Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

ST21-0692, 31R-13L DB OUTBOARD RUNWAY REPLACEMENT, NASF

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Navy, via Navfac Southwest, is initiating a project for the complete full depth replacement of the failing Outboard Runway 31R and its associated support surfaces, including shoulders and overruns. The existing infrastructure consists of 11 to 12 inch Portland Cement Concrete originally built in 1988. This project will be executed in two distinct phases, with Phase 1 covering the first 1500 feet of the takeoff area north of Taxiway Bravo, and Phase 2 encompassing the remainder of the runway and support surfaces. The current scope of work focuses on the development of essential planning documentation, specifically the DD1391, Statement of Work, and Independent Government Estimate to support the phased approach. While the project involves extensive concrete replacement, no lighting replacement is required. The effort is categorized under NAICS code 237990 and is currently listed as a forecast.

General Info

Navfac Southwest project for phased full depth replacement of Outboard Runway 31R surfaces.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

SW: PDCDES, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The planning department is submitting a new Special Project to repair the Outboard Runway (31R). The project will consist of the full depth replacement of the runway and support surfaces (shoulders, overruns). The project will be phased. Phase 1: The first 1500 ft of the take off area (north of TW Bravo). Phase 2: The rest of the runway and support surfaces. This form is requesting the development of a DD1391, SOW, and IGE, illustrating the phased approach of the project. MDI: 86 RUNWAY CONSTRUCTION: 11"-12" PORTLAND CEMENT CONCRETE. BUILT IN 1988. PROJECT: COMPLETE FULL DEPTH REPLACEMENT OF FAILING OUTBOARD RUNWAY & SHOULDERS. NO LIGHTING REPLACEMENT REQUIRED. ** THIS SOW & IGE IS FOR 1391 DEVELOPMENT**

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of The Navy → Navfac Southwest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS