Resilient-Seated Gate Valve Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the supply and installation of resilient-seated gate valves as part of upgrades to the water main system in New London, Connecticut. Scope of work includes all necessary excavation, valve connection to existing infrastructure, backfilling, and comprehensive leak testing to ensure system integrity and compliance with hydraulic standards. The work must be performed in accordance with project specifications to support operational reliability and long-term performance of the water distribution network. All materials and labor are the responsibility of the contractor, who must adhere to established safety, environmental, and quality control protocols throughout the installation process. This is a subcontract opportunity issued under NAICS code 238220 for specialty trade contracting, with a posted date and response deadline both set for August 12, 2026. The contracting authority is the Connecticut Department of Transportation, and performance is limited to the specified location in New London. Bidders must be prepared to meet all technical, scheduling, and regulatory requirements associated with municipal water system upgrades, including coordination with existing utilities and adherence to state and local construction codes. The project is not subject to a set-aside designation, and potential contractors should review the provided UI link for full solicitation details.
General Info
Agency
NAICS
Place of Performance
New London, CT, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
