This Solicitation opportunity from Pennsylvania was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Western Berks Water Authority is soliciting sealed bids for Water Treatment Plant Improvements in Berks County, Pennsylvania, specifically for Contract Two (Plumbing) and Contract Three (HVAC). Bids must be submitted electronically via the PennBid portal by March 6, 2026, at 11:00 a.m. Bidders are required to provide a bid security of 10 percent of the lump sum base bid, and the successful awardee must provide a performance bond for 100 percent of the bid amount. The project is partially funded by the Pennsylvania Infrastructure Investment Authority (PENNVEST) and is subject to several federal and state regulations, including the Build America, Buy America (BABA) Act, the Commonwealth of Pennsylvania Steel Products Procurement Act, and the Federal Davis-Bacon Act Wage Determinations.
Contractors must demonstrate compliance with non-discrimination laws and federal Executive Orders regarding Disadvantaged Business Enterprises (DBEs). Specifically, bidders must document Six Good Faith Efforts to solicit DBE firms, as failure to provide this documentation may result in bid rejection. The scope of work involves comprehensive facility improvements, including the installation of a 3,000-gallon diesel fuel storage tank and associated grounding and testing. Performance acceptance is contingent upon successful on-site testing under various rated loads and the submission of manufacturer certifications. All work must adhere to strict industry standards, including NFPA, UL, and ASTM specifications.
HighAI Summary for 2.25.2026 WBWA ReBid of Contracts 2-3 Public Q&A: This document is a Public Q&A dated February 2026 related to the WBWA ReBid of Contracts 2-3. It contains questions and answers about bidding procedures, wage determinations, specifications for propane systems, responsibilities for LP system components, time extensions, trench work, and other contract-related clarifications. The Q&A references addenda and provides guidance on bid forms, contract awards, and technical specifications, including Federal Davis Bacon wage rates and project-specific requirements. The document serves as an important source of clarifications for bidders and contractors involved in the project.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for 66476 Contract 4 Bid Submission - DGS Supplier Search Instructions: This document provides detailed instructions on how to use the Pennsylvania Department of General Services (DGS) Supplier Search website for prime contractors involved in an equivalency project. It guides users on performing advanced searches to find Minority Business Enterprise and Woman Business Enterprise suppliers based on project size and county selection. The instructions emphasize selecting suppliers servicing at least one selected county and provide an example using the UNSPSC code for concrete. The document also explains exporting search results to Excel and the importance of soliciting suppliers regardless of their main office location to meet the Six Good Faith Efforts required by the DBE application. The guidance is intended to assist contractors in subcontracting and purchasing equipment, supplies, labor, and services effectively.
PDF
PDF, High priority: read this firstbid-pricing-submission
HighAI Summary for 66476 WBWA Conts 2&3 Plumbing-HVAC Bid Pricing Submission October 2025: This document is a bid pricing submission for contracts 2 and 3 related to plumbing and HVAC work for the WBWA project, dated October 2025. It includes detailed pricing information from multiple contractors, such as Blooming Glen Contractors, Michael F. Ronca and Sons Inc., and Pact Two, LLC. The document shows base bid pricing, allowances for permits and testing, and supplemental unit prices. It highlights the lowest prices and selected items for evaluation in the bidding process.
PDF
PDF, High priority: read this firstbid-drawings
HighAI Summary for 66476 WBWA Electrical Construction Pricing Bid Drawings: This document titled '66476 WBWA BidDrawings.pdf' contains detailed bid pricing information for electrical construction. It includes a legend explaining color coding for lowest prices and selected items. The sheet presents a comparison of bids from vendors Brendan Stanton Inc. and Garden Spot Electric, Inc., showing unit prices, total costs, and allowances such as fees for local construction permits and relocation of existing conduit and wires. The document is critical for evaluating bid prices and selections for the contract.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for 66476 WBWA Water Treatment Plant Improvements Plumbing/HVAC Project Manual: This Project Manual dated October 2025 is for the Western Berks Water Authority Water Treatment Plant Improvements, specifically Contract Two/Three covering Plumbing and HVAC work. It includes procurement and contracting requirements, general and technical specifications arranged in CSI format, and detailed sections on plumbing and HVAC systems. The manual outlines bidding instructions, contract conditions, performance and payment bonds, and regulatory compliance including federal wage determinations and Buy America Act provisions. The project involves multiple contracts for general construction, plumbing, HVAC, and electrical work, with funding assistance from PENNVEST and other sources. The manual serves as a comprehensive guide for bidders and contractors to ensure compliance and successful project execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 6 - WBWA Water Treatment Plant Improvements BABA and DBE Compliance: This document is Addendum 6 for the Western Berks Water Authority Water Treatment Plant Improvements project. It provides additional information regarding compliance with the Build America Buy America (BABA) requirements and Disadvantaged Business Enterprise (DBE) efforts for prospective bidders. The addendum outlines product categories covered by BABA, methods for demonstrating compliance, contractor responsibilities during bidding and after award, and guidance on DBE outreach and documentation. It emphasizes that bids will not be excluded if full compliance information is not available at submission, provided good-faith efforts are made. Contact information for assistance with BABA and DBE requirements is also included.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for Water Treatment Plant Improvements Contract Four Electrical Work: Addendum No. 1 dated December 5, 2025, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract Four: Electrical Work. This addendum revises several specification sections including Instructions to Bidders, Summary of Work, Temporary Utilities, Conduits for Electrical Systems, and Fire Detection and Alarm. It includes pre-bid meeting notes and attendance sheets for informational purposes. The document outlines revisions to bidding instructions, qualifications required of bidders, examination of bidding documents, and site access provisions. Bidders must acknowledge this addendum in their bid submissions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for Water Treatment Plant Improvements Contract One: This document is Addendum No. 1 dated December 5, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority in Sinking Springs, Pennsylvania, Contract One: General Construction. It revises the original bidding documents dated October 2025, including updates to the Table of Contents, Instructions to Bidders, Bid Form, and multiple specification sections such as Summary of Work, Price and Payment Procedures, Temporary Utilities, Lead Abatement, and Fiberglass Reinforced Plastic Baffle Walls. It also adds new specification sections for Fiberglass Reinforced Grating and Fiberglass Reinforced Railing and Ladders. Pre-bid meeting notes and attendance sheets are included for informational purposes. The addendum must be acknowledged in the bid form submitted by bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for Water Treatment Plant Improvements Contract Two/Three Plumbing/HVAC: This document is Addendum No. 1 dated December 5, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority in Sinking Springs, Pennsylvania, specifically for Contract Two/Three: Plumbing/HVAC. It revises bidding documents originally dated October 2025, including updates to Instructions to Bidders and several specification sections such as Summary of Work and Temporary Utilities. The addendum includes pre-bid meeting notes and attendance sheets for informational purposes. Key content covers revisions to bidding instructions, qualifications of bidders, examination of bidding documents, and site access provisions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for Water Treatment Plant Improvements Electrical Work: Addendum No. 1 dated December 5, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority, Contract Four: Electrical Work. This document revises bidding documents originally dated October 2025, including updates to Instructions to Bidders and multiple specification sections. It includes pre-bid meeting notes and attendance sheets for informational purposes. The addendum requires acknowledgment in the bid form and details revisions to bidding instructions, qualifications of bidders, and examination of bidding documents and site conditions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Contract Four Electrical Work - Western Berks Water Authority: This document is Addendum No. 2 dated December 19, 2025, for the bidding documents related to Contract Four: Electrical Work for the Western Berks Water Authority Water Treatment Plant Improvements project in Sinking Springs, Pennsylvania. It includes revisions to the Table of Contents and Advertisement for Bids sections, and adds a new specification section for Diesel Electric Generators (26 32 13.13). The addendum must be acknowledged in the bid form submitted by bidders. The project involves multiple contracts including general construction, plumbing, HVAC, and electrical work, with the electrical contract being the focus of this addendum.