Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on March 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amendment 1-Solicitation - CUP - Two-Phase Design-Build Acquisition for Modernization and Expansion of Central Utility Plant

Closed
1333ND26RNB190004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

24 minutes ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

24 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

24 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

24 minutes ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes site preparation, structural modifications such as saw cutting reinforced concrete walls, and the installation of an ADA-accessible route featuring ramps, landings, and handrails. The contractor is responsible for all permitting, structural engineering, weatherproofing, and ensuring that interior and exterior finishes match the existing clubhouse architecture. Project acceptance is contingent upon successful inspections by the Authority Having Jurisdiction and final approval by Colville Fuels. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Required insurance includes Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation. Bids are due by November 20, 2026, with a targeted contract award date of December 4, 2026, and a weather-dependent completion goal of March 31.
Confederated Tribes of the Colville Reservation

POSTED

about 1 hour ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract is a solicitation issued by the Department of Commerce, specifically the National Institute of Standards and Technology (NIST), for a Two-Phase Design-Build Indefinite Delivery, Indefinite Quantity Single Award Task Order Contract (SATOC). The solicitation focuses on the modernization and expansion of the Central Utility Plant located in Gaithersburg, Maryland, under NAICS code 236220, which pertains to commercial and institutional building construction. The solicitation number is 1333ND26RNB190004, with the initial posting date of March 2, 2026, and a response deadline of March 16, 2026, at 5:00 PM. This Phase I solicitation represents the first step in a multi-phase procurement process, and interested parties are advised to closely monitor SAM.gov for any amendments or updates, which will be clearly identified and marked. Key aspects include that there is no Project Labor Agreement (PLA) requirement associated with this solicitation. The contract involves submission and review of detailed technical attachments (A through I) specific to the statement of work, which outline the necessary technical requirements and guidelines for the project. Communications and inquiries related to the solicitation can be directed primarily to Brandon Butler or secondarily to Teresa Harris, both affiliated with NIST. The solicitation is aimed at industry partners capable of delivering design-build services for large-scale utility infrastructure projects within the government sector.

General Info

NIST seeks design-build contractor for Central Utility Plant modernization, no PLA, response by March 16, 2026.

Contract Value

$280,000

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Gaithersburg, MD, USA

Set-Aside

NONE

Award Issued Date

Documents

13

Amendment 1 to Solicitation 1333ND26RNB190004

PDF, High priority: read this first2 pages · amendment
High

Attachment I NIST Building 302 Existing Compressed Air System

PDF, High priority: read this first1 page · sow
High

CFMO PR 2023.01 Certificate of Occupancy Template

PDF, High priority: read this first9 pages · procedure
High

Guidelines for OFPM Contractors and A/E Firms at NIST

PDF, High priority: read this first25 pages · guidelines
High

NIST Central Utility Plant Facility Program of Requirements June 2024

PDF, High priority: read this first352 pages · program-of-requirements
High

NIST CUP Modernization Design-Build Summary Section 011000

PDF, High priority: read this first24 pages · sow
High

NIST Design After Award Section 010120

PDF, High priority: read this first46 pages · sow
High

NIST Schematic Design for Site Underground Utilities Replacement June 2021

PDF, High priority: read this first315 pages · sow
High

Q&A Document for Solicitation 1333ND26RNB190001 CUP Modernization Phase I

PDF, High priority: read this first7 pages · q-and-a
High

RFI Q and A for Solicitation 1333ND26RNB190004 CUP Phase I

PDF, High priority: read this first4 pages · q-and-a
High

Solicitation 1333ND26RNB190004 for CUP Modernization SATOC

PDF, High priority: read this first208 pages · ifb
High

NIST PR 2401.01 Facility Access and Electronic Access Control Directive

PDF, Low priority19 pages · directive
Low

Att+C_CUP+POR+App.pdf

PDF633 pages

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA

Full Description

Show more

Amendment 1-Solicitation - CUP - Two-Phase Design-Build Acquisition for Modernization and Expansion of Central Utility Plant


The purpose of this amendment 1 is to:
1. Provide answers to questions asked in response to this solicitation, 1333ND26RNB190004.
2. Provide previous questions and answers for the first CUP Phase I solicitation, 1333ND26RNB190001. 


Please see attached


  1. 1333ND26RNB190004 Amendment 1     
  2. Current Solicitation RFI_Q and A _1333ND26RNB190004_ CUP Phase I
  3. Previous Solicitation RFI_Q and A_1333ND26RNB190001_ CUP Phase I

 *Please review the note on page one (1) of the previous solicitation Q&A sheet.


All other terms and conditions remain unchanged. 


***************************************************************************************



Please see the following attachments for details.
1. 1333ND26RNB190004 CUP Modernization Solicitation  (includes attachments for solicitation)
2. Statement of Work Technical Attachments A-I


NOTICE: This document is a formal solicitation provided for Phase I of this Two-Phase Design-Build Indefinite Delivery, Indefinite Quantity Single Award Task Order Contract (SATOC).
Any additional amendments or updates to the Phase I solicitation will be posted exclusively on SAM.gov. All changes will be clearly identified, with modified sections highlighted or otherwise marked to distinguish them from previous versions.
Industry is strongly encouraged to monitor SAM.gov regularly for any subsequent amendments.


Note: 


This solicitation does not contain a Project Labor Agreement (PLA) requirement.


Please review all attachments and due dates. 


More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS