Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Storage Facility Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 2026/S 000-096276.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

UOW997 - SJC Storage Unit

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of Worcester
ContactsNo contacts available
OfficeN/A
Organization / AgencyUniversity of Worcester
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and erects a supplied 20x8m storage facility for prime contractors on University of Worcester facility projects. Unloads materials, assembles the structural frame, installs wall panels and roofing, and secures the unit to the foundation per manufacturer specifications. Delivers a fully assembled and secured storage facility.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes site preparation, concrete slab installation, the purchase and erection of the steel building, and the installation of underground utilities and stormwater mitigation via an infiltration pond. Specialized requirements include the installation of desiccant dehumidifying equipment, a dry pipe fire suppression system compliant with UFC 3-600-01 and NFPA 13, and the provision of conduit to support a future photovoltaic solar system. The project is estimated between 1 million and 5 million dollars, with a statutory limit of 5 million dollars. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must adhere to strict quality standards, including ISO 9001 and various ASTM and WSDOT specifications. The contractor is required to provide bid guarantees, and performance and payment bonds are mandatory for awards exceeding 150,000 dollars. All labor must comply with the Davis-Bacon Act per Wage Determination WA20260111 for Pierce County. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor and Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution project at the Seattle-Tacoma International Airport in Washington. This solicitation is designated as an 8A set-aside for Small Disadvantaged Businesses and encompasses ten distinct construction subsystems. The scope of work includes glass and aluminum systems, vertical transportation, the demolition and installation of passenger loading bridges, and various interior finishes for main electrical rooms, such as masonry, drywall, doors, frames, hardware, miscellaneous metals, firestopping, joint sealants, and paint and epoxy flooring. Budget ranges for these subsystems vary significantly, with the largest allocations for glass and aluminum systems and vertical transportation. The project is governed by a Project Labor Agreement and requires all subcontractors to provide a Workers Compensation Waiver of Subrogation. Bidders must submit their proposals via email using the official bid form and include a required bid bond. Successful awardees will be required to furnish Small Business Administration documentation and execute contracts using standard Hensel Phelps subcontract forms. The solicitation emphasizes the inclusion of diverse trade partners, specifically encouraging participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses.
Hensel Phelps

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is managed by C. Overaa & Co. and is scheduled for completion within 915 calendar days. The scope of work is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a Membrane Bioreactor (MBR) system, SCADA, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. A critical requirement of the project is the maintenance of the existing treatment plant's operations during the first two phases of construction. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to reside in Monterey, San Benito, or Santa Cruz counties. Bids are due by October 28, 2026, following a mandatory pre-bid meeting on October 5, 2026. Subcontractors must agree to the standard Overaa agreement, provide a 100 percent performance and labor bond if requested, and comply with specific insurance requirements including a waiver of subrogation. Invoicing and payments will be processed electronically through the Textura system, with associated service fees borne by the subcontractor.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
General Maintenance Services
Solicitation # RFP-017-3046801-JL2
The County of Orange Executive Office CPO is soliciting proposals under RFP-017-3046801-JL2 for General Maintenance Services to preserve, protect, and maintain various facility systems and components across multiple County locations in Santa Ana, California. This time and materials contract focuses strictly on routine, recurring, and usual maintenance, including the repair and replacement of flooring, glazing, HVAC, security doors and locks, and exterior elements like fences and railings. The scope specifically excludes new construction, renovations, or capital improvements. To be eligible, contractors must possess an active California Contractors State License Board Class B General Building Contractor license and comply with various federal and state regulations, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Title VI of the Civil Rights Act of 1964. The selection process utilizes a points-based scoring system totaling 1,000 points, divided among a written response (500 points), presentations or interviews (400 points), and a cost proposal based on total hourly rates (100 points). A five percent preference is applied to the cost scores of certified Orange County Local Small Business or Disabled Veteran Business Enterprise entities. Proposals must be submitted electronically via the eProcurement Portal by November 6, 2026, and must be organized into three parts: Compliance Statements, Company Profile and References, and a Respondent's Response limited to 20 pages. Awardees will be required to provide a valid Unique Entity Identifier and D-U-N-S number, and all personnel accessing secured facilities must undergo a security clearance process.
County Executive Office - CPO

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details

More opportunities from University of Worcester

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS