Salton Sea Species Conservation Habitat Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Salton Sea Species Conservation Habitat Project, managed by the California Natural Resources Agency, implements a sequence of habitat and dust control projects around the perimeter of the Salton Sea in Imperial County. This initiative updates the 2013 Final EIS/EIR to incorporate the State's Salton Sea Management Program Updated Phase 1: 10-Year Plan. A primary component of the work is the Pupfish Connectivity Project, which focuses on expanding the East Pond to provide critical breeding, feeding, and resting habitats for birds and the endangered desert pupfish. Key construction deliverables include a 4,500-foot realignment of the West Interception Ditch, a 1,500-foot High Flow Bypass channel, and various maintenance features such as access roads, culvert crossings, and dedicated spoils areas. The project is governed by the California Environmental Quality Act and Lake and Streambed Alteration Agreements, with a focus on ensuring no significant environmental impacts beyond those previously identified. Compliance requirements include the implementation of a Stormwater Pollution Prevention Plan and strict protocols for cultural resource management, including an inadvertent discovery plan and archaeological surveys. Performance is measured through a minimum five-year monitoring period using quantitative methods like vegetation mapping and CRAM analyses, alongside qualitative site inspections. Additionally, the contractor must monitor air quality via PM10 concentrations and saltation activity, and conduct toxicity testing for substances such as selenium in ponded water and bird eggs.

General Info

California agency project for Salton Sea habitat restoration, dust control, and pupfish conservation.

Agency

California Natural Resources Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Highways 86, 111, 78, CA

Set-Aside

NONE

Documents

(3)

Addendum to Salton Sea Species Conservation Habitat Project EIS/EIR SCH 2010061062

PDFaddendum

Notice of Determination for Salton Sea Species Conservation Habitat Project Addendum

PDFnotice-of-determination

EPIMS_IMP_55032_R6_EIR Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Natural Resources Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California Natural Resources Agency
Office AddressN/A
Contacts
Joe SheaAssistant Secretary for Salton Sea Policy

Full Description

Show more
This Addendum updates the Salton Sea Species Conservation Habitat (SCH) Project Final EIS/EIR finalized in August 2013, to include the State's SSMP Updated Phase 1: 10-Year Plan (Updated 10-Year Plan). The 10-Year Plan identifies a sequence of habitat and dust control projects around the perimeter of the Sea consistent with the SCH Project preferred alternative. The addition of these changes would not have any significant environmental impact beyond those already addressed in the SCH Final EIS/EIR or cause a substantial increase in the severity of previously identified impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS