Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPLACE NH159/SA SUBSTATION, PRIMARY NSA HR POWER NODE

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Mid-AtlanticView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
09/12/2023 08:04:24 (PST) : This project will replace the existing SA substation with a modernized equipment and designed for redundancy. The project will replace the 54 year old, unreliable substation transformer with a new 20MVA, 34.5kV – 11.5kV Substation transformer. The existing outgoing metal-clad switchgear will be replaced with dead-front, metal-clad, draw-out, switchgear assembly of vertical sections, each with 15 kV vacuum circuit breakers. The station grounding resistor will also be replaced with a new one. The project includes the installation of a new 35kV (SF6) 4-way switch that will add redundancy to SA Substation. Currently, SA is feed from the Navy South Switching Station circuit 15 (NS15). If this circuit goes down it will take several hours to reconfigure the distribution system to pick SA’s load. But with the new switch, SA Substation will have access to another Navy South circuit. If the primary feeder (NS15) goes down, power to SA Substation can be restored in less than an hour due to the addition of this 4-way switch. The project will include the salvage, demolition and removal of existing equipment.