This Solicitation opportunity from Utah was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
SLCo FCE133675 Rose Creek Gabion Baskets Const Materials - RFC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Salt Lake County Public Works Flood Control is soliciting bids for the supply of construction materials to install 619 linear feet of bank stabilization along Rose Creek to protect a maintenance road from scour. The required materials include an estimated 430 cubic yards of Class III riprap, 906 cubic yards of 4-8 inch rockfill, and either 453 baskets (3x3x6) or 905 baskets (3x3x3) of galvanized steel gabion wire. This is a supply-only contract; installation will be performed by County crews. Bidders may bid on any individual portion of the materials, and the County reserves the right to make multiple awards to separate bidders based on the lowest responsive and responsible cost. Materials must meet the 2025 APWA Utah Chapter Manual of Standard Specifications and relevant ASTM standards. Gabion baskets are shipped FOB Destination to the Flood Control Operations Yard in Midvale, Utah, and must be delivered within four weeks of the contract award. Aggregate materials must be available for County pick-up within 24 hours of an order, with the loading site located within a 40-mile radius of the project site in Riverton, Utah. The County anticipates construction taking place between September and November 2026, and pricing must be guaranteed for one year from the award or through October 31, 2027. Compliance with federal and state regulations, including the Davis-Bacon Act, environmental laws, and OSHA standards, is mandatory.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The materials provided under this contract are intended for use by County operations crew to install 619 LF of bank stabilization measures for the purpose of preserving an existing maintenance road. The County anticipates executing construction of this work between September 2026 and November 2026. This procurement is for the supply of materials only; installation is not included.
Bidders can bid on any individual portion of materials and do not have to furnish a complete bid across all line items to be considered; individual bid items may be awarded via separate purchase orders or contracts at the County’s discretion. Payment for riprap and rock fill will be based on actual quantities required, which may be subject to change from the estimated quantities provided.
All material specifications are derived from the 2025 APWA Utah Chapter Manual of Standard Specifications and follow APWA numbering codes, modified strictly for supply and delivery rules (excluding installation clauses). See mandatory requirements for submittals.
Gabion wire baskets must be delivered to the operations yard (see location and requirements below). Aggregate materials (riprap and rockfill) should be available for pick-up by our Salt Lake County operations crew during normal business hours (see the FCE133675 31 36 00 Gabions and FCE133675 31 37 00 Riprap or Rock Lining documents found in the Supporting Documentation area of the bid portal).
Individually bid items may be awarded to separate bidders as the required materials may not be available from a single bidder.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
