Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Connecticut was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pumping Station Construction – Complete Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
HBJTJMA Water Line Paving 08003-013
Solicitation # Herndon Borough-Jackson Township Joint Municipal Authority, Northumberland County
The contract pertains to the completion of punchlist items associated with the Route 147 Water Line Replacement project, administered by the Herndon Borough-Jackson Township Joint Municipal Authority in Northumberland County, Pennsylvania. The solicitation, posted on July 10, 2026, with a response deadline of August 7, 2026, is designated as a Firm Fixed Price contract under the NAICS code 237110 for Water and Sewer Line and Related Structures Construction. Performance is required on-site at the project location within Northumberland County, with all work, material delivery, storage, and inspection to occur at the designated project site. The scope includes installation and restoration activities such as erosion and sedimentation control, mill and overlay, line painting, yard restoration, and an allowance of $25,000 for miscellaneous identified items, though no unit prices or total contract value are specified beyond this allowance, indicating an incomplete or template-level pricing structure. The contract mandates compliance with numerous technical standards including ASTM, AWWA, ACI, and PennDOT specifications for materials, testing, and installation, particularly for precast concrete manholes, drainage systems, and sealed joints. All materials must be delivered, stored, and handled per manufacturer guidelines with strict labeling, preservation, and protection protocols enforced, and no bar-coding requirements apply. The Contractor is responsible for submitting detailed shop drawings, field test reports, dewatering data, and comprehensive Operation and Maintenance documentation in PDF composite electronic format, with submissions required within ten days of final inspection. Inspection and acceptance are performed on-site by the Owner or Engineer, with final approval being binding. The Architect/Engineer serves as the Contract Administrator with oversight authority over submittals, payments, and compliance enforcement, though specific names or contact details for contracting personnel are not provided. Payment procedures require electronic Applications for Payment with supporting documentation like lien waivers, but no remit-to address, accounting codes, or invoicing platform (e.g., WAWF) are identified. The contract requires adherence to Equal Employment Opportunity and Affirmative Action standards, with MBE, WBE, and SBE participation goals of 5%, 3%, and unspecified respectively, and mandates certifications against non-collusion, non-suspension/debarment, and compliance with federal labor and environmental regulations. Bids must be submitted to 278 N. Main Street, Herndon, PA 17830, electronically via PDF or via
Northumberland County

POSTED

1 day ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract entails the full installation of a wastewater pumping station designed for municipal use, covering all mechanical, electrical, and control systems required for operational integrity. This is a subcontract opportunity under NAICS code 237110, which classifies it as water and sewer line and related structures construction, and is being managed by the Connecticut Department of Administrative Services through its Procurement division. The solicitation was posted on July 8, 2026, with a firm response deadline of August 4, 2026, at 3:00 PM, requiring all proposals to be submitted prior to that time. The place of performance is within Connecticut, though specific location details are not provided, and interested parties must access the official bid board portal for full specifications and submission guidelines.

General Info

Install wastewater pumping station in Connecticut by August 4, 2026, under NAICS 237110.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

This scope was carved out of GL-2027-09.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Parker Terrace Wastewater Pumping Station Upgrades

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full installation of a complete pumping station including mechanical, electrical, and control systems for municipal wastewater infrastructure.

More opportunities from Connecticut → DAS Procurement

Same awarding agency