce housing targeting incomes between 80 and 120 percent of AMI. Applicants must have confirmed site control for their proposed projects and submit complete responses that include documentation of ownership, zoning, entitlements, and utility availability to be eligible for evaluation. Proposals will be assessed using a trade-off evaluation model based on a 100-point scale, with the most critical factor being project readiness and site control at 30 percent weight, followed by the developer’s experience in comparable projects at 25 percent, the technical approach and alignment with County housing and sustainability objectives at 25 percent, and finally the funding strategy and timeline at 20 percent. Award decisions will prioritize overall value over lowest cost, allowing the County to select the proposal best suited to its goals. Offerors must maintain comprehensive insurance coverage, including $2 million in commercial general liability, professional errors and omissions, and cyber liability insurance, and must comply with the Davis-Bacon Act, Section 3 hiring preferences, and all applicable state and local regulations. Proposals must be submitted electronically by September 2, 2026, through the Shasta County e-Procurement Portal, and include detailed resumes of key personnel, project timelines, community engagement plans, and verified funding sources totaling at least 40 percent of project costs. All submitted materials will become County property, and successful respondents will enter into a low-interest, deferred loan agreement with a Promissory Note and Regulatory Agreement, subject to audit, five-year record retention requirements, and potential contract extension for up to two additional one-year terms. The County reserves the right to terminate contracts with or without cause, including immediate termination upon loss of funding, and requires strict adherence to conflict of interest policies under the California Political Reform Act.
Purchasing Department

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 236116
New
SLED
East Steet Housing - Morris Housing Authority
Solicitation # 38334
The contract pertains to the construction of eight affordable housing units distributed across two one-story slab-on-grade buildings, with each building containing four units. This phase encompasses all remaining construction activities including building foundations and structures, driveways, parking areas, and associated infrastructure, following the completion of initial site preparation. All work must align precisely with the project plans, which define the full scope, though site work already finished prior to this phase is explicitly excluded from current responsibilities. Sheet C1 details the specific tasks included in this solicitation, ensuring clarity on what is and is not part of the contractor’s obligations. The project is managed by the Morris Housing Authority under the solicitation number 38334, issued by Connecticut’s DAS Procurement through the State and Local Entity (SLED) procurement channel. The opportunity was posted on August 5, 2026, with a response deadline of September 3, 2026. Work must be performed in Connecticut, and all inquiries or communications should be directed to Jim Simoncelli Jr., the primary point of contact, reachable at 860-567-5876. The contract opportunity is publicly accessible via the CTSource Bid Board portal, and no set-aside type or NAICS code is specified, indicating this is open to all qualified bidders without specific socioeconomic preferences.
DAS Procurement

POSTED

2 days ago

DEADLINE

in 27 days
View Details
NAICS: 236116
New
SLED
3401 Cerritos Project at 1131 East Wardlow RoadThe project proposes the development of a 73-unit, 100 percent affordable housing community for lower income households on two adjacent parcels at 1131-1135 E. Wardlow Road and 3431 Cerritos Avenue in Long Beach, owned by the Long Beach Community Investment Company. A public alley between the parcels will be vacated and merged with the properties to create a single lot, enabling the construction of one mixed-height building featuring a five-story front section and a two-story rear section, with a combination of one-, two-, three-, and four-bedroom units. The development will include two levels of subterranean parking providing 86 residential spaces, one dedicated loading space, and space for eight bicycle parking spots with potential for expansion. The project requires multiple discretionary approvals, including a site plan review, lot merger, rezoning from FCN to MU-2, a general plan amendment to update placetype designations, a certificate of appropriateness to ensure design compatibility with the California Heights Historic District, and a general plan conformity finding. The proposed changes will update several general plan maps to reclassify the northern parcel and the vacated alley from a FCN placetype to an NSC-L placetype, aligning the land use designation with the development’s intent to serve as a neighborhood-serving center with moderate density. All units will be restricted to affordable housing, excluding only the manager’s unit, reinforcing the project’s mission to expand safe, accessible housing options in the community.
City of Long Beach

POSTED

3 days ago

DEADLINE

N/A
View Details