Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Soil Nail and Slope Stabilization (Value Engineering)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Soil Nail and Slope Stabilization is issued by the Department of Transportation's Central Federal Lands Division for projects located in Medora. The contractor will provide advanced slope stabilization services for prime contractors on National Park landslide projects, utilizing specialized drill rigs and grouting pumps to install soil nails and apply facing. The primary objective is to deliver a stabilized slope while ensuring minimal environmental disturbance to the surrounding area. The project falls under NAICS code 238910 and requires the contractor to hold specialized geotechnical certification to perform the necessary drilling and grouting operations. Interested parties must respond by September 30, 2026, following the posting date of September 21, 2026.

General Info

DOT subcontract for soil nail and slope stabilization in Medora, due September 30, 2026.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Medora, ND, USA

Set-Aside

NONE

Documents

This scope was carved out of 6982AF25B000004.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ND NP THRO 204(1) Buck Hill Road

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs advanced slope stabilization for prime contractors on National Park landslide projects using soil nails to minimize environmental disturbance. Drills and installs soil nails, performs grouting, and applies facing for stabilization using specialized drill rigs and grouting pumps. Requires specialized geotechnical certification. Delivers a stabilized slope with minimal disturbance.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
ND NP THRO 204(1) Buck Hill Road
Solicitation # 6982AF25B000004
The ND NP THRO 204(1) Buck Hill Road project, solicitation number 6982AF25B000004, is a HUBZone set-aside construction effort located in Theodore Roosevelt National Park near Medora, North Dakota. Managed by the Department of Transportation's Central Federal Lands Division, the project is estimated to cost between 5 million and 10 million dollars. The scope of work focuses on three primary components: the rehabilitation of approximately three quarters of a mile of roadway, the reconstruction of the Buck Hill Overlook parking lot to accommodate larger vehicles and include accessible parking, and a significant landslide stabilization effort involving deep subexcavation of unsuitable material to a depth of 10 feet over a 1,000 linear foot stretch. Key technical requirements include the placement of 2,000 tons of hot asphalt concrete pavement, 5,000 tons of roadway aggregate, and the installation of 5,100 linear feet of concrete curb and gutter. The project also involves installing 1,600 linear feet of guardrail and 550 linear feet of HDPE pipe culverts. Construction is anticipated to take place from April 2027 through November 2027, with the award expected in January 2027. Notable restrictions include the requirement for a Paleontological Monitor during all ground disturbing activities, though the contractor is permitted to close Buck Hill Road for the duration of the work. Bidders must bid the plans as provided, although value engineered solutions may be submitted for evaluation following the contract award.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
Federal
CO NP BLCA 10(1) South Rim Drive
Solicitation # 6982AF26Q000022
The South Rim Drive Improvement project, solicitation 6982AF26Q000022, is a firm fixed price contract issued by the FHWA Central Federal Lands Highway Division to restore roadside protection in Montrose County, Colorado. This small business set-aside project focuses on removing roadside hazards and installing modern, crash-tested steel guardrail systems with specialized weathered-look finishes across twelve locations. The scope of work includes selective boulder removal and dispersal, site grading, base preparation, and the implementation of comprehensive traffic control and sequencing to maintain safety for visitors and staff. The project adheres to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and requires compliance with the National Pollutant Discharge Elimination System and a Stormwater Pollution Prevention Plan. The estimated cost for the project ranges between 700,000 and 2,000,000 dollars. The anticipated schedule involves an award in mid-October 2026, with a notice to proceed issued immediately to accommodate an eight-week lead time for specialized material procurement. On-site construction is scheduled to begin as early as May 3, 2027, with a final completion deadline of June 15, 2027. Award decisions will be based on a comparative evaluation of price, technical approach, and relevant experience. Key contractual requirements include the submission of a hardcopy original bid bond, performance and payment bonds, and adherence to the Davis-Bacon Act. Invoicing will be processed through the DELPHI electronic system.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS