Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Purchase and Delivery of Single Mode Fiber Optic Cable (432 count, 144 count, 24 count, and 12 count) as needed for up to 3 years.

Closed
RFQ 197040State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This contract requires the engineering, furnishing, installation, and testing (EFI&T) of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The scope involves connecting the Radar Approach Control (RAPCON) to multiple facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment stations. The installation will utilize a combination of existing manhole/handhole duct systems and direct burial, with the latter requiring a minimum depth of 36 inches or the manufacturer's specification. The contractor must provide all new, rust-proof, and corrosion-resistant materials, as the government will provide no equipment or supplies. This requirement is a 100% Women-Owned Small Business set-aside. The contract is a firm-fixed-price award based on the lowest priced, technically acceptable quote, with evaluations focusing on design, quality control plans, and supplier performance history. The period of performance is not to exceed 180 calendar days, with a target completion of all project facets within 120 days of award and a final delivery date of July 1, 2027. All work must comply with Luke AFB environmental guides, including lead-based paint and hazardous material regulations, and must be verified through OTDR and Optical Power Meter testing prior to final government acceptance.
FA4887 56 Cons Cc

POSTED

3 days ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The City of Palo Alto Utilities (CPAU) is soliciting quotes under RFQ 197040 for the purchase and delivery of new, current production outside-plant single-mode OS2 fiber optic cable. The procurement is intended to replenish inventory for network extensions, emergency restorations, capital improvement projects, and the City's Fiber-to-the-Premise program. The contract covers four specific fiber counts: 432, 144, 24, and 12. The agreement is structured for an initial 12-month term with the possibility of two additional 12-month extensions, totaling up to three years of as-needed supply. Technical requirements specify that cables must meet ITU-T G.652.D and G.657.A1 standards, as well as Telcordia GR-20-CORE and ANSI/ICEA S-87-640. Deliverables include black-jacketed cables with sequential footage markings and traceable factory test documentation for each reel. All shipments must be F.O.B. Destination, Freight Prepaid, and delivered on weather-protected reels. The City will award the contract to the lowest responsive and responsible bidder, with the option to award on an item-by-item, aggregate, or multiple-vendor basis. Bidders must submit their quotes via the OpenGov portal by October 21, 2026, at 3:00 pm. Required documentation includes a bid form, a completed bidder's questionnaire, manufacturer data sheets, and a detailed bid compliance schedule. Awardees must adhere to strict insurance requirements, naming the City of Palo Alto as an additional insured, and comply with the City's Zero Waste and Pollution Prevention Programs, including specific mandates for FSC Certified paper packaging and the take-back of hazardous waste.

General Info

CPAU seeks quotes for OS2 fiber optic cable supply for up to three years.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

11
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first2 pages · insurance-requirements
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, Low priorityother
Low

Read all 11 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fiber Optic Cable Assembly FabricationOpen now, due in 9 days
  • CABLE ASSEMBLY, FIBER OOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Utilities
Contacts1 person available
OfficePalo Alto, CA, 94301, USA

Interested Companies (27)

APEX Fiber PROS
Ayetar Tech
BidamericaSheridan, WY

See All 27 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
City of Palo Alto Utilities (CPAU) operates an extensive municipal fiber‑optic network supporting City operations, public safety facilities, traffic signaling, utility SCADA systems, and community broadband services. Cable stock is required for: • Ongoing network extension projects • Scheduled replacement of aging or damaged cable • Emergency restoration work • Capital improvement and system reliability projects • New customer connections under the City's Fiber-to-the-Premise program Inventory levels for fiber cable have reached minimum thresholds, requiring replenishment to avoid construction delays and service interruptions.

More opportunities from California → Utilities

Same awarding agency

NAICS: 238220
New
SLED
Skywest Pump Station AC Unit Replacement
Solicitation # 27-013
The City of Hayward is soliciting quotes for the replacement and installation of the HVAC system at the Skywest Pump Station, a critical facility within a regional emergency water intertie. The project involves the removal and legal disposal of aging HVAC equipment and the installation of a new 20-ton split-system HVAC system, preferably from York or an approved equal, utilizing R-454B refrigerant. The scope of work includes field verification of site conditions, installation of galvanized sheet-metal transitions and ACR copper piping, and all necessary electrical work between the existing disconnect and the new equipment. Key technical requirements include the provision of refrigerant detection, safety features, and phase-monitoring protection for the condensing unit. The contract will be awarded to the bidder providing the lowest proposed cost who also demonstrates the required experience and capacity to perform the work. Applicants must possess a current C-20 license and EPA Section 608 Technician Certification. Bids must be submitted electronically via the OpenGov portal by November 24, 2026, and must include a cover letter, three references from the past five years, proof of insurance, and completed mandatory forms, including a Noncollusion Affidavit and an affirmation of non-involvement in nuclear weapons production. The project is subject to California prevailing wage requirements and requires a labor and materials or performance bond upon contract execution. Payment will be administered through progress payments based on an approved schedule of values.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS