SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

Closed
6982AF26B000008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves the rehabilitation of the Madison Wetland Management District Headquarters access road and parking lot in South Dakota. The scope includes pavement reconstruction with a 3.5-inch asphalt concrete overlay on top of 4 inches of aggregate base. The work aims to improve safety and access for staff and visitors, particularly enhancing entry to the Payne Waterfowl Production Area. The existing single-lane, two-way road will be maintained with a consistent 14-foot width, while the adjacent parking lot will be fully reconstructed, providing a total of 18 parking stalls including one accessible stall, and ensuring a uniform cross slope for proper drainage. The pavement design also integrates with the surrounding sidewalks and concrete trail to the visitor center. Key work items include excavation, sub-excavation, placement of aggregate base, and asphalt concrete paving. The estimated quantities are 550 cubic yards of roadway excavation, 200 cubic yards of subexcavation, 600 tons of aggregate base, and 500 tons of asphalt concrete pavement. This project, managed by the Department of Transportation's Central Federal Lands Division, is expected to be advertised in May 2026 with award and notice to proceed scheduled for July 2026, and completion targeted for October 2026. The estimated project cost ranges between $501,000 and $1,000,000.

General Info

Rehabilitate Madison Wetland access road and parking, asphalt overlay, improve safety, complete October 2026.

Agency

Department Of Transportation → 6982AF Central Federal Lands Divisi

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

SD, 57042, USA

Set-Aside

NONE

Documents

(7)

SD FW MADI 10(2) & 9000(1) Road Rehabilitation Plans

PDFplans

Design+Files.zip

ZIP

Solicitation 6982AF26B000008 Rehab Madison WMD HQ Road IFB

PDFifb

Amendment A002 to Solicitation 6982AF26B000008

PDFamendment

Pavement Design Report SD FTFW MADI 10(2) & 9000(1) Rehab Madison Lake County SD

PDFpavement-design-report

FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

PDFspecifications

Amendment A001 to Solicitation 6982AF26B000008

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Amendment 2

Contract was updated

Posted

Solicitation

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Douglas Whitcomb

Full Description

Show more

PROJECT NUMBER: SD FTFW MADI 10(2) & 9000(1)


PROJECT NAME: REHAB MADISON WMD HQ ROAD


PROJECT DESCRIPTION


The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.


SCOPE OF THE WORK: 


The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74.


The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.