Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Spada Lake Wildlife Habitat Thinning

Closed
26-1676-SRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 113310
New
Federal
Leverich Helio Stewardship IRSC
Solicitation # 12363N26Q4248
The USDA Forest Service is conducting market research via a Sources Sought and Request for Information for the Leverich Helio Stewardship IRSC project, located in the Custer Gallatin National Forest within the Bozeman Ranger District, Montana. This small business set-aside project aims to reduce wildland fire risk and protect the Bozeman municipal water supply through fuels reduction on steep and rugged terrain. The anticipated scope of work includes the whole-tree helicopter yarding and removal of approximately 290 CCF of Lodgepole pine and 2,045 CCF of Douglas-fir and other sawtimber across 151 acres, the piling of slash at landing areas, and the decommissioning of 0.59 miles of Temporary Road Use Permit roads. The anticipated period of performance is estimated to begin in late spring or early summer 2027 and will not exceed two operational seasons. Performance requirements include strict adherence to road maintenance T-specifications, erosion control, and product identification via hammer branding for logs meeting specific size criteria. The government will evaluate capabilities based on relevant experience in hazardous fuel reduction and steep slope timber operations. Interested vendors were invited to a site visit on October 1, 2026, with capability statements due by October 15, 2026. Acceptance of work will be based on a 100 percent minimum acceptable quality level for both timber removal and road decommissioning, verified through visual inspections by the Contracting Officer's Representative.
Stewardship Contracting Branch Usda-Fs

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 113310
New
Federal
12363N26Q4212 DH Brockover IRSC Stewardship
Solicitation # 12363N26Q4212
Solicitation 12363N26Q4212 is a Request for Quotation for the DH Brockover IRSC Stewardship project, issued as a BPA call under the R2 Rocky Mountain Restoration Project for the San Juan National Forest in Colorado. The project focuses on fuels reduction within a Wildland Urban Interface and high recreational use area near Durango to increase forest resiliency, reduce high-severity wildfire risk, and improve wildlife habitat. The scope of work involves cutting, skidding, decking, hand treating, and piling 374 acres across seven units. Mandatory requirements include the harvest and removal of sawtimber from Units 1, 2, and 3 (approximately 167 acres), while Units 4 through 7 (approximately 207 acres) are optional. Additionally, the contractor must process and stack 75 percent of top wood biomass from harvested trees with a diameter of 9 inches and up. The performance period extends from the date of award through November 30, 2029. This procurement is restricted to approved companies eligible for call orders under the R2 Rocky Mountain Restoration Project BPA. Award evaluation is based on a technical approach, relevant past performance, and the benefit to the local community, with these factors combined being approximately equal to price. Contractors are responsible for all pre, during, and post-haul road maintenance according to specific T-Specifications without additional compensation. The contract is a firm-fixed-price agreement, and the government will utilize a tiered inspection process involving visual assessments and verification plots to ensure compliance with residual basal area and tree selection standards.
USDA Fs San Juan National Forest

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 113310
New
Federal
Banana Peel DxP IRSC
Solicitation # 12363N26Q4227
Solicitation 12363N26Q4227 is a firm fixed price procurement for the Banana Peel DxP IRSC project, located within the Mancos-Dolores Ranger District of the San Juan National Forest in Colorado. This project is restricted to approved companies eligible for call orders under the R2 Rocky Mountain Restoration Project Stewardship BPA and is 100% set aside for Women-Owned Small Businesses. The primary objectives are to increase forest resiliency, reduce high-severity wildfire risk, and promote vegetation recovery across approximately 567 acres. The scope of work includes mandatory and optional activities such as cutting, skidding, decking, and piling of live and dead ponderosa pine timber, as well as road decommissioning and boulder placement. The contract is divided into mandatory work items with a performance period ending December 31, 2028, and optional work items extending through December 31, 2030. Technical requirements are detailed across several appendices, including specifications for service work, timber removal, and road maintenance. Award decisions are based on best overall value, evaluating technical approach, relevant past performance, and benefits to the local community alongside cost. Contractors must adhere to Service Contract Act Wage Determination 1976-1351 and provide key personnel, including an Overall Project Manager and Logging Supervisor. Proposals must be submitted as separate technical and price documents by September 14, 2026.
Stewardship Contracting Branch Usda-Fs

POSTED

2 days ago

DEADLINE

in 2 days
NAICS: 113310
New
Federal
Mavreeso IRSC
Solicitation # 12363N26Q4119
Solicitation 12363N26Q4119 is a combined small business set-aside call order under the Rocky Mountain Restoration Project Stewardship BPA for the San Juan National Forest in the Dolores Ranger District, Colorado. The project, known as Mavreeso IRSC, focuses on improving the resilience of aspen forest ecosystems through the removal of live and dead aspen greater than 7.0 inches DBH and the execution of road reconstruction and maintenance to reduce erosion. The scope of work includes mandatory and optional activities detailed across four technical appendices, covering timber removal specifications, road maintenance requirements, and specific road reconstruction work items such as culvert installation and grading. Performance is scheduled from the date of award through December 31, 2030, for mandatory items and August 1, 2031, for optional items, with work commencing within 10 calendar days of a Notice to Proceed. Award will be based on the most advantageous offer, evaluating technical approach, relevant past performance, and the utilization of local workforces and community benefits, with price as a final criterion. Proposals must be submitted as separate technical and price documents. The contract incorporates various federal regulations, including the Service Contract Act and Highway Construction wage determinations for Colorado. Key requirements include the provision of bid, payment, and performance bonds based on contract value thresholds, adherence to FP-24 road construction standards, and compliance with environmental protections, including the immediate suspension of work if raptor nests or archaeological sites are discovered. Payment is structured through a combination of stewardship credits and appropriated funds.
Stewardship Contracting Branch Usda-Fs

POSTED

2 days ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Snohomish County Public Utility District is soliciting bids for a commercial timber thinning operation at Spada Lake, identified under solicitation number 26-1676-SR, with proposals due by May 26, 2026. The contract involves the removal of approximately 16,250 tons of sawlogs at a minimum bid rate of $0.10 per ton, with an optional 1,132 tons of pulp available at $0.00 per ton, resulting in a minimum estimated contract value of $1,625. All timber must be harvested in accordance with strict operational protocols, including a prohibited cutting window from April 1 to July 1 due to bark slippage, and additional restrictions from April 1 to September 22 to protect the marbled murrelet, limiting daily operations to 30 minutes before sunrise and 30 minutes after sunset. Timber removal must be completed within four weeks of felling, and all work, including road maintenance, erosion control, and site restoration, must be finished by December 1, 2027. Harvesting is governed by an approved Road Plan dated March 3, 2026, and must comply with specific technical standards for materials, including 3-inch minus ballast rock with no more than 5% organic debris, and adherence to WAC and AASHTO standards for culvert and subgrade construction. Contractual obligations include mandatory environmental protections such as retaining snags and non-merchantable trees, capping stump heights at 12 inches or 2 inches above the root collar—whichever is lower—and requiring water bars on all skid trails while strictly prohibiting slash piles. Skid trails are limited to 17 feet in width, with ground-based equipment restricted to slopes of 30% or less, unless written approval is obtained. All fallers and yarder operators must be certified, and deviations from the approved cutting plan require 30 days of advance notice and prior authorization from the Contract Administrator. Timber must be uniquely identified through a State of Washington registered log brand and durable blue paint, with at least three logs branded per load and ten painted logs required for any export-restricted pulp. Payment for forest products is based on tonnage verified through approved scales and reporting via the Log and Load Reporting Service, with invoicing tied to load tickets. Title to the timber transfers upon contract execution, and the purchaser is responsible for all

General Info

Timber harvest for commercial thinning at Spada Lake, WA, with bid deadline May 26, 2026.

Agency

Washington → Snohomish County PUDView Agency

NAICS

113310 - LoggingView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(8)

RFP 26-1676-SR Addendum 1 for Spada Lake Wildlife Habitat Thinning

PDFamendment

RFP 26-1676-SR Instructions to Bidders

PDFrfp

04_26-1676-SR Exhibit C-Spada Thinning Road Plan - 030326

PDFroad-plan

RFP 26-1676-SR Offer and Proposal Certification

PDFrfp

01_26-1676-SR Contract for Forest Products - Spada Lake Wildlife Habitat Thinning

PDFcontract-document

Henry M. Jackson Hydroelectric Project Unanticipated Discovery Plan

PDFunanticipated-discovery-plan

Exhibit B Thinning Prescriptions for Timber Harvest

PDFsow

Spada Lake Wildlife Habitat Improvement Thin - Timber Sales Maps

PDFexhibit

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Snohomish County PUD
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → Snohomish County PUD
View Agency Profile
Office AddressN/A

Full Description

Show more
Project Description: Timber harvest/sale for commercial thinning at Spada Lake. All requests for clarification or additional information regarding this RFP must be submitted to the District via e-mail to Bids@snopud.com. The District will not guarantee responses to questions received via other forms of communication (phone, voicemail, text, IM, etc.). Do not submit questions via Public Purchase

More opportunities from Washington → Snohomish County PUD

Same awarding agency

NAICS: 541614
SLED
Supply Chain Management Consulting
Solicitation # 26-1644-SR
Public Utility District No. 1 of Snohomish County is seeking qualified consultants through RFQ 26-1644-SR to establish a roster of experts for supply chain management consulting. The primary objective is to analyze the District's supply chain, identify gaps against industry best practices and regulatory requirements, and provide prioritized remediation roadmaps. The scope of work is comprehensive, covering demand and supply planning, sourcing, contracting, supplier management, logistics, inventory, risk and compliance, technology, and sustainability. Assessments must align with standards relevant to U.S. electric utilities, including NERC CIP, FERC, DOE, NIST, and ISO standards. Key deliverables include project charters, current state assessment reports with process maps, and final closeout packages. The selection process is based on best evaluated qualifications, with a strong emphasis on experience with comparable electric utilities and SAP MRP operations. The District utilizes a three-stage evaluation process involving pass/fail gates for completeness and responsiveness before ranking firms based on expertise and references. Awarded consultants will operate as independent contractors, with contract terms and engagement durations varying by project. Requirements include maintaining professional liability and workers' compensation insurance of at least 1 million dollars and adhering to strict confidentiality and non-disclosure agreements regarding critical infrastructure information. Submissions are accepted electronically through December 31, 2026, and must be signed by an authorized representative.
Process, Physical Distribution, and Logistics Consulting Services

POSTED

6 months ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS