Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Grading, Stabilization, and Re-Vegetation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
The Lake Charles Harbor and Terminal District is soliciting bids for Project CP25014, which involves heavy construction port improvements for the Industrial Park East Rail Extension and Trans-loading Yard in Calcasieu Parish, Louisiana. The scope of work includes the design and construction of rail infrastructure, specifically proposed tracks TRK A and TRK B, and the installation of precast concrete crossing panels to replace wood ties. Additional requirements include clearing and grubbing, excavation, culvert bedding, and the installation of barbed wire fencing and double swinging driveway gates. The engineer's estimate for the base bid is $5,856,000, and awards will be based on the lowest price derived from the summation of quantities and unit bid prices. Bids are due by November 19, 2026, and must be submitted using the Louisiana Uniform Public Work Bid forms. The successful contractor will be required to provide performance and payment bonds from an A-rated surety and adhere to strict quality assurance standards, including DOTD specifications for embankment density and moisture content. The contract is based on calendar days, with stipulated damages of $1,000 per day for failure to meet the completion deadline and an additional $1,000 per day for uncompleted punch list items after 45 days. Financial terms include a retainage of 5% for contracts exceeding $500,000. Compliance with the Clean Air Act and Federal Water Pollution Control Act is required for subcontracts exceeding $150,000 financed via FEMA.
Port of Lake Charles

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
2026008-RFP3819 Riverwood Park
Solicitation # 2026008-RFP3819
The Columbia County Board of Commissioners is soliciting proposals for the construction of Riverwood Park under solicitation number 2026008-RFP3819. The General Contractor is responsible for providing all labor, equipment, materials, and supervision to complete the project according to drawings and specifications provided by the architect, Goodwyn Mills Cawood. The comprehensive scope of work includes site demolition, clearing, and grading, as well as the installation of play structure assemblies, poured-in-place safety surfacing, splash pad equipment and plumbing, mountain biking trails, concrete paths, parking lots, site lighting, site furnishings, and landscaping improvements. To be eligible for award, bidders must possess a State of Georgia General Contractor's License and a Columbia County business license. Proposals must be submitted electronically via the Bonfire portal by December 10, 2026, and must include a bid bond drawn in favor of Columbia County, Georgia, for at least five percent of the lump sum bid. Letters of credit are not accepted. The successful contractor will be required to provide Performance and Payment Bonds within ten days of the contract award. All inquiries and proposals are managed through the Columbia County Procurement Department, with Glenn O'Steen serving as the Procurement Manager.
Columbia County Board of Commissioners

POSTED

about 11 hours ago

DEADLINE

in 26 days
NAICS: 237990
New
SLED
MacKenzie Park Workout Stations Phase 2E
Solicitation # 262761
The Borough of West Conshohocken is soliciting sealed bids for the MacKenzie Park Workout Stations Phase 2E project, which involves the installation of workout equipment at six locations along the existing walking trail in MacKenzie Park. The scope of work includes providing all necessary labor, materials, tools, and equipment, as well as the installation of ADA handicap ramps and a project sign at the park entrance. The project must be completed within 90 consecutive calendar days from the commencement date, with liquidated damages of $500 per calendar day for delays. All work must comply with PA Prevailing Wage requirements, OSHA safety standards, and specific engineering specifications, including a minimum 28-day concrete compressive strength of 3,750 psi. Bids will be awarded to the lowest responsible bidder and must be submitted via the PennBid portal by 11:00 A.M. on December 4, 2026. Proposals must include a bid bond of at least 10 percent and a qualifications statement detailing similar work performed within the last five years. Successful bidders are required to provide Performance and Labor and Material Bonds for 100 percent of the contract amount, a Maintenance Bond for 25 percent, and a Certificate of Insurance. Additionally, contractors must sign a Nondiscrimination and Sexual Harassment Clause and provide a detailed project schedule for approval prior to the start of construction.
Montgomery County

POSTED

about 13 hours ago

DEADLINE

in 20 days
NAICS: 237990
New
SLED
Unity Park Field Renovation
Solicitation # 6580
The Town of Trumbull is seeking competitive proposals from qualified firms to provide General Contracting services for the Unity Park Field Renovation project. The scope of work includes the removal of existing fencing, gates, backstops, clay infields, and turf, as well as the installation of a synthetic turf system and athletic equipment, including a 20-foot foul pole, in-ground bases, and a home plate forming system. The project is expected to begin around December 2026 and must be completed within 100 consecutive calendar days after the Notice to Proceed. The contract will be awarded to the lowest responsible qualified bidder based on the total proposal price, though the Town may consider other bidders if they offer an earlier completion date or expedited delivery. Key contractual requirements include a bid security of 10 percent of the base proposal and the provision of performance and payment bonds each totaling 100 percent of the contract price. Contractors must adhere to State of Connecticut prevailing wage guidelines, unless the low bid is under 100,000 dollars, and must comply with OSHA standards and non-discrimination policies. Liquidated damages of 1,100 dollars per day will be applied for delays beyond the completion date. Proposals must be submitted in a sealed envelope to the Purchasing Agent by December 4, 2026, and must include a work schedule, a statement of qualifications, and a non-collusion form. All materials must meet specific ASTM standards for steel and PVC coatings to ensure durability and salt-spray resistance.
DAS Procurement

POSTED

about 14 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This subcontract opportunity, titled Site Grading, Stabilization, and Re-Vegetation, is issued by Napa County in California. The project focuses on essential earthwork services, specifically requiring grading, erosion control, soil stabilization, and re-vegetation efforts centered around equipment pads and lagoons. The solicitation was posted on July 7, 2025, with a response deadline set for August 14, 2025. Classified under NAICS code 237990, the contract seeks qualified providers to ensure structural stability and environmental compliance for the designated site areas.

General Info

Documents

This scope was carved out of LB 25-01.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LBRID Transfer Pumping Equipment and Storage Project, LB 25-01

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Napa County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform earthwork including grading, erosion control, soil stabilization, and re-vegetation around lagoons and equipment pads.

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS