Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on December 6, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S--Inspect & Repair Smoke & Fire Barriers

Closed
36C24419Q0131Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541350
New
SLED
Campus Consulting – Inspector Of Record (IOR) Services
Solicitation # RFP2026-06AM
California State University, Chico is soliciting proposals under RFP2026-06AM for a non-exclusive Task Order Service Agreement to provide on-site Inspector of Record or Construction Inspector services for various campus projects. The selected service provider will be responsible for quality control and ensuring code compliance in accordance with the California Building Code. Qualified inspectors must hold certifications from ICBO/ICC, OSHPD, or DSA, or be a licensed architect or registered engineer in California. The contract features an initial term of two years with the option to renew for two additional two-year terms. Proposals are due by November 12, 2026, and must include a standard fee schedule, detailed experience and staffing information, project history regarding construction costs, and sample inspection documentation. Evaluation will emphasize experience with higher education institutions, specifically within the California State University system. Awarded providers must register with the Department of Industrial Relations and maintain comprehensive insurance coverage, including a 4 million dollar general aggregate and specific workers compensation limits. Payments will be processed monthly in arrears upon submission of invoices in the CSU format and written approval from the project administrator.
California State University, Chico

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 541350
New
SLED
Districtwide Construction Inspection Services
Solicitation # 2027-07
The Solana Beach School District is soliciting qualifications under RFQ 2027-07 to establish a master agreement for districtwide construction inspection services. The scope of work encompasses both general construction-related consultant services and specialized inspection and materials testing. The District intends to create pools of prequalified firms, short-listing up to five of the most qualified firms per specialty to be assigned work on an as-needed basis via written task orders. The initial term of the agreement is one year, with the possibility of four one-year extensions for a total maximum duration of five years. Selection is based on qualifications rather than the lowest price, utilizing a 100-point scoring scale that emphasizes the depth of the firm's experience and the qualifications of proposed professionals. Minimum requirements include at least ten years of experience with California public K-12 projects, current DIR registration, and specific DSA certifications for project inspectors or laboratory of record status for materials testing. Awarded firms must comply with California prevailing wage laws, non-discrimination policies, and the Drug-Free Workplace Act. Invoicing occurs monthly and requires detailed documentation of time spent and work accomplished. Responses are due by November 10, 2026, and must include four hard copies and one electronic PDF copy on a USB drive for each specialty applied for.
Solana Beach School District

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 541350
New
SLED
Residential Energy Audit
Solicitation # NSD-RFQu-26-006
The City of Phoenix Neighborhood Services Department is soliciting offers for residential energy audit consulting services under solicitation NSD-RFQu-26-006. The resulting agreement will have a five-year term beginning December 1, 2026, or upon final recording by the City Clerk. The selected contractor will perform various technical assessments, including Manual J, Manual D, Manual S, Appliance, and CO2 audits. Deliverables include detailed electronic audit reports submitted via a secure portal, featuring property photographs and documentation of pre-existing and post-construction conditions. Performance timelines are strict, with standard audits required within two weeks of request and emergency audits scheduled within 24 hours and performed within three business days. Award decisions will be based on the most advantageous offer, with a heavy emphasis on the Statement of Qualification, which requires at least one year of relevant experience and detailed staffing and quality assurance narratives. Contractors must maintain valid professional licenses, adhere to City of Phoenix confidentiality and data protection standards, and ensure all personnel pass Police Department background checks. Compliance requirements include adhering to the Clean Air Act, Federal Water Pollution Control Act, and various nondiscrimination mandates such as Title VI of the Civil Rights Act. Additionally, contractors working outdoors must maintain a written heat safety plan in both English and Spanish. Invoicing is handled electronically in PDF format, with payments issued upon receipt of signed delivery or service tickets.
Neighborhood Services

POSTED

about 17 hours ago

DEADLINE

in 8 days
NAICS: 541350
New
Federal
H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, Base (4) Canandaigua VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Solicitation # 36C24227Q0041
The Department of Veterans Affairs is soliciting quotes for a Qualification of Elevator Inspectors (QEI)-Certified Inspector to serve as a third-party witness for annual and semi-annual safety inspections and testing at the Canandaigua and Bath VA Medical Centers in New York. This service-disabled veteran-owned small business set-aside under NAICS 541350 consists of a 12-month base period starting November 1, 2026, with four additional 12-month option years. The certified inspector is responsible for independent witnessing and reporting using VA Form 10-6167, while a separate maintenance contractor provides the labor and equipment to perform the physical tests. All work must comply with the most current ASME A17.1 and ANSI/ASME 17.2 codes. The scope of work includes semi-annual inspections, annual hydraulic pressure tests, and annual traction no-load tests during the base and final option years, with five-year traction full-load tests scheduled for Bath VAMC in option year one and Canandaigua VAMC in option year two. Services are typically performed in April and October. Award will be based on an evaluation of technical capability, past performance, and total price. Offerors must submit a technical capability statement of no more than 10 pages and adhere to New York State licensing and Service Contract Act wage determinations.
242-NETWORK Contract Office 02 (36C242)

POSTED

1 day ago

DEADLINE

in about 3 hours
NAICS: 541350
New
Federal
H259-- ELECTRICAL 5-YEAR ARC FLASH STUDY (VA-27-00002938)
Solicitation # 36C25227Q0050
The Department of Veterans Affairs is seeking a firm fixed price contract modification for a comprehensive Arc Flash Hazard Analysis at the Iron Mountain VAMC. The project requires a Registered Professional Electrical Engineer with at least five years of experience to oversee the study, which must comply with NFPA 70E, NFPA 70, and IEEE 1584 standards. The scope encompasses all significant electrical distribution locations from the utility supply down to 208V systems, including switchgear, motor control centers, and panelboards. The contractor will perform data gathering and field verification, a three-phase bolted fault short-circuit study, a protective device coordination study, and the calculation of incident energy and flash protection boundaries. Key deliverables include the installation of machine-printed arc flash warning labels, the adjustment of protective devices, and a final comprehensive report featuring time-current curves, fault current calculations, and updated electrical one-line diagrams in AutoCAD and PDF formats. The contractor must also conduct an exit briefing for facility staff to discuss hazard areas and NEC violations. All work must be completed within 180 days of the notice to proceed, with onsite activities performed during normal business hours. This procurement is intended as a sole source award to SDV Services Inc. under 41 U.S.C. 1901 simplified acquisition procedures to ensure consistency with ongoing electrical testing at the facility.
252-NETWORK Contract Office 12 (36C252)

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 541350
New
Federal
Aviation Operations Center (AOC)- Building Engineer Report (BER)
Solicitation # 15DDHQ27R00000001
Solicitation 15DDHQ27R00000001 is a request for proposals from the Department of Justice, Drug Enforcement Administration, to obtain a Building Engineer Report (BER) for the Aviation Operations Center (AOC) located at Alliance Airport in Fort Worth, Texas. This is a 100% small business set-aside procurement conducted under FAR Part 12 for commercial services, with the government intending to issue a single firm fixed price purchase order. The scope of work requires a comprehensive inspection of the building's interior, exterior, and grounds, covering structural elements, HVAC, plumbing, electrical, life safety, and force protection. Key deliverables include a summarized BER based on a Building Condition Assessment with cost estimates and photographs, a detailed scheduled operations and maintenance plan, and a list of potential energy conservation improvements. Proposals must be submitted electronically to Jose Marin by November 30, 2026, and must be divided into a technical volume and a business volume. The technical volume is limited to 20 pages and will be evaluated based on technical capability, key personnel qualifications, and past performance. These non-price factors are significantly more important than price, although price will be evaluated for reasonableness. Award will be based on the best value to the government. Contractors must comply with strict security requirements, including the submission of Facility Access Request forms, execution of non-disclosure agreements, and completion of mandatory cybersecurity and privacy training. Performance is structured across several tasks, with the final BER due two weeks after the review meeting.
Office Acquisition Management

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 541350
New
SLED
HSR26-26 Re-Bid #2 Fresno Building Inspection
Solicitation # HSR26-26
The California High-Speed Rail Authority is soliciting informal bids under solicitation HSR26-26 Re-Bid #2 for a comprehensive on-site building inspection and repair recommendation project for its Fresno Office located at 11111 H Street, Fresno, CA 93721. The selected contractor will be responsible for evaluating all major building systems, including plumbing, sewer, drainage, electrical, HVAC, roofing, security, the building envelope, and life-safety and structural components. Key deliverables include a comprehensive written inspection report with supporting photographs, an executive summary of critical risks, a prioritized list of corrective actions, and rough order-of-magnitude cost estimates for all recommended repairs. The project requires personnel knowledgeable in federal, state, and local building codes, as well as current safety and accessibility standards. The response deadline is November 6, 2026, and the solicitation is categorized under NAICS code 541350. Bidders must provide a valid Class A or Class B license from the California Contractors State License Board and submit several required documents, including a cost sheet, payee data record, and bidder certifications. Evaluation is based on cost reasonableness and past performance, with a 3% to 5% incentive applied for Disabled Veteran Business Enterprise participation. The contract includes strict compliance requirements regarding the Authority's Conflict of Interest Code, the Americans with Disabilities Act, and a ten-year confidentiality survival period. Invoicing is permitted monthly in arrears, and the final report is due five business days after the Authority provides feedback on the initial draft.
California High-Speed Rail Authority

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 541350
New
SLED
Operation and Management of the Building Department
Solicitation # AD-26-01
The City of Pembroke Pines is soliciting proposals under RFP AD-26-01 for the operation and management of its Building Department. The project utilizes a City-Provided Leadership Model, where the City retains the Chief Building Official and Building Department Operations Manager, while the contractor provides all other necessary administrative, clerical, and technical staff, including Assistant Building Officials, Trade Chiefs, Plan Reviewers, and Inspectors. The selected firm will be responsible for issuing permits, performing inspections, and executing statutory duties in accordance with the Florida Building Code and Broward County Amendments. The contract is for an initial five-year term with one five-year renewal option. Proposals are due by 2:00 pm on November 10, 2026, and must be submitted electronically via the City's e-Procurement Portal. Pricing is based on a proposed percentage of gross revenue derived from building permit fees, with specific daily rates established for key roles such as Assistant Building Officials at 1,500 dollars and Trade Chiefs at 1,000 dollars. Award decisions will be based on the most responsive and advantageous proposal, with preference points available for local Pembroke Pines vendors, Broward County vendors, and Veteran-Owned Small Businesses. Contractors must ensure all personnel have at least three years of relevant experience and hold required state and county certifications. Strict vehicle marking standards are required, including uniform colors and specific City of Pembroke Pines identification. The contractor must also implement a comprehensive Quality Assurance program to track performance metrics such as turnaround times and error rates. Required submittals include a Letter of Intent and a sworn Affidavit of Accuracy.
City Manager's Office

POSTED

3 days ago

DEADLINE

in 12 days
NAICS: 541350
New
SLED
OER Solar Quality Assurance Study and Report
Solicitation # RFP27007093
The State of Rhode Island Office of Energy Resources is soliciting a consultant under RFP27007093 to conduct a Quality Assurance Study and Report for the Renewable Energy Growth Program installations from the 2026-2028 program years. The selected consultant will perform on-site assessments by licensed electricians to ensure systems are safe, high quality, and compliant with NEC and state specifications. Key deliverables include a sampling memo for OER approval, standardized inspection reports for installers and homeowners, a customer feedback survey, and a final report presented in person to the DG Board. The initial contract term is three years starting approximately January 1, 2027, with the possibility of two additional 12-month renewals. Award decisions are based on a weighted scoring system of 106 points, requiring a minimum technical score of 55 points to proceed to cost evaluation. Bidders must provide a detailed cost proposal broken down by specific tasks, ranging from small-scale PV inspections to larger wind and hydropower projects. Mandatory requirements include a Supplemental Bidder Attestation regarding conflicts of interest, an ISBE participation plan for MBE, WBE, or Disability Business Enterprises, and professional certifications such as NABCEP. The consultant must also maintain significant insurance coverage, including 2 million dollars in professional liability and 1 million dollars in commercial general liability and automobile liability.
State of Rhode Island

POSTED

3 days ago

DEADLINE

in 21 days

General Info

NAICS

541350 - Building Inspection Services

Place of Performance

PA

Set-Aside

NONE

Documents

1

36C24419Q0131.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
ContactsNo contacts available
OfficePITTSBURGH, PA, 15215, USA
Office AddressPITTSBURGH, PA, 15215, USA
ContactsNo contact information available

Full Description

Show more
Sources Sought Notice - 36C24419Q0131 The intent of this Sources Sought Notice is to identify potential Small Businesses especially any SDVOSB/VOSB offerors capable of providing an Inspection and Repair of Fire and Smoke Penetrations as listed in the attached Statement of Work: These are for the VA Medical Center in WILKES BARRE VA MEDICAL CENTER, Responses to this Sources Sought Notice should demonstrate the firm's ability, capability, and responsibility to provide the principal components of supplies listed in the Statement of Work (See Below). Responses should include the following information: Business name Address Business point of Contact Current Duns Number All information is to be submitted via e-mail at contact@example.gov Information provided will not be returned. All responses shall be in the English Language. Responses are due by 12:00 pm NOON (EST) on 12/10/18. This is a Sources Sought Notice and submissions will be used for informational and planning purposes only. This notice does not constitute a formal Request for Quote (RFQ), nor is the government obligated to issue an RFQ. In addition, the Government does not intend to pay for any information provided under this notice. The Government is not obligated to notify respondents of the results of this survey. Statement of Work (SOW) Inspection and Repair of Fire and Smoke Penetrations Project No.: 693-FMS-18-CE002 SYNOPSIS: Work consists of the quarter annual (quarterly) inspection, repair and closure of 100% of penetrations, holes, seams or gaps up to 144-in2 (square inches) in size passing through any fire or smoke rated building feature using an approved fire-stop filler or other approved system for all buildings located at the Wilkes-Barre VAMC Campus. The Wilkes-Barre VA Medical Center Campus consists of 13 occupied building with approximately 690,000 square feet of indoor conditioned space. Seven of the buildings are detached. The remaining buildings are attached together to create the main Medical Center Building consisting of approximately 600,000 square feet of clinical, administrative and support (boiler plant, warehouse) space. The largest building in the main Medical Center Building (Building No. 1) is 13 stories high and was constructed in 1950. TERM: It is anticipated that this Contract will be for 1-year with four (4) annual options to be awarded at the discretion of the Government. EXISTING CONDITIONS: Appendix A lists non-compliant fire and smoke penetrations that are known to exist in the facility and is provided for the convenience of the bidders. The citations in Appendix A were discovered during a recent quarterly inspection conducted as part of an existing contract. The list should not be considered to be complete and the Contractor will remain responsible for repairing ALL non-compliant penetrations discovered during inspections per the requirements of this Contract. 1.0 GENERAL 1.1 DESCRIPTION Contractor shall provide quarterly inspection, repair and closure of all openings up to 144- in2 in size against penetration of flame or heat discovered in fire resistant rated construction in accordance with National Fire Protection Agency (NFPA) 101 and 70. Contractor shall provide quarterly inspection, repair and closure of all openings up to 144- in2 in size against penetration of gases or smoke in smoke resistant rated construction in accordance with National Fire Protection Agency (NFPA) 101 and 70. 1.2 SUBMITTALS Manufacturer s literature, data, and installation instructions for types of firestopping and smoke stopping materials proposed for use. List of FM, UL, or WH classification number of systems installed. Certified laboratory test reports for ASTM E814 tests for systems only if NOT listed by FM, UL, or WH proposed for use. 1.3 DELIVERY AND STORAGE Deliver materials in their original unopened containers with manufacturer s name and product identification. Store materials in a location providing protection from damage and exposure to the elements. 1.5 WARRANTY Firestopping work is subject to the terms of the Article Warranty of Construction , FAR clause 52.246-21, except extend the warranty period to five years. 1.6 APPLICABLE PUBLICATIONS Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only. American Society for Testing and Materials (ASTM): E84-10 Surface Burning Characteristics of Building Materials E814-11 Fire Tests of Through-Penetration Fire Stops Factory Mutual Engineering and Research Corporation (FM): Annual Issue Approval Guide Building Materials Underwriters Laboratories, Inc. (UL): Annual Issue Building Materials Directory Annual Issue Fire Resistance Directory 1479-10 Fire Tests of Through-Penetration Firestops Warnock Hersey (WH): Annual Issue Certification Listings National Fire Protection Agency (NFPA): NFPA 101 Life Safety Code NFPA 70 National Electric Code 2.0 PRODUCTS 2.1 GENERAL Manufacturer of firestop products shall have been successfully producing and supplying these products for a period of not less than 3-years and shall be able to show evidence of at least 10 projects in a hospital environment where similar products have been installed and accepted. Contractor shall have a minimum of 3-years direct experience performing inspections of fire and smoke penetrations in rated construction in a hospital environment for compliance with applicable life safety codes. 2.2 FIRESTOP AND SMOKESTOP SYSTEMS A. Use either firestop sealant, factory built (Firestop Devices) or field erected (through-Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke. B. Through-penetration firestop systems and firestop devices tested in accordance with ASTM E814 or UL 1479 using the "F" or "T" rating to maintain the same rating and integrity as the fire barrier being sealed. "T" ratings are not required for penetrations smaller than or equal to 100 mm (4 in) nominal pipe or 0.01 m2 (16 sq. in.) in overall cross-sectional area. C. Products requiring heat activation to seal an opening by its intumescence shall exhibit a demonstrated ability to function as designed to maintain the fire barrier. D. Firestop sealants used for firestopping or smoke sealing shall have following properties: 1. Contain no flammable or toxic solvents. 2. Have no dangerous or flammable out gassing during the drying or curing of products. 3. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure. 4. When used in exposed areas, shall be capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface. E. Firestopping system or devices used for penetrations by glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials shall have following properties: 1. Classified for use with the particular type of penetrating material used. 2. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal. 3. Intumescent products which would expand to seal the opening and act as fire, smoke, toxic fumes, and, water sealant. F. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84. G. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814. H. Materials to be asbestos free. I. For exposed areas, use similar surface treatments as those on the surrounding wall or floor surface. J. For exposed areas, use similar surface treatments as those on the surrounding wall or floor surface. 2.4 MISCELLANEOUS Forming/Damming: Fiberglass, mineral fiber boards or blankets compatible with proposed firestopping per manufacturer s requirements. Firestop Collars: Prefabricated or molded collars, or prefabricated retaining strips of galvanized steel per manufacturer s requirements. Labels/Stenciling: Preprinted self-adhering smoke or fire rating labels with white background, 2-inch high red letters describing the rated assembly and 1-inch high black letters stating Protect all opening and penetrations. properly applied to a cleaned and/or painted surface. Caution Sticker: Vinyl non-fading self-adhesive label 4 x6 . See Attachment A. 3.0 EXECUTION 3.1 INSPECTIONS Inspect all fire and/or smoke rated walls, plenums, soffits, shafts, ceiling, floors and any other fire or smoke rated building feature(s) in accordance with the most current Facility Life Safety Plans to be provided to the Contractor by the Government. 3.2 ICRA BARRIERS/INFECTION CONTROL ICRA barriers and/or portable dust containments will be erected when required. At all times, however, Contractor shall employ necessary measures to minimize dust as necessary using HEPA vacuums to clean surfaces before proceeding, immediately replace ceiling tiles displaced for visual inspection and cleaning of any dust or debris that fall to floor. Dust barriers will meet Infection Control Risk Assessment standards. 3.3 DEMOLITION Installation of firestop systems may require removal of foreign material (including, but not limited to, drywall mud, mortar, spray foam, fireproofing, and structolite) to create required annular space to accept the appropriate firestop system. 3.4 REPAIR AND INSTALLATION Do not begin work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved. Repair all deficiencies identified during inspections. Install the approved UL rated firestop system per the manufactures instructions for all penetrations and joints which are currently not sealed (or the post installed firestop product surface area) up to 144-in2 found to be deficient or missing. Contractor may also repair the existing drywall, seams, joints and openings to meet UL/IBC requirements for rating. All firestop materials will conform to the American Society for Testing and Materials (ASTM) E 814, ASTM E 1966 and Underwriters Laboratories (UL) 1479, UL 2079 standards. Firestop product/system to be used will be approved by the Chief, Facility Management Service prior to application. Contractor will notify Facility Management Services of the location of any openings (i.e. holes and or joints) rated systems larger than 12 x 12 , or the aggregate square inch equivalent, which require repair not covered by this Contract. Systems listed by the approved testing agencies, as listed above, may be used providing they conform to the construction type, annular space requirement and fire rating involved in each separate instance. Dampered ducts will not be firestopped unless required in accordance with manufactures specifications. When field conditions do not match a UL system, Engineering judgments will be based on guidance set forth by the International Firestop Council (IFC) utilizing an existing UL firestop system that closely matches the individual field conditions 3.5 LABELING Contractor shall ensure that all fire/smoke resistance rated assemblies are properly identified using stenciling properly identifying the rating and by installing a Caution Label (see Attachment A). The stenciling and labeling shall be installed on each wall or assembly at a minimum or 12-feet on centers above ceilings and in mechanical/utility rooms. Apply to clean or painted surfaces only. 3.6 CLEAN-UP AND ACCEPTANCE As work in each area is completed, remove tools, materials, litter, and debris and leave area in a clean and orderly condition. 3.7 DOCUMENTATION All inspection and repair information will be recorded by the Contractor using an Electronic Drawings-based tracking and verification program that utilizes (facility provided) life safety drawings to denote all inspection points and deficiency locations. Points on the drawings shall be cross referenced to a database detailing the deficiency location, type, U.L. System deployed, product used, wall type and date/time of repair (See Exclusions and Clarifications below for more detail). All reports will be submitted electronically and in hard copy format on a quarterly basis within 30-days of the latest inspection. One (1) set of CDs/DVD electronic format will be submitted. Three (3) sets of hard copy format reports will be submitted. 4.0 MISCELLANEOUS 4.1 CONTRACTOR RESPONSIBILITIES The contractor shall obtain all necessary licenses and/or permits required to perform this work. Contractor s onsite supervisor shall have a minimum of 30-hour OSHA certification. Workers shall maintain a minimum of 10 hour OSHA certification The Contractor shall promptly report all accidents resulting in property damage and/or personal injury or death directly to the Government Representative and Contracting Officer. The Contractor shall follow all applicable codes and regulations and all work must be accomplished in a first class manner. Some portions of the work may have to be accomplished in other than normal working hours. The Contractor shall report to the Safety Office in room C6-63 or C6-64 daily prior to commencing work and will secure appropriate permits for work that day. All permits will be returned to the Safety Office at the end of the workday. The Contractor shall be responsible for complying with all environmental protection regulations promulgated by US Environmental Protection Agency (EPA) and Commonwealth of Pennsylvania Department of Environmental Protection (DEP). Any hazardous materials used by the Contractor in performing this contract shall be properly packaged and stored in a sealed container to avoid spills, and shall be promptly removed upon completion of the work. All spills of hazardous materials shall be reported immediately to the Contracting Officer and shall be cleaned up immediately by the contractor at his own expense in accordance with EPA and DEP regulations. Clean up wastes shall be disposed of by the Contractor as hazardous wastes in accordance with all applicable laws and regulations. No high VOC materials will be permitted. Hazardous wastes are as defined in EPA regulations 40 CFR 261. The Contractor shall be the official waste generator for any hazardous waste generated through performance of this contract unless specified otherwise in this contract. The Contractor shall not store any hazardous waste in this government property without obtaining prior permission and related instructions from the Contacting Officer. Hazardous wastes shall be moved off post and disposed as they are generated or whenever requested by the Contracting Officer. In no case shall the wastes remain on the government property after completion of this work. It shall be Contractor s responsibility to comply with EPA 40 CFR 260265 and DER Code 25 CH 75 regulations concerning hazardous waste generation, storage, treatment and disposal. 4.2 GOVERNMENT RESPONSIBILITIES The Government shall provide appropriate forms after award for permits as required. The Government shall inspect all work areas prior to acceptance of finished work and release of claims. The Government shall provide sanitary facilities and utilities required for work. The Government shall provide a set of electronic Life Safety Drawings. 4.3 CONDUCT OF CONTRACTOR S EMPLOYEES The contractor is fully responsible for the performance and conduct of his employees at all times. The contractor shall not allow any employees to perform work under this contract while under the influence of alcohol, drugs or any other incapacitating agent. Police and other law enforcement personnel on government property have the right to deny entry to property or remove from property any contractor employee for misconduct, which endangers the health or safety of people or property or for reasons of security. Removal from government property of a contractor employee in accordance with the above shall not relieve the contractor from the requirement to meet all of the terms and conditions of the contract. Smoking is not permitted in any building of the VAMC Wilkes Barre and only allowed in designated smoking areas on the grounds. 4.4 IDENTIFICATION OF CONTRACTOR EMPLOYEES The contractor shall provide each employee an identification (ID) badge on contract start date or on employment start date. The ID badge shall be made of nonmetallic material. The badge shall be easily readable and include employee's name, contractor's name, and color photograph. The ID badge template shall be approved by the contracting officer or his or her designee before contract start date. Display of ID Badges: Contractor personnel shall wear the ID badge at all times when performing work under this contract to include attending Government meetings and conferences. Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement. 4.5 SAFETY AND ACCIDENT PREVENTION In performing work under this contract the contractor shall: Conform to the specific safety requirement established by this contract; Comply with the safety rules of the Government property that concern related activities not directly addressed in this contract; Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and, Take such additional immediate precaution as the contracting officer may reasonably require for safety and accident prevention purposes. The government Safety Office will be responsible for monitoring the contractor in the area of safety and accident prevention. ---END--- APPENDIX A Inventory of Known Non-Conformant Penetrations (Note: Do not consider this list to be a representation of ALL penetrations requiring corrective action.) LOCATION DESCRIPTION Basement (AB-51) Large Opening in Concrete Block Smoke Barrier Wall ER Equipment Alcove Large Opening in 1-Hr Gypsum Smoke Zone Barrier. ER Equipment Alcove Relocate Actuator and damper so penetration can be repaired. Basement Double Doors Outside Elevator Lobby Wall with Cable Trays, ducts, and conduits running through. Basement (AB-51) Bank of Conduits 10x18 x2 Basement (AB-51) Sections of Concrete 18x18 block wall missing (2 hr rating) Basement AG-51A Opening in 2 hr rated concrete block wall 12x12 inches Basement AB-51 Opening in 2 hr rated concrete block wall 20x20 inches Basement AG-24 Duct and bank of conduits. Drywall is pierced in with no mud and tape. 36x36 Basement Double Doors By EB-44 12x12 section of 2 hr rated concrete block wall missing with multiple penetrations. Basement Double Door Foreign Material needs to be removed. Head of Wall needs to be stuffed and sealed. 4 x10ft By AG-64 1 hr rated barrier (Gypsum) Basement CG-82 Section of wall is deteriorating. Large 12x12 opening in 2 hr rated concrete barrier. Basement Double Doors 36x24 large opening in concrete 2 hr rated smoke barrier zone with through penetrations. In corridor CB-81 Recommend block wall rebuild. Basement CB-20A Large 12x48 inch opening above duct with through penetrations. Needs to be sealed. Basement CB-26 Large 12x36 inch opening in concrete 1 hr rated wall with penetration x2 Basement Eligibility 40 x3inch Head of Wall is missing. Gypsum 1 hr Smoke Zone Barrier joints needs to be stuffed and sealed. Office Basement wall outside Head of Wall in concrete 1 hr Smoke Zone Barrier joints needs to be stuffed and sealed. Dimension are 8in x 16ft AG-63 Basement AG-51A 12inx12in section of 2 hr concrete block wall missing. (2 hr smoke barrier zone) 1st Floor A1-61 12ft x 3in head of wall needs stuffed and sealed. (2 hr gypsum joint) 1 CLC Gold Elevator Head of Wall joint needs sealed. Dimensions 35 ft x 0.5 in. in 2 hr concrete barrier. Lobby C1-23 Section of Wall missing, needs to be built to deck and have insulation removed. Dimensions are 2ft high by 16ft wide. C1-5 22ft x 1in Head of Wall is missing. Needs to be sealed. 2 hr rated concrete joint. Double Doors by Large metal pipes create 1ft x 5ft large opening in 1 hr rated smoke zone. Recommend repair to appropriate UL System. C1-60 2nd floor 2nd Floor outside Section of wall missing above drop ceiling. 4ft x 5ft section of wall needs sealed on both sides of corridor. Stair 5 N2-97 22ft x 1ft section of wall missing in gypsum smoke barrier zone. N2-49 Large Opening Joints. 20ft x 1inch head of wall needs sealed at gypsum 1-hr rated barrier. N2-99 4ft x 1ft section of gypsum wall missing above drop ceiling. N2-99 Wall has large hole with multiple penetrations. Dimensions are 2ft x 2ft. N2-98 8ft x 1ft section of gypsum wall missing above drop ceiling. N2-50 35ft x 0.5inch x2 head of wall needs sealed at gypsum 1-hr rated barrier. Both sides. C2-09 Large opening with penetrations in concrete 2 hr barrier. 1 ft x 1 ft large opening with penetration needs to be built to deck. C2-09 3ft x 4ft large opening in wall needs rebuilt to proper UL rating. Outside N2-56 Large Opening in 2 hr concrete barrier exists above large damper. Space above damper needs to be correctly sealed. N2-56 2ft x 2ft gap exists in 2 hr concrete wall created by mixed metal conduits. Repair wall between corridor and electrical closet to maintain 2 hr fire rating. 3rd Floor N3-69 Large wall with penetrations in 2 hr concrete barrier where bank of conduits exists is unprotected. Repair to 2 hr fire rating. N3-69 Opening with mixed penetrations in 2 hr rated concrete barrier wall. C3-17A Side gap in 2 hr concrete block wall needs to be sealed. Needs head of wall 3 inch x 8 ft sealed. Large Opening is apparent on outside of wall. 3-100 1 inch x 20ft. Head of Wall needs to be properly sealed. A3-03 Sections of 2 hr rated walls missing in mechanical room where new addition meets original building. 10 ft x 1 ft on both sides. C3-119 Remove scab patch above ceiling and repair 1 hr rated gypsum wall to UL rating. C3-119 1in x 18ft Head of Wall is missing; needs sealed. CLC 3-142 2 ft x 21ft Head of Wall is missing; needs sealed. 4th Floor CLC 4-162 8ft x 3inch Head of Wall; needs sealed and firestopped with UL rated material to bring to proper rating. CLC 4-157 70 ft x 2 inch Head of Wall is missing; needs sealed with UL rated material. CLC across from (2) 1x3ft holes need repaired to proper UL rating. 4-107 C4-131, C4-132 25 x 0.5 ft section of drywall missing in 2 hr smoke barrier zone. Repair gypsum wall to proper UL rating. Double Doors 0.5in x 4ft concrete wall joint needs sealed with UL approved material to 1 hr fire rating. Outside 4-160 5th Floor C5-48B 5 ft x 2 ft section of wall missing with duct penetration in 2 hr gypsum barrier. C5-49C 20 ft Head of Wall needs sealed in 2 hr gypsum barrier with UL rated material. 6th Floor Outside C6-33 20 ft x 0.5 ft Head of Wall needs sealed in 2 hr gypsum barrier with UL rated material. 7th Floor C7-47B Repair Large Opening around duct to proper UL rating in Concrete 2 hr barrier. C7-30 10 ft x 2 ft large opening in 1 hr rated barrier where block is missing. 8th Floor C8-23A 2 ft x 2 ft section of wall is missing in 2 hr gypsum rated barrier. Double Door Corridor C8-62 1 ft x 2 ft large opening created by multiple penetrants in 2 hr concrete barrier. Recommend wall repair and proper seal. Currently stuffed with mineral wool. 9th Floor C9-06 2 ft x 6 ft section of concrete wall missing in 2 hr rated barrier. Repair wall to proper UL rated system. C9-22 10 ft x 3 ft section of gypsum wall missing in 2 hr rated barrier. Recommend repair to proper UL rated system. 10th Floor Stair 1 6 inch x 5 ft section of wall is missing in 2 hr rated concrete barrier. Needs to be built to deck. C10-70F 34 ft x 0.5 ft Head of Wall (HOW) needs sealed. 12 ft HOW has limited access. C10-28 2ft x 2ft large opening in 2 hr concrete wall created by insulated penetrant. Repair larger section of block wall that is decaying/crumbling, may need a complete rebuilt to proper UL rating. Stair 2 Large opening in 2 hr rated concrete barrier. 2ft x 2ft section of wall is deteriorating. Seal barrier to proper UL rating. 11th Floor C11-31 1ft x 1ft section of concrete wall with multiple penetrations needs to be repaired. RECORDS MANAGEMENT 1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. 2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. 3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. 4. Wilkes-Barre VAMC and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Wilkes-Barre VAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Wilkes-Barre VAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230. 5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Wilkes-Barre VAMC control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). 6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and Wilkes-Barre VAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. 7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with Wilkes-Barre VAMC policy. 8. The Contractor shall not create or maintain any records containing any non-public Wilkes-Barre VAMC information that are not specifically tied to or authorized by the contract. 9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. 10. The Wilkes-Barre VAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which Wilkes-Barre VAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D. - Flowdown of requirements to Subcontractors 1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. 2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)

Same awarding agency

NAICS: 561730
New
Federal
S218--Snow Removal Services Wilmington VAMC
Solicitation # 36C24427Q0O12
Solicitation 36C24427Q0012 is a combined synopsis and request for quote for snow removal and deicing services at the Wilmington VAMC in Delaware. This is a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated period of performance from December 1, 2026, through November 30, 2031. The contract has a minimum guarantee of 5,000 dollars and an estimated maximum value of 500,000 dollars, with funds obligated via individual task orders. The procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561730. The scope of work includes clearing all levels of a multi-level parking garage, stairwells, entrances, and exposed ramps, with a requirement that all areas be cleared by 6:00 AM EST following overnight snowfall. Specific chemical restrictions are in place, prohibiting rock salt in the garage and requiring the use of garage-friendly chemicals such as sodium acetate, potassium acetate, or calcium magnesium acetate. The contractor must provide an on-site supervisor for every operation and ensure personnel wear OSHA-required PPE and high-visibility vests. Performance will be evaluated based on a Quality Assurance Surveillance Plan, and the award will be based on a comparative evaluation of technical capability and past performance, as well as price. Offerors must be registered in the System for Award Management and submit their quotes via email to the designated contract specialist. Submissions must include a technical document not exceeding 20 pages, firm fixed pricing for all line items, and three examples of past performance for similarly scoped work. Invoices are to be submitted electronically in arrears upon job completion and are due within 30 days. Compliance with applicable wage and hour laws and limitations on subcontracting are mandatory for the prime contractor.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 811210
New
Federal
J065--Notice of Intent to Sole Source Maintenance of Alaris Infusion Pumps
Solicitation # 36C24427Q0040
The Department of Veterans Affairs has issued a notice of intent for a single, Firm-Fixed Price contract to provide annual maintenance and support services for the Alaris System software and components at the Butler Healthcare Care Center in Butler, Pennsylvania. The primary objective is to secure a post-warranty, full maintenance agreement for the Guardrails software package and to update the network configuration by adding a new range of IP addresses via the VA Altoona server. The period of performance consists of a one-year base period after receipt of order, with four additional one-year option periods available at the government's discretion. The scope of work includes the installation of the latest software versions for Guardrails Suite MX and Alaris Systems Manager, as well as comprehensive technical support and clinical services. Key deliverables include quarterly infusion analytics reports, technical telephone support, monthly web-based training, and annual on-site visits from both technical service and RN clinical consultants. The contractor must ensure compliance with Federal Information Processing Standards (FIPS) 140-2 for the Alaris Packet Control Unit wireless module and adhere to BD's federal terms and conditions. Financial administration will be handled through monthly invoicing for maintenance and support fees.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Federal
Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
Solicitation # 36C24426R0088
Solicitation 36C24426R0088 is a firm fixed price request for proposal issued by the Department of Veterans Affairs for the Upgrade Substation Building 2 Phase 1 project at the Corporal Michael J. Crescenz Medical Center in Philadelphia, Pennsylvania. This project is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 236220, with an estimated value between 5 million and 10 million dollars. The primary objective is to replace two 29 year old electrical substations with new 480/277V substations, each featuring a 1500 kVA transformer, to increase electrical capacity for current and future facility needs. To ensure continuous medical center operations and minimize service outages, the contractor must install a temporary 480/277V substation with a 1500 kVA transformer, which will remain on site as a spare upon project completion. The period of performance has been extended to 1,000 calendar days from the Notice to Proceed. Proposals are due by November 20, 2026, at 4:00 PM EST and must be submitted in separate administrative/price and technical volumes. Award will be based on a Best Value Tradeoff evaluation focusing on technical approach, past performance in occupied hospitals, key personnel qualifications, safety and risk management, quality control, and procurement strategy. Key requirements include strict adherence to Infection Control Risk Assessment protocols, the provision of 100 percent performance and payment bonds, and compliance with the Davis-Bacon Act and Buy American requirements.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Federal
Z2DA--FY26 NRM 460-20-004 | Tuckpointing FY26 | NCO 4 Construction East (VA-26-00060656)
Solicitation # 36C24426B0018
Solicitation 36C24426B0018 is an Invitation for Bid issued by the Department of Veterans Affairs Network Contracting Office 4 for professional tuckpointing and masonry repair services at the Wilmington VA Medical Center in Delaware. This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. The scope of work involves the repair, replacement, and rework of deteriorated exterior masonry and caulking systems across ten buildings on the campus while the medical center remains fully operational. The estimated magnitude of construction is between 2,000,000 and 5,000,000 dollars, with a required period of performance of 270 calendar days from the Notice to Proceed. The contract will be awarded to the responsive and responsible bidder offering the lowest price. Bidders must provide a bid guarantee and are required to submit unit prices for repointing per linear foot and individual brick replacement. Key compliance requirements include adherence to the Davis-Bacon Act, the Buy American Act, and ADA standards, as well as the submission of a site-specific safety plan and performance and payment bonds. The government will conduct pre-final and final acceptance inspections to verify that all work meets federal, state, and local codes and VA specifications. Payment will be processed electronically through the VA Electronic Invoice Presentment and Payment System.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS