Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sonoma-Marin Area Rail Transit Todd Road Operations and Maintenance Facility

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sonoma-Marin Area Rail Transit District (SMART) is executing the Non-Motorized Pathway Project Segment 8 in Novato, California, under Lake and Streambed Alteration Agreement EPIMS-MAN-47289-R3. This project involves the construction of a 0.42-mile paved pathway along the SMART railroad, featuring a 10-foot wide asphalt path with rock aggregate shoulders and Portland cement near Hanna Ranch Road. Key infrastructure includes the installation of a 185-foot by 15-foot prefabricated steel truss bridge to span Hanna Pond, the extension of an existing culvert for stormwater conveyance, and the permanent fill of a portion of existing wetlands. Environmental impacts include the removal of one white oak and one blue gum Eucalyptus tree, as well as the trimming of one black oak. The project will result in 0.021 acres of temporary impacts and 0.069 acres of permanent impacts to wetland, on-stream pond, and riparian habitats, with 0.056 acres specifically affecting freshwater marsh and on-stream ponds. The California Department of Fish and Wildlife has determined that the project will not have a significant environmental effect, provided that established mitigation measures and monitoring plans are followed. This effort is part of broader regional transit improvements, which include the Healdsburg Extension Project involving approximately 9 miles of rail extension, trackwork, and bridge replacements.

General Info

SMART District extending passenger rail 9 miles in Sonoma County over three years.

Agency

California → Sonoma Marin Area Rail Transit Commission

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Novato, CA

Set-Aside

NONE

Documents

(4)

Notice of Determination for SMART Non-Motorized Pathway Project Segment 8

PDFnotice-of-determination

Notice of Determination for Healdsburg Extension Project Modifications EIR Addendum

PDFnotice-of-determination

SMART Healdsburg Extension Project EIR Addendum December 2025

PDFenvironmental-impact-report-addendum

NOD SMART Healdsburg Extension Project Modifications EIR Addendum

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma Marin Area Rail Transit Commission
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sonoma Marin Area Rail Transit Commission
Office AddressN/A
Contacts
Jordan BeatonEnvironmental Scientist
Bill GamlenLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS- MAN-47289-R3, pursuant to Fish and Game Code section 1602 to SMART. The Project is limited to constructing a clear span bridge, permanent fill to an existing wetland, and extension of an existing culvert to continue drainage, all of which are Project aspects resulting in 0.06 miles of a 0.42-mile paved non-motorized pathway along the SMART railroad. Construction of the pathway will involve a 10-foot wide asphalt pathway with 2-foot wide shoulders consisting of rock aggregate. Where the pathway approaches Hanna Ranch Road, Portland cement will be used as pathway material. A single prefabricated steel 185 feet long by 15 feet wide truss bridge will be installed to clear span over Hanna Pond. One white oak (Quercus garryana) tree with an 18-inch diameter at breast height (DBH) will be removed from below the bridge and one multi-trunk blue gum Eucalyptus (Eucalyptus globulus) will be removed. Additionally, one black oak (Quercus kellogii) with a 10-inch DBH will be trimmed greater than fifteen (15) percent. The Project will permanently fill a portion of existing wetland to support the pathway and extend the existing culvert to continue stormwater conveyance. The Project will result in 0.021 acres (100 linear feet) of temporary impacts associated with access and vegetation trimming for bridge construction. The Project will result in 0.037 acres (180 linear feet) of permanent impacts associated with bridge construction and overwater shading, and 0.032 acres (90 linear feet) of permanent impacts associated with fill and culvert related activities, totaling 0.069 acres (270 linear feet) of permanent impacts to wetland, on-stream pond, and riparian habitat, of which 0.056 acres are freshwater marsh wetland and on-stream pond impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
This solicitation is for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii, issued by the U.S. Army Corps of Engineers Honolulu District as a sealed bid, firm-fixed-price procurement. The work is being pursued with small business subcontracting and supply participation in mind, and the solicitation is set aside for HUBZone small business concerns under SBA authority. The project is valued in an estimated range of $1,000,000 to $5,000,000, with bids due by September 30, 2026, and performance expected to begin upon notice to proceed. The contract calls for a 200-calendar-day delivery/performance period, uses three CLINs covering mobilization/demobilization, dredging and ocean disposal of 4,260 cubic yards, and revetted mole repair, and requires bidders to submit on all line items. The place of performance is the harbor site in Hawaii, with dredged material to be disposed of at an approved offshore site south of Oahu. Submission is in hard copy only; electronic bid submission is not permitted, and sealed envelopes must be properly marked. Bidder questions are to be submitted through ProjNet by the stated deadline, with a designated bidder inquiry key provided. A bid guarantee is required, and the contractor must also furnish performance and payment bonds. The project scope combines maintenance dredging with repair of the revetted mole, including clearing and grubbing, vegetation and root removal, stone rework, filling voids with additional stone, environmental controls, water quality protections, and disposal of dredged material. The drawings and specifications reference detailed site plans, cross sections, survey data from 2024, contractor notification and preservation obligations, and specific dredging methods. Technical requirements include pre- and post-dredge surveys by a qualified third-party surveyor using multi-beam hydrographic methods, acceptance based on median depth sorting on a 3-foot by 3-foot grid, and strict inspection criteria for stone quality and construction compliance. The contractor must submit an operations plan and schedule within 30 days of notice to proceed, maintain a quality control program with preparatory, initial, and follow-up phases, and provide key personnel including a project manager, project superintendent, QC manager, and site safety and health officer with supporting resumes and letters of direction. The solicitation incorporates Davis-Bacon wage requirements, public safety and traffic controls, cybersecurity during construction, CUI/NDA obligations for certain data, and specific compliance clauses covering liquid
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
Retamal Dam Buoy System
Solicitation # 191BWC26R0006
The International Boundary and Water Commission (IBWC) is soliciting a firm-fixed-price design-build contract for the Retamal Dam Buoy System in Hidalgo County, Texas. The project aims to establish a new waterway barrier line featuring anchors, an alert system, and warning signs to prevent public access to dangerous hydraulics and reduce structural impacts from debris. The scope is divided into two phases: the preparation of design documents and the subsequent construction and commissioning of the system. The estimated project magnitude is between 5 million and 10 million dollars, with a total performance period of 485 calendar days from the notice to proceed. The procurement follows a two-phase design-build selection procedure under FAR Subpart 36.3, where award is based on a rational tradeoff between cost and non-price evaluation factors, including technical plans, past performance, and financial condition. Bidders must meet strict qualification requirements, including the submission of IBWC Form 245 and evidence of professional licensure for design engineers. Site access is restricted to specific working hours, and contractors must coordinate with Border Patrol and avoid US Fish and Wildlife property. Proposals must be submitted exclusively via a secure SharePoint portal by the extended deadline of September 16, 2026.
Internat Boundary And Water Commission

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Forest wide Decommissioning, Gunnison National Forest Colorado
Solicitation # 1240LT26Q0177
Solicitation 1240LT26Q0177 is a sealed bid for the removal of unusable structures and the decommissioning of water wells within the Grand Mesa, Uncompahgre, and Gunnison National Forests in Colorado. The scope of work is concentrated at three specific sites: the removal of a toilet building and sewer tank at Ward Lake Campground in Delta County, the abandonment of a water well at Lakeview Campground in Gunnison County, and the abandonment of a water well and removal of a concrete water tank at Beaver Lake Campground in Gunnison County. All work must comply with the Code of Colorado Regulations for water well construction and abandonment. The project is a 100 percent total small business set-aside under NAICS 237990, with a performance period scheduled from October 15, 2026, through June 15, 2027. The contract is awarded based on best value, evaluating price and a technical approach that must include a construction schedule such as a Gantt chart. Awardees are required to provide payment protections, such as payment bonds or an irrevocable letter of credit, covering 100 percent of the contract price for the duration of the performance period plus one year. Labor is subject to the Davis-Bacon Act and specific wage determinations for Colorado heavy construction. Quotes must be submitted via email to Jordan Carlsen by September 22, 2026, at 14:00 EST, and must include a technical narrative of one to three pages and pricing submitted on the provided Excel schedule of items.
Csa Intermountain 8 Usda-Fs

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS