This Solicitation opportunity from Florida was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rainbow Lakes Overhead Feeder Upgrade Part 1 and Part 2

Closed
seco-energy-2026-42-2026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 14 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

about 18 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Sumter Electric Cooperative, Inc. (SECO Energy) issued Request for Proposal 2026-42 for the Rainbow Lakes Overhead Feeder Upgrade Project in Marion County, Florida. The project consists of two work orders, 223672 and 223673, requiring qualified contractors to provide labor, equipment, and supervision for overhead feeder upgrades, including pole replacements with wood and spun concrete, conductor installation, and incidental underground work. The solicitation includes strict compliance with USDA Rural Utilities Service (RUS) forms and federal grant requirements under the Department of Energy’s Grid Resilience and Innovation Partnership program, incorporating Uniform Guidance 2 C.F.R. Part 200. Proposers were required to submit binding offers by July 2, 2026, including lump sum rate sheets for various completion deadlines in August, September, and October 2026. Technical requirements were detailed through staking sheets, project maps, and SECO Energy's overhead and underground construction assembly manuals. However, an official notice of cancellation has since been issued, stating that RFP 2026-42 for the Rainbow Lakes Overhead Feeder Upgrade Part 1 and Part 2 has been cancelled in its entirety.

General Info

SECO Energy cancelled RFP 2026-42 for the Rainbow Lakes Overhead Feeder Upgrade Project.

Documents

21

Exhibit E - Lump Sum Rate Sheet - Rainbow Lakes Feeder Upgrade

XLSX, High priority: read this first1 page · bid-schedule
High

SECO Energy Overhead Construction Unit Assembly Drawings Manual

PDF, High priority: read this first223 pages · specifications
High

SECO RFP 2026-42: Rainbow Lakes Overhead Feeder Upgrade Phase 1 and Phase 2

PDF, High priority: read this firstrfp
High

Sumter Electric Cooperative Underground Construction Unit Assembly Drawings Manual

PDF, High priority: read this first204 pages · specifications
High

USDA RUS Electric System Construction Contract - Notice and Instructions to Bidders

PDF, High priority: read this firstifb
High

WO 223673 Rainbow Lakes OH Feeder Upgrade Part 2 SOW

PDF, High priority: read this firstsow
High

Work Order 223672 Project Map

PDF, High priority: read this firstsow
High

Work Order 223672 - Rainbow Lakes OH Feeder Upgrade Part 1 SOW

PDF, High priority: read this firstsow
High

Work Order 223672 - Staking Sheet: Rainbow Lakes OH Conversion

XLS, High priority: read this first30 pages · specifications
High

Work Order 223673 Project Map

PDF, High priority: read this firstspecifications
High

Work Order 223673 Staking Sheet - RUS 23-349 Part 2

XLS, High priority: read this first32 pages · specifications
High

Contractor Safety Metrics Submission Form

DOCX, Low priority2 pages · supporting-document
Low

Notice of Cancellation - RFP 2026-42 Rainbow Lakes Overhead Feeder Upgrade

PDF, Low priorityspecial-notice
Low

Pre-Bid Meeting Notice: RFP 2026-42 Rainbow Lakes Overhead Feeder Upgrade

PDF, Low priorityindustry-day
Low

RUS Form 168b - Contractor's Bond

PDF, Low prioritybond-form
Low

RUS Form 187 - Certificate of Completion - Contract Construction

PDF, Low prioritycertificate-of-completion
Low

RUS Form 224 - Waiver and Release of Lien

PDF, Low priorityother
Low

RUS Form 231 - Certificate of Contractor

PDF, Low priorityother
Low

RUS Form 792b: Certificate of Contractor and Indemnity Agreement

PDF, Low prioritycontract-document
Low

USDA Form AD-1047: Certification Regarding Debarment, Suspension, and Other Responsibility Matters

PDF, Low prioritycertification
Low

USDA Rural Utilities Service Bid Bond Form

PDF, Low prioritybid-bond
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Seco Energy
Contacts3 people available
OfficeFL
Organization / AgencyFlorida → Seco Energy
Office AddressFL
Contacts
Lavinia Whitley
Contracts Team

Full Description

Show more
Sumter Electric Cooperative, Inc. (SECO) is accepting written proposals from qualified firms or individuals interested in providing the Services as defined and described in the “Statement of Work” section of this Request for Proposal (RFP) document. The Rainbow Lakes Overhead Feeder Upgrade Project consists of two (2) Work Orders. Each work order has an Attachment A "Staking Sheet" and Attachment B "Project Map". The successful Proposer shall prove by their qualifications, experience, availability, approach, and plan for the work that they will best serve the overall needs of SECO. The selection of the successful Proposer shall be at SECO’s sole discretion and be made in a prompt manner after receipt and evaluation of all responses. If you are interested in responding to this RFP, please complete all the requirements set forth in this RFP document in the manner indicated. Accompanying this RFP are certain forms published by the U.S Department of Agriculture, Rural Utilities Service, including RUS Form 790 (the “RUS Forms”). You must also comply with the RUS Forms and complete those RUS Forms where indicated, delivering the same with your Proposal in response to this RFP. This RFP may include funding, in part, by a federal grant, under the U.S. Department of Energy’s Grid Resilience and Innovation Partnership program (GRIP), and, therefore, the federal grant award contract flow down requirements pursuant to Uniform Guidance, 2 C.F.R. Part 200, are incorporated by this RFP and govern the Services, as applicable. Please note that your response is a binding offer to perform in the manner you describe in the Proposal response, and your Proposal must remain valid for at least FORTY-FIVE (45) days from the proposal due date. You must confirm your understanding and acceptance of all terms and conditions stated in this RFP by signing required forms. SECO welcomes your response to this RFP document.

More opportunities from Florida → Seco Energy

Same awarding agency

NAICS: 237130
New
SLED
Pre-Qualification for Upcoming Overhead Construction Bids - WA
Solicitation # 2026-88
Solicitation 2026-88 is a Request for Qualifications issued by SECO Energy to establish a pool of prequalified contractors for future Overhead Feeder Construction and New Feeder Install projects. This is a mandatory requalification process; any firm previously qualified with SECO Energy must resubmit their qualifications to be eligible for upcoming Requests for Proposals expected in October 2026. The general scope of work includes directional boring, underground excavation, installation of 4-inch conduit systems and duct banks, placement of 1000 MCM 25 kV EPR aluminum primary cable, and the installation of underground switchgear, splice boxes, and grounding systems, as well as right-of-way clearing and site restoration. To be deemed qualified, vendors must complete a comprehensive questionnaire covering company information, technical capabilities, and references from electric cooperatives or public utilities. Key requirements include the ability to provide a 10 percent bid bond and a 100 percent performance bond, as well as the submission of three years of safety records, including EMR ratings and OSHA 30A summaries. While projects will utilize Rural Utility Service funding and may require Davis-Bacon Act compliance, a lack of prior RUS experience is not an automatic disqualifier. Evaluation is based on the firm's risk management profile, including sam.gov registration and Dun and Bradstreet PAYDEX scores, and their demonstrated ability to perform similar utility construction activities.
Power and Communication Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS