Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Energy was posted on July 28, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFI - Wave Energy Converter - Use with Offshore Aquaculture

Closed
RFI-2023-06-16-MARTINFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 8 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

WA, USA

Set-Aside

NONE

Documents

1

PNNL RFI: Wave Energy Converter for Offshore Aquaculture

PDF, Low priorityrfi
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 12, 2023 to Sep 1, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Pnnl Contracts - DOE Contractor
Contacts2 people available
OfficeRichland, WA, 99352, USA
Office AddressRichland, WA, 99352, USA

Full Description

Show more
RESPONSES TO THIS RFI SHALL BE SENT BY EMAIL IN WORD OR PDF FORMAT TO: contact@example.gov with copy to contact@example.gov Battelle as operator of Pacific Northwest National Laboratory (PNNL) is requesting information from developers, owners, and/or manufacturers of wave energy converters (WECs) capable of deployment and operation of their WEC to power offshore aquaculture operations. This Request for Information (RFI) will be open for responses beginning on June 16, 2023 and ending on August 31, 2023 with responses submitted no later than 5:00 pm PDT. Respondents may answer as many or as few questions as they wish (see Information Requested in the attached document). The information gained from this RFI will inform the feasibility assessment and planning for co-location of wave energy and offshore aquaculture. The primary purpose of the WEC will be to provide electricity to an offshore aquaculture system for a potential future pilot or demonstration deployment and to further understanding of the potential to co-locate marine energy with offshore aquaculture from the perspective of a marine energy developer, owner, or manufacturer. This is not a Request for Proposal. PNNL is not contemplating deployment opportunities at this time and responses to this RFI do not bind PNNL to any further actions related to this topic.

More opportunities from Department Of Energy → Pnnl Contracts - DOE Contractor

Same awarding agency

NAICS: 332999
New
Federal
MITR Chemically Milled Plate
Solicitation # 0000964171
Solicitation 0000964171, issued by the Battelle Memorial Institute for the Pacific Northwest National Laboratory, seeks a firm-fixed-price proposal for the production of MITR HIP Can Study and Plate Feedstock. The scope of work includes non-reoccurring engineering, tooling design, and the fabrication of first articles and intermediate products. All deliverables must adhere to ASTM B209-14 standards and specific drawing requirements for pocket depth cladding. The required delivery date for these items is June 30, 2027. Award will be based on the lowest price among responsive offerors who meet all technical requirements. Proposals must include a capability statement, a detailed price proposal with lead times, and completed domestic representations and certifications, including Buy American Act compliance. Quality assurance is a critical component, requiring a pre-award evaluation of the contractor's quality system and the provision of material certifications from ISO/IEC 17025:2017 accredited laboratories. Strict packaging and marking protocols are mandated, including the use of 5MIL Mylar vacuum-sealed bags and fiber-enclosed skids with a maximum weight of 4,000 lbs. Parts must be uniquely identified via electrochemical etching or laser engraving with specific SAP, lot, and serial number formats. Payment terms are set at 30 days following the receipt of a proper electronic invoice.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 332999
New
Federal
HIP CAN Study
Solicitation # 0000963801
Battelle Memorial Institute, Pacific Northwest Division, is soliciting proposals for the MITR HIP Can Study under solicitation 0000963801. This Firm Fixed Price contract supports the United States High Performance Research Reactor project by fabricating plate components and feedstock, including various shims, pocket plates, and strongbacks made from 6061-T6 aluminum, 1018 carbon steel, and stainless steel. The scope includes non-reoccurring engineering and tooling design for HIP cans and lids, with a required delivery date of June 30, 2027, to Richland, Washington. Award will be granted to the responsive and responsible offeror providing the lowest price while satisfying all technical requirements. Technical specifications mandate strict adherence to dimensional tolerances, surface finishes, and the application of Neolube 1.1 debond agent. Components must be individually vacuum sealed in 5 mil Mylar bags and laser engraved or electrochemically etched with specific SAP, lot, and serial numbers. Quality standards require material certifications from ISO/IEC 17025:2017 accredited laboratories, and preference is given to contractors with National Aerospace and Defense Contractors Accreditation Program certification. Proposals must include a technical proposal, lead times, a company capability statement, and completed Representations and Certifications, including a Buy American Act Certificate.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

2 days ago

DEADLINE

in 15 days
View Details
NAICS: 561910
New
Federal
REQUEST FOR INFORMATION (RFI) - No.10826-RD [Mid‑energy electron beam (eBeam) systems - Application to Receive eBeam Irradiator Donation for Device Sterilization]
Solicitation # 10826-RD
Request for Information No. 10826-RD, issued by Battelle on behalf of the Department of Energy's Pacific Northwest National Laboratory (PNNL), seeks to identify a qualified medical industry partner to receive a donated mid-energy electron beam (eBeam) device for device sterilization. This sources-sought action is intended to collect information from interested companies to determine the most suitable recipient. The selected partner will be solely responsible for all costs and logistics associated with the equipment, including transportation, installation, maintenance, regulatory compliance, and any necessary site upgrades to accommodate the system. Interested organizations must submit a completed three-page application template, Attachment A, by November 4, 2026, to Randy Dykes. The application requires detailed information on the organization's medical need, technical rationale regarding dose processing and Dose Uniformity Ratio, a comprehensive implementation plan with milestones, and a self-assessment of opportunity readiness. PNNL will evaluate submissions at its sole discretion, focusing on the applicant's infrastructure, radiation safety and security preparedness, and the potential for product validation and cost savings. All responses must be submitted electronically and any proprietary information must be clearly marked.
Packaging and Labeling Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS