Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Roofing Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Oklahoma → Choctaw Nation Housing AuthorityView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Soper, OK, 74759, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
Oklahoma → Choctaw Nation Housing Authority
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full replacement of roof with 26-gauge painted metal roofing, matching existing appearance and performance standards.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
Terminal Envelope Upgrade - Roof Replacement Project (DBB)The Port of Seattle’s Aviation Facilities & Infrastructure division is preparing to undertake a roofing replacement project at a terminal facility, targeting the demolition and removal of approximately 13,600 square feet of existing roofing membrane and insulation, along with the associated flashing and roof drains. The project will involve complete removal and installation of a new roofing system to ensure structural integrity and weather resistance, with work scoped to include all related components critical to proper drainage and sealing. This initiative falls under NAICS code 238160, indicating it is a roofing contract, and is being managed as a design-bid-build procurement under the Terminal Envelope Upgrade program. The solicitation is listed as a forecast with a posted date of July 31, 2026, and is not currently open for bids, but interested parties should monitor the official portal for formal release. Primary contact for inquiries is Angela Peterson, reachable via phone or email, with John McWilliams serving as the project manager for technical coordination. Although specific location details are not provided in the data, the work will occur at a Port of Seattle aviation facility, and all performance activities are expected to align with federal and local building standards. No set-aside provisions are indicated, suggesting the contract is open to all eligible contractors.
Aviation Facilities & Infrastructure

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
SLED
Pier 69 Third Floor Terrace RepairThe contract entails the complete demolition of the existing roof system on the third floor east terrace at Pier 69, including removal of pavers, drainage mat, and waterproof membrane. It requires installation of a new roof system using a pedestal-supported design with thinner pavers to improve drainage efficiency and prevent water accumulation. A new barrier wall will be constructed and installed around the structural steel beams to protect them from future corrosion caused by moisture exposure. All materials removed during demolition, including planters and other components, must be carefully staged and reinstalled using a crane due to their size and weight. The work is scoped to ensure long-term durability and performance of the terrace structure while meeting drainage and structural integrity standards. The project is managed by the Port of Seattle through its Waterfront Project Management division and is classified under NAICS code 238160 for roofing contractors. The solicitation was posted on July 31, 2026, and is currently in forecast status with no set-aside type specified. Primary point of contact is Todd Rehm, reachable at 206-491-2899 or rehm.t@portseattle.org, with Samuel Hansen serving as the project manager. The full details and documentation are available through the Port of Seattle’s online solicitation portal, though no physical address or geographic specifics beyond Pier 69 are provided in the data.
Waterfront Project Management

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
SLED
Replace Roof on the Perry Maintenance Garage
Solicitation # DASIowa-645-DOTRFB-2950-2027
The Iowa Department of Transportation is soliciting bids for the complete replacement of the roof on the Perry Maintenance Garage, with work requiring the removal of all existing roofing materials including flashings, gutters, and downspouts to expose the underlying rigid insulation board. The new roof system must consist of mechanically fastened rigid polyisocyanurate insulation achieving an LTTR rating of R-30, covered by a 1/4-inch adhered cover board and a 60-mil adhered EPDM membrane. Additional tapered insulation must be installed to ensure proper drainage to existing roof drains, and new edge flashing, gutters, and downspouts must match the existing quantity, profile, and color. The curb height for roof vents and pipe penetrations must be raised to accommodate the increased insulation depth. Bidders must respond to both specified lines in the items section to be considered compliant, and all work must be performed while keeping the building operational. The contract has a proposed start date of September 1, 2026, with an anticipated completion date of October 15, 2026, and all work must comply with Iowa DOT supervision and inspection protocols, requiring advance notice of at least 24 hours before any installed component is ready for inspection. Payments will be made monthly at 97% of the value of completed work and acceptable materials stored on-site, determined by the Iowa DOT. The bid opening is scheduled for August 20, 2026, at 1:00 p.m. CT, with remote access available via a Teams meeting and phone conference. Site visits are highly recommended and will occur on August 10 and 11, 2026, with all questions to be submitted through the Q&A Board or via email to the designated point of contact only. The Iowa DOT will award the contract based on cost and other factors including past performance, staffing, and adherence to schedule, and the agency is tax-exempt. Davis-Bacon wage provisions do not apply to this project.
Iowa

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238160
New
SLED
IFB# 27181036 Quest Center North Roof Stabilization
Solicitation # BD-24-1157-00138-COB01-131950
The City of New Bedford is seeking qualified DCAMM Prime General Contractors certified in roofing to submit sealed bids for the Quest Center North Roof Stabilization Project at 1215 Purchase Street, New Bedford, Massachusetts. The work involves stabilizing the roof structure at the facility and requires certified expertise to ensure compliance with state standards. All bid documents are available through BidNet Direct, and only contractors holding the proper roofing certification will be considered eligible to respond to this solicitation. The project is managed under solicitation number BD-24-1157-00138-COB01-131950, with bids due by 8:00 PM on August 19, 2026, and was posted on July 30, 2026. The contract falls under the jurisdiction of the Massachusetts Purchasing Office and is subject to state procurement regulations. Geraldine Calheta serves as the primary point of contact for this solicitation, and interested parties must reference the official UI link on Commbuys for complete bid details and submission instructions. The place of performance is firmly located within New Bedford, MA, and all work must be performed on-site as specified. There is no set-aside classification specified for this contract, meaning it is open to all qualified contractors regardless of business size or ownership status. Bidders are responsible for reviewing all documentation thoroughly and ensuring their certifications meet the mandatory DCAMM roofing requirements before submission.
00138 - Purchasing

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238160
New
Federal
B6030 A/C Roof Sealant
Solicitation # FA466126R0006
The contract is for the application of a seamless, 80-mil, two-component aluminized polyurea spray-on roofing system over the existing roofs of Buildings 6030A and 6030C at Dyess Air Force Base, Texas, covering approximately 26,060 square feet. The work must extend fully to the roof edge and achieve a color match as close as possible to dark bronze, strictly adhering to the manufacturer’s specifications, the Statement of Work, and Attachment C, which details the aluminized polyurea roof coating system. The project requires extensive surface preparation including power washing, scraping, and scrubbing, with all Lightning Protection System components masked to prevent contamination. The final coating must meet strict performance standards including 85 ± 5 Shore A hardness, 225% ± 50% elongation, 2000 ± 200 PSI tensile strength, 250 ± PLI tear resistance, and permeability greater than 0.02 perm inch, all tested per ASTM standards. The contractor must arrange for a manufacturer’s inspection prior to warranty issuance and obtain third-party recertification of the Lightning Protection System in compliance with UFCs 3-110-03 and 3-575-01, with all test points tagged to the as-built roof plan. Any failed LPS components must be repaired at no additional cost to the government until certified. The contract is a total small business set-aside under NAICS code 238160, with evaluation based solely on lowest price technically acceptable. The period of performance is 120 calendar days from the Notice to Proceed, and all materials must arrive in manufacturer’s original unopened containers with full labeling including manufacturer, formula, lot number, color, date of manufacture, mixing instructions, shelf life, and curing time. Materials must be stored above 60°F, on wooden pallets, with drums rotated regularly and fitted with desiccants during use. MSDS must be on-site at all times. The contractor must provide temporary restrooms and power generation if needed, obtain approval for the lay-down area, and dispose of all debris off-base compliant with federal, state, and local regulations. Site access requires prior coordination for base entry, with a mandatory site visit on July 20, 2026, and a proposal submission deadline of August 6, 2026. Amendments have
FA4661 7 Cons Cd

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238160
New
Federal
Replace Repair Roof Bldg. 2414
Solicitation # W911SG26BA005
This contract, solicitation number W911SG26BA005, is a total small business set-aside under NAICS code 238160 for the repair and replacement of the roof, gutters, downspouts, interior ceilings, flooring, gypsum board walls, and installation of new light fixtures in Building 2414 at Fort Bliss, Texas. The estimated value of the project ranges from $1,000,000 to $5,000,000, and it is a firm-fixed-price contract requiring all bids to include an original bid guarantee per FAR 52.228-1, along with performance and payment bonds as mandated by FAR 52.228-15. Only small businesses meeting the $19 million size standard are eligible to bid. The work must be performed within 180 calendar days of the Notice to Proceed, and failure to meet this deadline will trigger liquidated damages of $1,717.14 per calendar day. Work will occur in an occupied facility, requiring strict coordination of activities to minimize disruption. The prime contractor must maintain a superintendent on-site at all times during construction; this is a key position that cannot be subcontracted. All work must comply with Unified Facilities Guide Specifications and Unified Facilities Criteria, specifically UFC 3-110-03 for roofing and UFGS standards for quality control, asbestos and lead remediation, waste management, and structural work. A comprehensive Quality Control plan, meeting FAR 52.246-12, must be submitted and approved before construction begins and must cover all aspects of work, including subcontractors and suppliers. The contractor is required to provide certified payrolls, weekly reports, daily logs, and a final warranty letter in both hard and electronic copy. All materials must be documented with Safety Data Sheets to prove the absence of asbestos, lead, and other regulated toxic substances, in alignment with Texas state regulations and federal standards. The contractor must comply with stringent safety protocols including OSHA 30-hour training, iWatch, OPSEC, and AT Level I certifications, and must follow USACE EM 385-1-1 and 29 CFR parts 1910 and 1926 for occupational safety. Personnel must be screened for personal identity verification under CFR clause 52.204-9, and all must be escorted when accessing secure areas of the installation
W6QM Micc-Ft Bliss

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238160
New
Federal
B6030 A/C Roof Repair
Solicitation # FA466126R0007
This contract, identified as solicitation FA466126R0007, is a total small business set-aside under NAICS code 238160 for the complete replacement of the standing seam metal roof on Building B6030 at Dyess Air Force Base, Texas. The scope includes removing the existing roof, which dates back to 1984 and 1988 and has deteriorated from vegetation damage, corrosion, and finish degradation, and installing a new, prefinished, standing seam metal roof system sourced entirely from a single manufacturer to ensure full compatibility and a minimum 20-year, no-dollar-limit leak-proof warranty covering UL-90 wind load parameters. The project involves approximately 24,823 square feet of roofing across multiple zones of the building, with requirements to remove and not reinstall the existing lightning protection system, phase work to prevent water intrusion during construction, and ensure all debris, metal filings, oils, and sealants are thoroughly cleaned from the surface prior to acceptance. Contractors must have a minimum of ten years of fabricator experience and two years of installer experience with this specific roofing system, and must submit quality certifications, laboratory QA/QC data, product samples, detailed engineering drawings, and a signed certification of truthfulness under penalty of law. The evaluation will be based strictly on the lowest technically acceptable price, with no weighting of factors beyond compliance with specifications. The period of performance is 180 calendar days from the Notice to Proceed, and site visits are scheduled for July 20, 2026, requiring base access requests be submitted by July 16, 2026. All technical questions must be submitted by July 22, 2026, and proposals are due August 6, 2026. The contract includes mandatory environmental compliance with CAA, OSHA, CERCLA, EPCRA, HMTA, and Texas state codes, requiring hazardous material inventories, SDS records, emergency eyewash stations, strict spill reporting protocols, and adherence to stormwater and air emission controls. An Environmental Management System compliance training is required prior to work commencement, coordinated through 7 CES/CEIE, and a Final Disposition Report and Customer Service Inspection Certificate must be submitted for acceptance. The government’s obligation is contingent solely upon the availability of appropriated funds, with no liability arising until written confirmation of funding is provided. Attachments include as-built roof plans, condition photos
FA4661 7 Cons Cd

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

NAICS: 236118
New
SLED
NON - FEDERAL
Solicitation # 166523
The contract requires a comprehensive renovation of a 3-bedroom, 2-bathroom brick home approximately 1500 square feet with a slab foundation and shingle roof to make it fully livable and move-in ready. All work must comply with the 2019 International Residential Code, and contractors are mandatory to conduct a site visit prior to bidding—no change orders will be accepted for conditions visible during that inspection. The contractor is fully responsible for securing all permits, conducting line locates, managing waste removal, restoring the yard to mowing condition, and coordinating with the property manager for color and material selections. The scope includes complete drywall replacement up to two feet from the floor, new waterproof vinyl plank flooring throughout with new baseboards, replacement of all windows with insulated low-E vinyl units and new screens and blinds, and installation of two new insulated metal entry doors and all interior doors with matching hardware. Plumbing work includes full replacement of supply and drain lines, new faucets and fixtures in both bathrooms and the kitchen, installation of two new commodes, and connection of the dishwasher. Electrical upgrades involve replacing all lighting fixtures, switches, outlets, smoke alarms, and can lights. Cabinets must be replaced with hardwood fronts and plywood bulkheads, new granite countertops installed, and matching backsplashes added. HVAC systems must be verified for code compliance, new vent covers and a thermostat installed. Tree and shrub removal, power washing, mulching, and fencing replacement are required, along with a new French drain system, topsoil grading, seeding, and sodding. Interior and exterior painting is required throughout including trim, doors, and garage. The contractor must supply and install a washer, dryer, and dishwasher; a refrigerator and stove are provided by the homeowner. Pest control treatment is mandatory, and the property must remain mowed until completion. All cleanup and site restoration are the contractor’s responsibility.
Residential Remodelers

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 238910
New
SLED
level yard to the west of home. This area of the yard has poor drainage and holds water. Make yard to where tenant can…
Solicitation # 168724
The project involves leveling and improving the drainage of the western yard area of a 3-bedroom, 2-bathroom brick home located in Atoka, Oklahoma, which currently retains standing water due to poor grading. The work requires using existing dirt from the old fence row on the west side of the property to fill and grade the low-lying area from south to north, with additional soil brought in as necessary to ensure proper slope and drainage. The finished grade must allow the tenant to easily maintain the area without water pooling, and sod must be installed upon completion. All exposed dirt must be covered to prevent erosion, and the entire area must be restored to a mowable condition. The contractor is responsible for all site preparation, line locates, permits, material calculations, waste removal, and cleanup. Work must comply with the 2019 International Residential Code and all applicable licensing requirements. The homeowner or property manager will determine all color selections. Contractors must visit the site prior to bidding; no change orders will be accepted for conditions that should have been identified during the site visit. Proposals must be submitted by August 13, 2026, and all inquiries should be directed to the Choctaw Nation Housing Authority Procurement Team.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 236118
New
SLED
Floor falling in - bathroom
Solicitation # 168606
The Choctaw Nation Housing Authority is soliciting bids for the complete renovation of a deteriorating master bathroom in a 4-bedroom, 2-bath pier-and-beam home located at 304 West 3rd, Heavener, OK 74937. The project requires full removal and replacement of the existing shower system with a low-entry base and surround made of Swan-Stone or an equivalent material at least 1/4 inch thick, with FRP strictly prohibited. All plumbing fixtures, including the shower handle, mixing valve, and faucet, must be Delta or comparable brand. The existing floor covering and damaged subflooring must be removed and replaced with a minimum 3/16-inch thick waterproof floating vinyl plank flooring, extended up to the floor flange, with the homeowner selecting all color finishes. The contractor must repair or replace all affected drywall, trim, and finish flooring, and complete a full cleanup, removal of waste debris, and restoration of the yard to mowing condition. All work must comply with the 2019 International Residential Code and applicable local licensing requirements, and the Davis Bacon Act wage standards apply since the project exceeds $2,000. A mandatory site visit is required before bid submission, and no change orders will be approved for conditions visible during that visit. The contractor is solely responsible for obtaining all permits, performing utility line locates, measuring materials accurately, and ensuring compliance with all specified standards. Bids must be submitted exclusively through the Housing Bid Board by 4:30 p.m. on August 8, 2026, with itemized pricing and a valid price-good date. The award will reflect Indian Preference, prioritizing Indian-owned business enterprises, and there is no indication of formal FAR clauses or federal contracting mechanisms beyond tribal policy. Payments will be processed via P.O. Box G, Hugo, OK 74743, with inspection and final acceptance conducted on-site by the assigned inspector.
Residential Remodelers

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 236118
New
SLED
ASA shower and commode
Solicitation # 169041
The contract entails the complete renovation of a shower and commode area in a 4-bedroom, 2-bathroom brick home with a slab-on-grade foundation and shingle roof, totaling approximately 1800 square feet. All existing plumbing fixtures must be removed and replaced, including installation of a new low-entry shower base and surround made from Swan-Stone or an equivalent material with a minimum thickness of 1/4 inch; FRP is prohibited. The shower must include a Delta or comparable handle and mixing valve, two ADA-compliant adjustable grab bars, an adjustable handheld shower faucet with its own guide rod separate from the grab bars, and a portable shower seat. The existing toilet, which has a malfunctioning flush mechanism, must be replaced with a new ADA comfort height model along with a new wax ring, shut-off valve, and supply line. Necessary repairs to the drain or flange must be made to resolve the slow-flushing issue, while ensuring all other fixtures continue to drain properly. All associated drywall, trim, subflooring, finish flooring, and painting necessary to complete the work must be repaired or replaced. All work must comply with the 2019 International Residential Code and require all applicable licenses, permits, and line locates to be secured by the contractor. Prospective bidders are required to conduct a site visit prior to submission, and no change orders will be permitted for conditions that could have been observed during that visit. The contractor is responsible for accurate material measurements, full cleanup, removal of all debris, and restoration of the yard to mowing condition. Color selections for finishes are to be determined by the homeowner or property manager. The project is managed by the Choctaw Nation Housing Authority in Poteau, Oklahoma, with final bids due by August 11, 2026. Contact for inquiries is available through Case Manager Ferne Gunn or Inspector Kevin Mings, and all submissions must align with the solicitation number 169041.
Residential Remodelers

POSTED

3 days ago

DEADLINE

in 12 days
View Details