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Water Treatment Plant Improvements Contract One: This document is Addendum No. 2 dated December 19, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority, Contract One: General Construction. It revises bidding documents originally dated October 2025, including updates to the Table of Contents, Advertisement for Bids, and several specification sections such as Concrete Manholes and Process Monitoring and Control Systems. It also adds new specification sections for Rock Anchor and Storm Drainage Utilities. The addendum must be acknowledged in the bid form submitted by bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Water Treatment Plant Improvements Contract Two/Three Plumbing/HVAC: Addendum No. 2 dated December 19, 2025, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract Two/Three: Plumbing/HVAC. This document revises the original October 2025 specifications and includes changes to the Advertisement for Bids section. It outlines the project scope, bidding instructions, applicable laws and regulations, mandatory pre-bid conference details, and requirements for bid submission including DBE solicitation documentation. The addendum must be acknowledged in the bid form submitted by bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Water Treatment Plant Improvements Electrical Work: This document is Addendum No. 2 dated December 19, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority in Sinking Springs, Pennsylvania, specifically for Contract Four: Electrical Work. It revises bidding documents originally dated October 2025, including updates to the Table of Contents and Advertisement for Bids sections, and adds a new specification section for Diesel Electric Generators (Section 26 32 13.13). The addendum must be acknowledged in the bid form submitted by bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 for Contract Four Electrical Work - Water Treatment Plant Improvements: This document is Addendum No. 3 dated December 30, 2025, for the bidding documents of Contract Four: Electrical Work for the Water Treatment Plant Improvements for Western Berks Water Authority in Sinking Springs, Pennsylvania. It includes revisions to specifications, specifically to Section 01 20 00 - Price and Payment Procedures and Section 26 05 03A - Appendix A - Control Signal Cable Schedule, as well as revisions and additions to electrical drawings. The addendum details changes in payment procedures, partial payments, cost escalation, incidental costs, and lump sum bid form allowances. It also provides updated cable schedules and electrical diagrams relevant to the contract work.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 for Contract Four Electrical Work - Water Treatment Plant Improvements: This document is Addendum No. 3 dated December 30, 2025, for Contract Four: Electrical Work related to the Water Treatment Plant Improvements for Western Berks Water Authority in Sinking Springs, Pennsylvania. It revises bidding documents including specifications and drawings, specifically sections on price and payment procedures and control signal cable schedules. The addendum details changes to payment terms, partial payments, cost escalation, incidental costs, and lump sum bid form allowances. It also includes revisions and additions to electrical drawings and specifications, which bidders must acknowledge in their bid forms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 for Water Treatment Plant Improvements Contract One: This document is Addendum No. 3 dated December 30, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority, Contract One: General Construction. It revises bidding documents including specifications and drawings, with detailed changes to sections on price and payment procedures, water process piping, process monitoring and control systems, and vertical suspended centrifugal pumps. The addendum includes revisions to specification pages and drawings, and adds a new appendix for existing Wonderware HMI screens. It outlines measurement and payment terms, partial payments, cost escalation, incidental costs, lump sum bid form details, and supplemental unit prices. This addendum must be acknowledged in the bid form submitted by bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 for Water Treatment Plant Improvements Contract Two/Three Plumbing/HVAC: This document is Addendum No. 3 dated December 30, 2025, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract Two/Three Plumbing/HVAC. It revises the specifications, specifically Section 01 20 00 - Price and Payment Procedures, updating pages 01 20 00-1 and 01 20 00-2. The addendum includes detailed revisions on measurement, progress and partial payments, cost escalation, incidental costs, and lump sum bid form allowances. It requires acknowledgment in the bid form and is integral to the contract bidding process.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 for Water Treatment Plant Improvements Electrical Work: Addendum No. 3 dated December 30, 2025, for the Water Treatment Plant Improvements project for Western Berks Water Authority, Contract Four: Electrical Work, Engineer's Project No. 066476. This addendum revises bidding documents including specifications and drawings. Key revisions include updates to Section 01 20 00 - Price and Payment Procedures and Section 26 05 03A - Appendix A - Control Signal Cable Schedule. Revised drawings include electrical site plan, one line diagram, panel schedules, and equipment schedules, with an added electrical motor controls diagram. The addendum details measurement and payment procedures, partial payments, cost escalation, incidental costs, and lump sum bid form allowances for permits and electrical conduit work.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for Water Treatment Plant Improvements Contract Four Electrical Work: Addendum No. 4 dated January 14, 2026, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract Four: Electrical Work, Engineer's Project No. 066476. This addendum revises sections including Instructions to Bidders and the Bid Form, with changes tracked in the specifications. It includes updated instructions on bidder qualifications, submission requirements, site access dates, and clarifications on available project information and hazardous environmental conditions. Bidders must acknowledge this addendum in their bid submissions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for Water Treatment Plant Improvements Contract One: Addendum No. 4 dated January 8, 2026, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract One: General Construction, Engineer's Project No. 066476. This addendum revises and adds specific drawings related to piping plans and pre-treatment discharge bed details. It includes general structural notes on concrete design, reinforcement, and construction requirements. The addendum must be acknowledged in the bid form submitted as part of the bid.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for Water Treatment Plant Improvements Contract Two/Three Plumbing/HVAC: This document is Addendum No. 4 dated January 14, 2026, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority in Sinking Springs, Pennsylvania, specifically for Contract Two/Three: Plumbing/HVAC. It revises sections of the original bidding documents dated October 2025, including Instructions to Bidders and the Bid Form. The addendum includes changes to bidding instructions, qualifications of bidders, examination of bidding documents, site access, and related procedural requirements. It mandates acknowledgment of the addendum in the bid form and provides updated instructions and clarifications for bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for Water Treatment Plant Improvements Electrical Work: Addendum No. 4 dated January 14, 2026, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract Four: Electrical Work, Engineer's Project No. 066476. This addendum revises sections including Instructions to Bidders and the Bid Form, with changes tracked in the specifications. It outlines bidder qualifications, submission requirements, site access dates, and clarifies responsibilities regarding subsurface conditions, hazardous environmental conditions, and underground facilities. Bidders must acknowledge this addendum in their bid submissions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for WBWA Plumbing-HVAC Bid Spec Submission Oct 2025: This document is Addendum No. 4 dated January 14, 2026, to the bidding documents for the Water Treatment Plant Improvements for Western Berks Water Authority, Contract Two/Three: Plumbing/HVAC, originally dated October 2025. It includes revisions to the Instructions to Bidders and the Bid Form sections, with changes tracked in the specifications. The addendum updates bidding instructions, qualifications of bidders, examination of bidding documents, and site access details. Bidders must acknowledge this addendum in their bid submissions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No 4 to Combined Contract 2-3 Electrical Construction Pricing: This document is Addendum No 4 to the Combined Contract 2-3, focusing on Electrical Construction Pricing (BT-89UV). It includes detailed bid pricing comparisons between vendors Brendan Stanton Inc. and Garden Spot Electric, Inc., highlighting base bid pricing, allowances for local construction permits, and relocation of existing conduit and wires. The document identifies lowest prices and selected items, providing unit prices and total costs for each bid item. The addendum serves to update or clarify contract pricing details as part of the procurement process.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 5 for Water Treatment Plant Improvements Contract One: Addendum No. 5 dated January 14, 2026, for the Water Treatment Plant Improvements project for Western Berks Water Authority, Contract One: General Construction. This addendum revises bidding documents including Instructions to Bidders, Bid Form, specifications, and drawings. Key revisions include updates to Section 00 21 13 (Instructions to Bidders), Section 00 41 00 (Bid Form), Appendix A Instrument Specification Forms, and drawing D-4. The addendum must be acknowledged in the bid form submitted by bidders. It provides clarifications and changes to bidding instructions, qualifications, and project specifications to ensure accurate and compliant bid submissions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 5 for Water Treatment Plant Improvement WBWA Contract Two/Three Plumbing HVAC: Addendum No. 5 dated February 19, 2026, for the Water Treatment Plant Improvement project for Western Berks Water Authority, Contract Two/Three Plumbing/HVAC. This document revises bidding documents originally dated October 2025, including updates to specifications for facility water distribution, propane gas service, and adds a new section on storm drainage piping. It includes revisions to the advertisement for bids, bidding instructions, and references to applicable laws and regulations. The addendum must be acknowledged in the bid form and submitted with the bid.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 6 for WBWA Water Treatment Plant Plumbing/HVAC Contract Two/Three: This document is Addendum No. 6 dated February 25, 2026, for the Western Berks Water Authority Water Treatment Plant Improvement project, Contract Two/Three: Plumbing/HVAC. It revises bidding documents originally dated October 2025, including updates to the Bid Form (Section 00 41 00), Price and Payment Procedures (Section 01 20 00), and multiple drawing sheets (MP-5 through MP-17). The addendum must be acknowledged in the bid submission and includes tracked changes to specifications and drawings to clarify or modify the original contract requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Combined Contract 2-3 Addendum No 4 HVAC Construction Pricing: This document is Addendum No 4 to Combined Contract 2-3, focusing on HVAC Construction Pricing (BT-12OR). It includes detailed bid pricing information such as base bid, allowances for local construction permits, and multi-contract discounts. The document highlights pricing selections, lowest bids, and total costs for the HVAC contract, with specific monetary values and quantities required. The addendum serves to update or clarify pricing and contract terms related to HVAC construction work.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 1 Addenda 1 Combined Pricing Summary: This document titled 'Contract 1 Addenda 1 Combined' provides a detailed pricing summary for a construction contract. It includes bid pricing from multiple contractors, such as Blooming Glen Contractors, Inc., Michael F. Ronca and Sons Inc., and Pact Two, LLC, with total costs and selected items highlighted. The document outlines base bid pricing, allowances for permits, testing services, and rehabilitation, as well as supplemental unit prices for disposal of contaminated soil. The data indicates lowest prices and selections for various bid items, serving as an important reference for contract award and cost evaluation.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Contract 1 Addendum 2 Combined Pricing Summary 12-19-25: This document is an addendum (Addendum 2) to Contract 1, dated December 19, 2025. It contains detailed pricing information related to HVAC construction, including base bid pricing, allowances for local construction permits, and multi-contract discounts. The document highlights selected items, lowest prices, and total costs for the contract. It serves as a modification to the original contract, updating pricing and bid selections.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 1 Addendum NO 3 - Geotechnical Recommendations for Western Berks Water Authority Treatment Plant Upgrade: This document dated 8/2/2024 provides geotechnical recommendations for the Western Berks Water Authority Treatment Plant Upgrade in Lower Heidelberg Township, Berks County, Pennsylvania. It includes site geology, subsurface conditions from borings drilled in July 2024, and design recommendations for foundations of the PFAS treatment facility, Clearwell, and High Service Pump Station. The report details soil and bedrock characteristics, groundwater measurements, and foundation types including shallow and deep foundations with micropiles. It also recommends seismic design criteria and modulus of vertical subgrade reaction for structural design.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for Water Treatment Plant Improvements Contract One Project Manual October 2025: This Project Manual dated October 2025 is for the Water Treatment Plant Improvements for Western Berks Water Authority in Sinking Spring, Pennsylvania, under Contract One: General Construction. It is prepared by Gannett Fleming, Inc. The manual is organized according to the Construction Specifications Institute (CSI) format and includes procurement and contracting requirements, general requirements, existing conditions, concrete, masonry, metals, wood/plastics/composites, thermal and moisture protection, openings, finishes, specialties, earthwork, exterior improvements, utilities, process integration, material processing and handling equipment, process gas & liquid handling, and water and wastewater equipment. Key sections include instructions to bidders, bid forms, bonds, agreements, general and supplementary conditions, quality control, temporary utilities, demolition, concrete work, roofing, doors, finishes, site clearing, piping, and process control systems.
PDF
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for Western Berks Water Authority Water Treatment Plant Improvements Contract Four Electrical Work Advertisement for Bids: This document is the Advertisement for Bids for the Western Berks Water Authority Water Treatment Plant Improvements, Contract Four: Electrical Work, dated October 2025. It outlines the project scope including construction of a second clear well, filter reconstruction, electrical upgrades, and other site improvements. Bids are to be submitted online via PennBid by January 8, 2026. The document includes bidding instructions, bonding requirements, applicable laws and regulations such as the Build America, Buy America Act, and federal wage determinations. It emphasizes non-discrimination requirements and references the project manual for detailed provisions.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for 66476 WBWA Conts 2&3 Plumbing-HVAC Bid Spec Submission Instructions: This document provides detailed instructions on how to use the DGS Supplier Search website for prime contractors involved in the 66476 WBWA Conts 2&3 Plumbing-HVAC project scheduled for October 2025. It guides users on selecting appropriate counties, supplier classifications, and UNSPSC codes to identify and solicit suppliers, emphasizing compliance with Six Good Faith Efforts for DBE applications. The instructions include steps for exporting supplier lists and reminders to reset the search before new queries. The document aims to facilitate proper subcontracting and purchasing processes for the project.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for 66476 WBWA Pre-Bid Site Visit Sign In Sheet: This document is a pre-bid site visit sign-in sheet for the Western Berks Water Authority Water Treatment Plant Improvements project, dated December 8, 2025. It lists attendees with their names, firms, and email addresses who participated in the site visit, providing a record of interested parties prior to the bidding process.
PDF
PDF, Low prioritypre-bid-sign-in-sheet
LowAI Summary for 66476 Western Berks Water Authority Pre-Bid Site Visit Sign-In Sheet: This document is a pre-bid site visit sign-in sheet for the Western Berks Water Authority Water Treatment Plant Improvements project, dated December 17, 2025. It lists attendees including their names, firms, and email addresses who participated in the pre-bid site visit. The sheet serves as a record of interested parties visiting the site prior to bidding.
PDF
PDF, Low priorityamendment
LowAI Summary for Contract 1 Addendum 2 Combined 12-19-25: This document appears to be an addendum (Addendum 2) to Contract 1, dated December 19, 2025. The content is largely unreadable or missing, with only page numbers and page splits visible. Due to the lack of substantive content, no detailed information about changes or additions to the contract can be provided.
PDF
PDF, Low priorityother
LowAI Summary for Contract 1 Addendum NO 3 - BABA Waiver Information Checklist: This document is an information checklist for project-specific Buy America Build America (BABA) waiver requests. It provides guidance to ensure necessary information is submitted to the EPA for waiver applications, including types of waivers (nonavailability, public interest, unreasonable cost), project summaries, cost estimates, supplier information, and documentation requirements. The checklist is for informational purposes and is not required to be included in waiver applications.
PDF
PDF, Low priorityamendment
LowAI Summary for Contract 1 Addendum No 5: This document appears to be an addendum (No 5) to Contract 1. The content is largely unreadable or missing, with only page numbers visible and no substantive text to analyze. The document likely modifies or adds to the original contract but lacks detailed information in the provided content.
PDF
PDF, Low priorityother
LowAI Summary for Information Checklist for Project-Specific BABA Waiver Requests: This document is an information checklist designed to assist in the submission of project-specific Buy America Build America (BABA) waiver requests to the EPA. It outlines the necessary information and supporting documentation for different types of waivers including nonavailability, public interest, and unreasonable cost waivers. The checklist includes general information requirements, such as project summaries, cost estimates, and funding breakdowns, as well as specific documentation needed to demonstrate product availability, public interest justification, and cost comparisons. The document serves as a guide to ensure completeness and compliance with EPA procedures but is not itself a waiver application.
PDF
PDF, Low prioritypre-bid-sign-in-sheet
LowAI Summary for Western Berks Water Authority Pre-Bid Site Visit Sign-In Sheet December 2025: This document is a pre-bid site visit sign-in sheet for the Western Berks Water Authority Water Treatment Plant Improvements project, dated December 8, 2025. It lists attendees with their names, firms, and email addresses who participated in the site visit, providing a record of interested parties prior to the bidding process.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Western Berks Water Authority Water Treatment Plant Improvements Pre-Bid Site Visit Sign In Sheet December 2025: This document is a pre-bid site visit sign-in sheet for the Western Berks Water Authority Water Treatment Plant Improvements project, dated December 17, 2025. It lists attendees including their names, firms, and email addresses who participated in the pre-bid site visit. The document serves as a record of interested parties and potential bidders who visited the site prior to submitting bids.
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Solicitation number changed from Western Berks Water Authority, Berks County to 219371. The notice description changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Ref. #: Western Berks Water Authority, Berks County WESTERN BERKS WATER AUTHORITY will receive sealed bids via the online PennBid Program for CONTRACT TWO – PLUMBING AND CONTRACT THREE – HVAC related to WATER TREATMENT PLANT IMPROVEMENTS until March 6, 2026, 11:00 a.m. at which time bids will be opened. All bid documents are available online at https://pennbid.bonfirehub.com/ All Bidders must submit a bid security in the amount of 10% of the lump sum base bid. The successful bidder will be required to provide a performance bond in the amount of 100% of the successful bid amount. Each Bid shall be accompanied by a certified check, bank money order, or a Bid Bond in an amount not less than 10 percent of the Bid total, payable to the Owner in accordance with the Instructions to Bidders. Laws and regulations applicable to this Contract include the following: Commonwealth of Pennsylvania "Steel Products Procurement Act" - Act No. 3 of l978 as amended Application of American Iron and Steel Requirements to Fiscal Year 2016 Drinking Water State Revolving Funds under the Consolidated Appropriations Act, 2016 U.S. Department of Labor Federal Wage Determination Decision. Bidders are subject to all applicable provisions of the Federal Davis Bacon Act Wage Determinations as set forth in the Project Manual. Build America, Buy America (BABA) Act ("the Act"). Pub. L. No. 117-58, §§70901-52, as amended. Bidders are subject to all applicable provisions of the Build America, Buy America Act as set forth in the Project Manual. All contractors on this Project are required to ensure that employees and applicants will not be discriminated against because of race, creed, color, religion, sex, age, handicap, marital status or national origins; and, that the statutes and regulations of federal and state law regarding non-discrimination are met. Pennsylvania Infrastructure Investment Authority (PENNVEST) is providing a portion of the funding for this Project. Financing assistance has been requested from PENNVEST, other state funding sources, and/or other federal financial assistance programs for this Project and therefore all contractors are required to demonstrate compliance with federal Executive Orders 11625, 12138, and 12432 and EPA Regulations at 40 CFR Part 33, et al., through the detailed documentation of solicitation of Disadvantaged Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services and supplies by including state qualified DBE firms in the bidding process. Documentation of the solicitation efforts shall be submitted with the Bid. Failure to submit documentation of the DBE Solicitation may cause a Bid to be rejected.
More opportunities from Pennsylvania → Berks County