Sonoma-Marin Area Rail Transit Todd Road Operations and Maintenance Facility
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Sonoma-Marin Area Rail Transit District is executing the SMART Non-Motorized Pathway Project Segment 8 in Novato, California, under Lake and Streambed Alteration Agreement EPIMS-MAN-47289-R3. This project involves the construction of a 0.42-mile paved non-motorized pathway along the SMART railroad, featuring a 10-foot wide asphalt path with 2-foot rock aggregate shoulders and portland cement near Hanna Ranch Road. Key infrastructure includes the installation of a 185-foot by 15-foot prefabricated steel truss bridge to clear span over Hanna Pond and the extension of an existing culvert to maintain stormwater conveyance. The project requires the removal of one white oak and one blue gum eucalyptus tree, as well as the trimming of one black oak. Environmental impacts include 0.021 acres of temporary impacts for access and vegetation trimming, and 0.069 acres of permanent impacts to wetland, on-stream pond, and riparian habitats, with 0.056 acres specifically affecting freshwater marsh and on-stream ponds. The California Department of Fish and Wildlife approved the project on July 13, 2026, determining that it will not have a significant environmental effect, provided that specified mitigation measures and monitoring plans are implemented. This effort is part of broader regional transit improvements, which include the Healdsburg Extension Project involving approximately 9 miles of rail extension and associated multimodal infrastructure.
General Info
Place of Performance
Boxheart Dr, Grove St, Dry Creek St, Grant St, Mill St, Healdsburg Ave, Front St, Bailhache Ave,, CA, 95492Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
