This Solicitation opportunity from Florida was posted on October 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Shore at Crystal Beach Park Expansion
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Shore at Crystal Beach Park Expansion project, solicitation ITB PW 13-26, is a construction contract issued by the Okaloosa Board of County Commissioners for work in Destin, Florida. The scope of work includes the construction of parking lots, a restroom facility, public showers, boardwalks with ADA ramps, a geogrid beach access drive, and an underground stormwater system. The project is governed by technical specifications and plans prepared by Donovan-Hill Group, Inc., and must comply with Florida Department of Environmental Protection permits and City of Destin development orders. An additive alternate is also included for the removal of a boardwalk and the addition of a sidewalk at Tarpon Beach. The contract will be awarded to the lowest responsive and responsible bidder on a unit price basis. Bidders must be registered in the System for Award Management database and provide a labor coercion attestation. Key submission requirements include electronic delivery via the OpenGov portal by October 29, 2026, with original bid bonds delivered to the Okaloosa County Purchasing Department within four business days of the bid date. The successful contractor is responsible for obtaining necessary building permits from the City of Destin and must adhere to FDOT and EJCDC standards. Payment is processed through applications for payment reviewed by the project engineer, and final acceptance is contingent upon a completed punch-list and a Certificate of Final Acceptance.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
24AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Request for Quote for The Recharge Master Plan Update at Montclair BasinOpen now, due in 7 days
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 16 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (82)
See All 82 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: ADDENDUM – INCORPORATION OF UPLOADED PLANS The plans uploaded and issued as part of this Addendum are hereby incorporated into and made a material part of the Invitation to Bid ("ITB") and the Contract Documents. All Bidders shall use the plans accompanying this Addendum as the basis for preparation of their bids. The plans issued with this Addendum supersede and replace any previously issued plans, drawings, or plan sheets to the extent of any conflict, inconsistency, or discrepancy. Bidders shall be responsible for reviewing and incorporating all revisions, details, dimensions, specifications, and other information contained in the plans issued with this Addendum into their bids. Except as expressly modified by this Addendum, all other terms, conditions, requirements, and provisions of the ITB and previously issued Addenda remain unchanged and in full force and effect. Attachments: 12105.02_Crystal_Beach_Amendment_-_RFB_Civil_Plans_-_17_Sept_2026.pdf
Addendum #2: ADDENDUM NO. 2 PLEASE TAKE NOTICE that all prospective Bidders are hereby notified that NO PRE-BID MEETING will be held in connection with Invitation to Bid (ITB) PW 13-26. Except as expressly modified by this Addendum, all other terms, conditions, specifications, requirements, and provisions of ITB PW 13-26 shall remain unchanged and in full force and effect .
Addendum #3: ADDENDUM NO. 3 TO: ALL BIDDERS PROJECT: ITB 13-26 SHORE AT CRYSTAL BEACH PARK EXPANSION BID TIME AND DATE: 3:00 PM LOCAL TIME, OCTOBER 28, 2026 (NO CHANGE) October 20, 2026 The following items are hereby incorporated into the project manual, procurement documents, contract documents, plans and specifications: ITEM NO. 1 – [Update] Bid Form with Attachments Pay Item List pg.00410-3 to 00410-8 (included in this addendum). • Line Item #8 for Site Lighting was removed as the site lighting is included in Line Item #7 Electrical. ITEM NO. 2 – Specifications for Fiberglass Reinforced Plastic Grating and Bollard Installation Details (included in this addendum) ITEM NO. 3- CADD Files • Fifteen (15) CADD Files titled Crystal Beach Redesign-Master, 12105.02 storm chamber, cover, Misc. water, demolition, erosion control plan, geometry, grading and drainage, grading overview, pavement sections, profiles, project overview, section views, survey control & ex conditions, utility plan. Attachments: CADD Files titled Crystal Beach Redesign-Master, 12105.02 storm chamber, cover, Misc. water, demolition, erosion control plan, geometry, grading and drainage, grading overview, pavement sections, profiles, project overview, section views, survey control & ex conditions, utility plan. /s/ Amber Hammonds Okaloosa County Purchasing Contracts and Lease Coordinator RECEIPT OF THIS ADDENDUM SHALL BE ACKNOWLEDGED BY WRITING THIS ADDENDUM NUMBER AND DATE IN THE SPACE PROVIDED ON DOCUMENT ENTITLED, 'ADDENDUM ACKNOWLEDGEMENT - ATTACHMENT A' in SECTION 00410. Attachments: Addendum_#3.pdf, 12105.02-Survey_Control_&_Ex_Conditions.dwg, 12105.02-Cover.dwg, 12105.02-Erosion_Control_Plan.dwg, 12105.02-Demolition.dwg, 12105.02-Grading_Overview.dwg, 12105.02-Pavement_Sections.dwg, 12105.02-Utility_Plan.dwg, Crystal_Beach_Redesign-Master_Xref_recover.dwg, 12105.02_Storm_Chamber_Detail_West.dwg, 12105.02-CU-501_-_CU-507_-_Misc_Water_and_Sewer_Details.dwg, 12105.02-Geometry.dwg, 12105.02-Grading_and_Drainage.dwg, 12105.02-Profiles.dwg
Addendum #4: ADDENDUM NO. 4 TO PRICE PROPOSAL Revised Submission Deadline: October 29, 2026 at 3:00 PM (CST) The revised price proposal has been updated in OpenGov and is attached hereto as part of Addendum No. 4 for review and consideration. The attached proposal supersedes and replaces the previously submitted pricing. All other terms, conditions, and requirements of the original solicitation and proposal shall remain unchanged unless expressly modified herein. Please use the See What Changed link to view all the changes made by this addendum. Attachments: Price_Proposal.pdf
More opportunities from Florida → Public Works
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
