Remove tub/shower, and install an ADA shower in master bathroom
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project involves the removal of an existing tub and shower in a master bathroom and the installation of an ADA-compliant shower within a 1,500 square foot brick home on a slab foundation. The scope of work includes installing a low-entry shower base and surround using materials at least 1/4 inch thick, such as Swan-Stone, while specifically excluding FRP. The contractor must install a new Delta or comparable mixing valve and handle, two ADA grab bars, a portable seat, and an adjustable height handheld shower faucet with a separate guide rod. All necessary repairs to drywall, trim, flooring, and paint resulting from the installation must be completed. The contractor is responsible for obtaining all permits, managing line locates, providing all materials, and ensuring the site is cleaned and the yard is restored to mowing condition. All work must meet or exceed 2019 IRC standards. A mandatory site visit is required before submitting a bid, as change orders for conditions identifiable during the visit will not be approved. The homeowner or property manager will select all colors. This solicitation is issued by the Choctaw Nation Housing Authority for a project located in Atoka, Oklahoma, with a response deadline of September 23, 2026.
General Info
Agency
NAICS
Place of Performance
Atoka, OK, 74525, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view the job before bidding. The contractor is responsible for all line locates and permits required. Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed. PM- Tonie Johnson 580-380-5593 Insp.- Dustin Battles 580-317-735
Plumbing: Remove and replace tub/shower. Install new low entry shower base and surround, with Swan-Stone or comparable, must be a minimum of 1/4” thickness. Replace shower handle and mixing valve with Delta or comparable. Install 2 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.
Similar Contracts
Same NAICS industry code
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
