This Government Contract opportunity from California was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Joaquin Reservoir Valve Actuator Replacement (REBID)

Closed
13111State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the replacement and startup testing of valve actuators and associated components at the San Joaquin Reservoir, specifically targeting five valve actuators located at different elevations along the east reservoir embankment. Two actuators situated above the reservoir waterline will be replaced in dry conditions, while the three lower-elevation actuators require underwater replacement. All connected solenoid valves, flow control valves, and ball valves within the valve control cabinet must be replaced in kind to ensure operational continuity and system compatibility. The project demands precise coordination due to the varying environmental conditions and the critical nature of the reservoir’s outlet system. Bidders must submit a 10 percent bid bond and participate in a mandatory pre-bid meeting via Microsoft Teams, with the meeting ID and passcode provided for access. The solicitation number is 13111, titled San Joaquin Reservoir Valve Actuator Replacement (REBID), with a posted date of July 15, 2026, and a response deadline of August 11, 2026, at 9:00 PM Pacific Time. The NAICS code is 237990, identifying it as other heavy and civil engineering construction, and the contracting entity is the Engineering Department of the Irvine Ranch Water District in California. All inquiries and communications should be directed to Andres Bernal, the designated point of contact, via the provided phone number and email address.

General Info

Replace and test valve actuators, solenoid, flow, ball valves at San Joaquin Reservoir; bid deadline June 4, 2026.

Place of Performance

15600 Sand Canyon Ave. Irvine, California 92618, CA, USA

Set-Aside

NONE

Documents

3

San Joaquin Reservoir Valve Actuator Replacement Bid Form Project No. 13111

PDF, High priority: read this firstbid-form
High

San Joaquin Reservoir Valve Actuator Replacement - PR 13111 (REBID) Instructions to Bidders

PDF, High priority: read this firstrfp
High

San Joaquin Reservoir Valve Actuator Replacement Project Manual 13111

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Contract opportunity posted

Notice updated

Response deadline changed from Jun 11, 2026 to Jun 4, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 4, 2026 to Aug 11, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Department of Irvine Ranch Water District
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: The project involves replacement and startup testing of the San Joaquin Reservoir outlet valve actuators located along various elevations of the east reservoir embankment, along with the solenoid valves, flow control valves, and ball valves located within the valve control cabinet structure. The two (2) valve actuators with the higher elevations shall be replaced above the reservoir waterline and the three (3) valve actuators with the lower elevations shall be replaced below the reservoir waterline. All valves associated with the valve control cabinet shall be replaced in kind.
Notes: The link to the mandatory pre-bid meeting is provided above. (MS Teams Meeting ID: 280 527 395 972 18 and Passcode: ap9S4wb2)
Bid Bond: 10.00%

More opportunities from California → Engineering Department of Irvine Ranch Water District

Same awarding agency

NAICS: 237110
SLED
Wells 6, 12, 14, and 15 Site Improvements
Solicitation # 11570
The Engineering Department of the Irvine Ranch Water District is soliciting bids for solicitation number 11570, titled Wells 6, 12, 14, and 15 Site Improvements. The project scope involves the removal and replacement of electrical and ventilation equipment, flow meter and instrumentation replacement, structural modifications, equipment pad installation, and civil improvements. Specific requirements for Well 15 include pump and motor replacement and an optional downhole well rehabilitation. The contract will be awarded to the lowest responsive and responsible bidder, with a total performance period of 1,000 calendar days from the date of the Notice of Award, including a 20-day allowance for weather. Bidders must submit proposals electronically via PlanetBids by November 18, 2026, and provide a 10 percent bid bond. The successful contractor is required to furnish payment and performance bonds for 100 percent of the contract price and adhere to California prevailing wage rates. Technical requirements include strict adherence to IRWD General Technical Specifications, NETA ATS-2017 for electrical testing, and OSHA and NFPA 70E for arc-flash warning signs. All materials must be delivered in unopened manufacturer containers, and specific labeling standards for potable and recycled water must be followed. Final acceptance is contingent upon the repair of all defects and the submission of certified reports for cathodic protection and electrical acceptance testing performed by an independent NETA member firm.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in 22 days
View Details
NAICS: 238220
SLED
Sand Canyon Headquarters and Operations Center HVAC Upgrades (REBID)
Solicitation # 12550 & 12551
The Sand Canyon Headquarters and Operations Center HVAC Upgrades (Project Nos. 12550 and 12551) is a solicitation by the Engineering Department of the Irvine Ranch Water District for comprehensive HVAC system replacements at two California locations. The scope of work includes the removal and replacement of chillers, boilers, piping, associated pumps, and ice bank systems, as well as the retrofit of Variable Air Volume boxes and a full upgrade of the HVAC controls system using CAT6e wiring. Key deliverables include fully operational systems and the completion of start-up and commissioning activities, with specific requirements for independent contractor testing of new boilers and electrical power distribution systems. Bids must be submitted electronically via PlanetBids by October 28, 2026, and require a 10% bid bond. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory requirements for bidders include California CARB In-Use Off-Road Diesel-Fueled Fleet certification, safety program certification, and compliance with California Labor Code prevailing wage rates. The successful contractor must provide performance and payment bonds for 100% of the contract price. Performance is subject to strict limited duration work windows for the T8 Substation and specific seasonal requirements for boiler installation at the Sand Canyon Headquarters between July and October.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

28 days ago

DEADLINE

in about 12 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS