Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought Announcement - Construction of Power Independence Mission Control Station, Buckley Space Force Base, Colorado - Generators

Closed
W9128F25SM027Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 10 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 11 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 16 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Aurora, CO, 80011, USA

Set-Aside

NONE

Documents

5

Cummins Generator Set Data Sheet - DQLE + CA542

PDF, High priority: read this firstspecifications
High

Section 26 24 13 Switchboards Specification

PDF, High priority: read this first30 pages · specifications
High

Section 26 32 15 Engine-Generator Set Stationary 15-2500 KW

PDF, High priority: read this firstspecifications
High

Air Force Class J&A for Facility Generators

PDF, Low priorityjustification-and-authorization
Low

Generator Standardization Single Manufacturer Selection Memo

PDF, Low priority2 pages · determination-and-findings
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Brandon Landis

Full Description

Show more
***************************************************************************************************************************************************** 18 MARCH 2025 UPDATE TO ORIGINAL SOURCES SOUGHT POSTING: The Attachment titled "Generator Data Sheet_Cummins.PDF" has been replaced with "Generator Data Sheet_Cummins Updated 18 Mar 25" Respsonses remain due 2:00 p.m. CDT on 31 March 2025. ***************************************************************************************************************************************************** SOURCES SOUGHT TECHNICAL DESCRIPTION FOR CUMMINS BRAND GENERATORS - CONSTRUCTION OF POWER INDEPENDENCE MISSION CONTROL STATION, BUCKLEY SPACE FORCE BASE, COLORADO INTRODUCTION The U.S. Army Corps of Engineers (USACE), Omaha District, Contracting Office, is issuing this sources sought synopsis as a means of conducting market research to identify potential sources having an interest and industry technologies available to support/provide Facility Generators in the construction of the Power Independence Mission Control Station (MCS) at Buckley Space Force Base (SFB), Colorado (CO). The result of this market research will contribute to determining the method of procurement. Based on the responses to this sources sought notice/market research, this requirement may include specifications regarding the generators, or, if justified by market research a brand name Justification and Approval (J&A). USACE intends to issue one design-bid-build construction contract, and the acquisition is anticipated to be solicited as Unrestricted (i.e., full and open competition), however, market research is ongoing at this time. The magnitude of construction is expected to range between $25,000,000 and $100,000,000. This Sources Sought is specific to the facility generators and associated equipment (i.e., switchgear, switchboards, etc.) required for the Power Independence MCS. NOTE: The Air Force has an approved class J&A for Cummins Brand Name Facility Generators. A copy of that class J&A is attached. This is a supplementary market research effort conducted by USACE to support this project. DISCLAIMER THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. PROGRAM BACKGROUND & DESCRIPTION OF SERVICES USACE has received the mission to design, construct a new facility at Buckley SFB in support of their current mission(s). As part of the design and construction effort, new Generators will be installed to support the operation of various facilities, and the Air Force has standardized use of Cummins equipment at Buckley SFB. The Government will not purchase these items directly, but will require the following construction contract to provide and install the following: PROJECT - Power Independence MCS TYPE - MILCON (3300) MAGNITUDE - $25,000,000 to $100,000,000 ITEM - Generator MAKE - Cummins Estimated Amount $11,000,000 to $15,000,000 REQUIRED CAPABILITIES The Government requires multiple generators in support of the Power Independence MCS project. The intent of this Sources Sought is to assess the state-of-the art of the technology available in the generator products that could be applied to this requirement. The Government envisions a solution for generators that meets the following operational and program requirements: See attached Air Force Class J&A - Generators. Non-Developmental Item. The facility generators should be a non-developmental item to the maximum extent possible. Qualification. The facility generators must be qualified and demonstrate compliance to the Cummins brand generators, and all associated components (Reference Attached Specs), capable of supporting the Power Independence MCS. Proof of qualification should be addressed in the response. Maintenance, Inspection and Repair. The Government desires a system with minimal maintenance and inspection requirements at the organizational level. The system should also be easily repairable for deployed units. Interested vendors should provide information on product warranties, repair technicians availability, and repair response times for their products. SPECIAL REQUIREMENTS Any resulting contract may to have a security classification level of Controlled Unclassified Information (CUI). As such, the contract shall be compliant with the specialty metals restriction of the Berry Amendment (10 U.S.C. 2533a and 2533b) in accordance with DFARS clauses 252.225-7008 and 252.225-7009. The security requirements are still being finalized at this time. ELIGIBILITY The applicable NAICS code for this requirement is 237130, Power and Communication Line and Related Structures Construction with a Small Business Size Standard of $45M. The Product Service Code (PSC) is Y1BG, Construction of Electronic and Communications Facilities. The applicable NAICS Code for facility generators is 335312, Motor and Generator Manufacturing with a Small Business Size Standard of 1,250 employees. The PSC is 6115, Generators and Generator Sets, Electrical. SUBMISSION DETAILS Interested businesses should submit a brief capabilities statement package (no more than ten 8.5 X 11-inch pages, font no smaller than 10 point) demonstrating ability to provide the products/systems listed in this Technical Description. Documentation should be in bullet format. No phone or email solicitations with regards to the status of the RFP will be accepted prior to its release. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding submissions. Your response to this Sources Sought, including any capabilities statement, shall be electronically submitted to the Contract Specialist, Brandon Landis, in either Microsoft Word or Portable Document Format (PDF), via email contact@example.gov no later than 2:00 p.m. CDT on 31 March 2025 and reference this synopsis number in subject line of e-mail and on all enclosed documents. Information and materials submitted in response to this request WILL NOT be returned. DO NOT SUBMIT CLASSIFIED MATERIAL. If your organization has the potential capacity to provide the required products/systems, please provide the following information: 1) Organization name, address, primary points of contact (POCs) and their email address, website address, telephone number, and type of ownership for the organization; and 2) Tailored capability statements addressing the requirements of this notice, with appropriate documentation supporting claims of organizational and staff capability. All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a total small business set-aside for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The project focuses on facilities G7140 and H7140 and is structured as a firm-fixed-price contract with a final delivery deadline of March 20, 2027. The scope of work requires a certified API 653 inspector to conduct external inspections, visual assessments of containment areas, and verification of alarms and Automatic Tank Gauge equipment. Deliverables include a teleconference kick-off meeting, completed API Std 653 checklists, and the submission of draft and final reports that identify any appurtenances not complying with DoD Standard AW 78-24-27. The government will award the contract to the responsible offeror deemed most advantageous based on technical capability, experience, and price reasonableness. Proposals must be submitted as a single PDF not exceeding five pages, excluding the cover page, price worksheet, and certifications. Required submission materials include the inspector's certification, a one-page resume, and past performance references. Due to the work being performed on a closed military installation, all personnel must undergo identity proofing and vetting unless they possess a current government security clearance. Quotes must be submitted electronically to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by the response deadline of November 13, 2026.
All Other Professional, Scientific, and Technical Services

POSTED

about 11 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS