PWCL0063 REPLACE SUPERIOR VALLEY WELL, FAC. 70135W

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the replacement of a non-potable water well at Superior Valley for the Department of the Navy, managed by Navfac Southwest. The scope of work requires drilling a new six-inch bore and casing to a depth of 600 feet with engineered screen intervals, ensuring the new site is located at least 50 feet away from the existing well. The installation includes a submersible pump with a 230V/60HZ/3PH motor capable of 50 GPM, a complete control system, a new motor starter and cabinet, and a transformer and wiring if necessary. The contractor is responsible for connecting the new system to the existing downstream pipeline and bypass outflow to ground. Additionally, the existing well must be capped and abandoned. All work must strictly adhere to the standards set by the American Water Works Association, Kern County, and the State Water Control Board.

General Info

Navfac Southwest project to replace a non-potable water well at Superior Valley.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
PROJECT IS TO REPAIR BY REPLACEMENT, NON-POTABLE WATER WELL AT SUPERIOR VALLEY: • SITE NEW WELL A MINIMUM OF 50FT AWAY FROM EXISTING WELL • DRILL NEW 6”BORE AND CASING TO DEPTH OF 600FT WITH ENGINEERED SCREEN INTERVALS • INSTALL NEW: SUBMERSIBLE PUMP WITH 230V/60HZ/3PH MOTOR CAPABLE OF 50 GPM, AND ASSOCIATED COMPONENTS • CONNECT TO EXISTING DOWNSTREAM PIPELINE, CONNECT TO EXISTING BYPASS OUTFLOW TO GROUND • MUST MEET ALL STATE WATER CONTROL BOARD, KERN COUNTY AND AMERICAN WATER WORKS ASSOCIATION STANDARDS. • PROVIDE NEW TRANSFORMER (IF NEEDED) AND WIRING • PROVIDE NEW 230V MOTOR STARTER, WIRING AND CABINET • INCLUDE A COMPLETE CONTROL SYSTEM • CAP AND ABANDON EXISTING WELL, MUST MEET ABOVE STANDARDS

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping. The project requires by-pass pumping, testing, and commissioning to ensure full operational readiness. The estimated project value is 16,690,000 dollars, with a bid schedule featuring 44 line items and a 200,000 dollar contingency allowance. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid bond, evidence of authority to sign, and MWBE compliance documentation, including a Good Faith Efforts Form claiming at least 50 points. Performance and payment bonds are required, and insurance providers must maintain an A.M. Best rating of A-VII or better. The project is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the City of Belmont.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 6 hours
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an Invitation to Bid for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Qualified bidders must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with reimbursement for bond premiums up to 3 percent. Bids must be submitted via email or fax, and while some documents list an October 28 deadline, the solicitation metadata indicates a final response deadline of December 3, 2026. All bids must remain valid for 120 days from the due date.
Flatiron Dragados Constructors, Inc.

POSTED

about 1 hour ago

DEADLINE

in 23 days
View Details

More opportunities from Department Of The Navy → Navfac Southwest

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS