Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Transportation was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Renovation of the Thomas P. Stafford Building at the Mike Monroney Aeronautical Center

Closed
TPSRenovationFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

This is a market survey for the renovation of the Thomas P. Stafford Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma, with an estimated construction value between $20 million and $30 million. The project involves extensive upgrades to mechanical, electrical, and building systems, including replacement of air handling units, chiller systems, cooling towers, chilled water pumps, fire alarm systems, lighting, restroom finishes, roofing, and fire protection systems. Work will be conducted primarily during non-operational hours to minimize disruption to the FAA Academy’s training activities. A 100% performance and payment bond will be required upon contract award, which is projected for November 2027. The survey is not a solicitation for proposals and responses will be used solely for market research purposes; no payment will be provided for submitted information, nor will costs incurred by respondents be reimbursed. The survey aims to assess the capability of small businesses to perform this complex construction work, specifically to determine if adequate competition exists to set the project aside for small businesses under NAICS code 236220, with a size standard of $30.5 million. Interested vendors must submit a capability statement detailing their services, business size classification, past performance on projects over $25 million completed within the last five years, years in business, and bonding capacity. Respondents must be active in SAM.gov and provide documentation of at least one comparable large-scale commercial construction project. All submissions must be sent by email to Lisa Sedlacek-Ewers at the FAA no later than June 25, 2026, at 3:00 p.m. CT. This survey is informational only and does not constitute a commitment to procure.

General Info

FAA seeks experienced small businesses for $20-30M Stafford Building renovation; submit by June 2026.

Agency

Department Of Transportation → 6973GH Franchise Acquisition SvcsView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Oklahoma City, OK, 73169, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
Contacts1 person available
OfficeOKLAHOMA CITY, OK, 73125, USA
Organization / Agency
Department Of Transportation → 6973GH Franchise Acquisition Svcs
View Agency Profile
Office AddressOKLAHOMA CITY, OK, 73125, USA
Contacts
Lisa Sedlacek-Ewers

Full Description

Show more

*********************THIS IS A MARKET SURVEY ONLY*************************


- This is not a Screening Information Request or Request for Proposals of any kind;


- The FAA is not seeking or accepting unsolicited proposals;


- The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interested vendor’s expense.


- The responses to this market survey will be used for informational purposes only.  This is not a Screening Information Request or Request for Proposal of any kind.  The FAA is not seeking or accepting proposals at this time.


******************************************************************************


1. This is a market survey for a construction project titled: Thomas P. Stafford Building (TPS) Renovations at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.



2. The Magnitude of Construction is between $20,000,000 to $30,000,000.  The Contract Award is projected for November 2027.  Performance and payment bonds will be required in a penal sum equal to 100% of the contract price. 



The Headquarters Building (HQB) at the MMAC is a 222,130 GST building originally constructed in 1991 and is comprised of a basement and two floors above grade.  The Thomas P. Stafford Building (Building 27) at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City functions as a state-of-the-art training complex. It houses the FAA Academy, providing advanced classrooms and simulation laboratories for air traffic control and Technical Operations students and instructors. This project will upgrade the aging mechanical and electrical systems serving the building.  Work associated with construction of this project will be done primarily after hours (12:00 am to 6:00 am Monday through Friday) and weekends to prevent disturbance to classes while the building is occupied.



The work required for the facility will include the following:



  • Demolition and replacement of 5 knockdown construction semi-custom air handling units with provision for temporary packaged air handling units to continue HVAC service to spaces where the air handing units have been removed until new units have been installed.
  • Rebalancing of primary air to fan powered variable air volume boxes served by new air handling units for newly calculated heating and cooling loads.
  • Demolition of existing 180-ton chiller, cooling tower, condenser water pumps and associated condenser water piping.
  • Demolition and replacement of roof mounted relief air hoods and control dampers and pressure sensors for control of building relief air.
  • Demolition and replacement of building smoke evacuation fans and associated air dampers and associated controls.
  • Demolition and replacement of building chilled water pumps with new VFD controls.
  • Modify existing support structure and provide new 500-ton cooling tower with 1000 lb. jib crane and VFD.  Connect new tower into existing condenser water piping system.
  • Remove all pneumatic controls from equipment being replaced and provide DDC controls.
  • Provide demolition and replacement of the electrical infrastructure (conduit, circuits, short circuit protection, starters, overload protection, VFDs, harmonic filters, etc.) associated with each piece of new mechanical equipment. Provide a Short Circuit Current Review (SCCR) study, an Electrical Protection Device Coordination study, and an Arc-Flash Hazard Analysis (AFHA) study for any new transformers or panelboards added to the building.
  • Provide one-line diagrams capturing all revisions associated with electrical work.
  • Demolition and replacement of all corridors, entry atriums, and exterior stairs grid and ceiling tiles except for ceiling at second floor above the central atrium.
  • Demolition and replacement of all supply diffusers and return grilles in main circulation spaces where lay-in ceilings are to be replaced.
  • Demolition and replacement of the electrical infrastructure (conduit, circuits, short circuit protection, relays, etc.) for the Common Circulation Areas.
  • Demolition and replacement of all the remaining non-LED fixtures in the Common Circulation Areas (i.e. corridors, vestibules, coves, stairs) of the Basement, 1st, and 2nd Floors for both general and egress lighting purposes. This includes demolition and replacement of the existing fluorescent linear strip fixtures containing LED T8 lamps and the replacement of all exit lights/signs with new LED fixtures. Upgrade/replace the existing Common Circulation Areas lighting controls.
  • Replace finishes and fixtures in bathrooms on all floors. Replace wall tiles, countertops, sinks, faucets, partitions, paint ceilings and doors, new door push plates and kick plates. Provide temporary trailer restrooms to maintain current fixture counts during renovation of restrooms. Only one men’s and one women’s restroom in the facility shall be under construction at a time. ADA automatic door openers are to be protected during construction and/or re-installed and operational after renovation at restrooms in which they occur. Demolition and replacement supply diffusers and exhaust grilles in restrooms. Modify fire sprinklers serving restrooms as required. Upgrade/replace the Lighting and Lighting Controls as part of the coordinated restroom upgrades. LED lighting shall be used for both general lighting and egress lighting with footcandle illumination levels meeting both Life Safety required code levels and IES recommended target design levels.
  • Replace and upgrade the existing fire alarm system. Upgrade both detection and notification devices with new addressable devices. Upgrade both above-floor and under-floor devices. Upgrade remote annunciator stations. Upgrade existing FA conduits and conductors. Upgrade remote monitoring True Site Workstation programming and graphics.
  • Upgrade finishes in common circulation areas.  Replace breakroom millwork and layout near café on the first floor. Replace flooring in café. Paint all corridor walls to full height on all floors. Paint all gypsum wallboard ceilings in corridors and levels above the main entries. Remove circular signage at all doors and paint doors and door frames both sides. Replace with ADA compliant signage next to doors. Replace walk-off grating at all entrances to the building. Replace VCT flooring at all exterior stairwells and at corridor alcoves. Paint all door frames and window framing gray color in place of purple. Replace stair treads at four exterior staircases, new treads to include an abrasive edge to closely match what is installed at interior atrium staircases.
  • Provide a complete, code-compliant Emergency Responders Radio Communications System (ERRCS).
  • Replace chilled water computer room air conditioning (CRAC) units.
  • Demolish existing pre-action fire protection system (all valves, piping and sprinklers) and install new wet pipe fire protection system for the phase one portion of the building.  Demolish and replace all ceiling grid and tiles.


3. The purpose of this market survey is to solicit statements of interest and capabilities from small businesses, to include applicable small business socio-economic status, capable of providing the required construction services as well as to determine whether adequate competition exists to set-aside the competition among small businesses, to include applicable small business socio-economic status. 


The NAICS code applicable to this requirement is 236220 Commercial and Institutional Building Construction.  The business size standard for this NAICS is $30.5 million.



The following information shall be provided by interested vendors:

1. Capability Statement - This document should identify:


  1. Type of services provided by firm,
  2. Vendor’s business size for NAICS code 236220
  3. Size and type of services provided by previous contracts (provide detailed information and past performance),
  4. Number of years in business
  5. Evidence of at least one (1) successfully completed construction project greater than $25M in the past five (5) years (provide detailed information and past performance),
  6. Bonding Capability


Respondents must be active in the System for Award Management (SAM) (www.sam.gov).

All responses to this market survey must be received by Thursday, June 25, 2026, 3:00 p.m. CT.   All submittals should be submitted by email to: Lisa.A.Sedlacek-Ewers@faa.gov.

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS