Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Oregon was posted on April 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rooftop PV Solar Installation - SOU Art Buildings

Closed
2025-28State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
SLED
The Hub – Solar And Energy Infrastructure Project
Solicitation # 27-001SB
The City of Corona, California, is soliciting proposals under Bid #27-001SB for the The Hub – Solar And Energy Infrastructure Project, classified under NAICS code 221114 for solar electric power generation. The solicitation, posted on August 6, 2026, requires responses by September 17, 2026, and is open to all eligible contractors without a specified set-aside. The project’s performance location is set in Corona, CA, with a zip code of 92882, and primary point of contact is Scott Briggs, reachable via email and phone. Although the contract value is listed as $19, this figure is inconsistent with the scale of the project and likely represents a placeholder or error; no detailed pricing, line items, or cost breakdowns are provided in the documentation. Proposals must include mandatory certifications including a Non-Collusion Declaration, a Consultant’s Statement disclosing any prior contract disqualifications, and an acknowledgment of the Vendor Performance Evaluation Form, which will be used to assess contractor performance during and after project execution. No formal FAR clauses, contracting officer or COR details, payment instructions, invoicing systems, or accounting data are included in the available materials. The solicitation does not specify contract type, period of performance, delivery schedules, FOB terms, technical specifications, quality standards, or packaging requirements. While the overall scope centers on solar and energy infrastructure development, detailed technical deliverables, performance metrics, or applicable industry standards such as NEC or CALGreen are absent. Submission instructions lack clarity on format, media, page limits, or delivery method, though the need for signed physical declarations implies potential hard-copy requirements. No Unique Entity ID, CAGE code, size status, or socioeconomic certifications are requested, and there are no provisions for options, conflicts of interest, key personnel, or security clearances. The evaluation methodology, award basis, and criteria are not outlined, leaving the selection process entirely undefined in the provided documentation.
City of Corona

POSTED

23 days ago

DEADLINE

in 19 days

General Info

Agency

Southern Oregon UniversityView Agency

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

OR, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouthern Oregon University
ContactsNo contacts available
OfficeN/A
Organization / Agency
Southern Oregon University
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project is to design and install rooftop, grid-tied PV systems on two SOU campus buildings, the Art Building (545 Indiana Street, Ashland) and the Marion Ady Building (1280 Siskiyou Boulevard, Ashland). The PV panels will be installed on 24 gage, standing-seam metal roofs that were constructed in 1999.