Storm Drain & Catch Basin Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Storm Drain and Catch Basin Installation involves the removal of failing catch basin structures and the installation of new drainage systems at the Hill Correctional Center in Galesburg, Illinois. The scope of work includes excavating to outlet pipe depth, removing existing blocks and backfill, and installing precast concrete catch basins equipped with ductile-iron frames and grates using flexible, watertight couplers. The contractor is responsible for delivering a fully functional storm drain system that adheres to all applicable City, County, and State of Illinois standards. This project is categorized under NAICS code 238910 and is intended for prime contractors operating on Illinois Department of Corrections projects.

General Info

Subcontract for installing new storm drains and catch basins at Hill Correctional Center.

Agency

Illinois → Hill Correctional CenterView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Galesburg, IL, 61401, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-426DOC-HILLC-B-51775.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-426DOC-HILLC-B-51775 | IFB Repair/Replace Storm Drain and Sidewalk (MDS)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Hill Correctional Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
Illinois → Hill Correctional Center
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of failing catch basin structures and installation of new drainage systems for prime contractors on Illinois Department of Corrections projects. Excavates around catch basins to outlet pipe depth, removes existing blocks and backfill, and installs precast concrete catch basins with ductile-iron frames and grates using flexible, watertight couplers. Work must meet City, County, and State of Illinois standards. Delivers a functional storm drain system.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
2026 CDBG Asbestos Abatement And Demolition Project
Solicitation # MS27-034
The City of Victorville is soliciting bids under solicitation MS27-034 for the 2026 CDBG Asbestos Abatement and Demolition Project. This project, funded by the Community Development Block Grant program, requires a qualified contractor to perform asbestos abatement, demolition, debris removal, disposal, and site clearance at four specific properties located at 13733 Starshine Dr., 18401 Shay Road, 11757 Kittering Rd., and 16672 E Street in Victorville, California. The contract will be awarded to the lowest responsible bidder, and the selected contractor must complete all work within 60 calendar days of the Notice to Proceed. Key requirements include attendance at a mandatory pre-bid meeting and job walk on September 22, 2026, with a final response deadline of October 6, 2026. Bidders must provide a bid bond of at least 10% of the total proposal and, upon award, furnish performance and payment bonds equal to 100% of the contract price. The project mandates strict compliance with California Title 8 asbestos safety regulations, Davis-Bacon wage determinations, DIR registration, and the Americans with Disabilities Act. Contractors must also submit a proposed drainage plan before starting work and provide certified payrolls and lien releases with each invoice to ensure payment. The City encourages participation from small, minority, and women-owned businesses.
City of Victorville

POSTED

about 23 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Illinois → Hill Correctional Center

Same awarding agency

NAICS: 237310
SLED
26-426DOC-HILLC-B-51775 | IFB Repair/Replace Storm Drain and Sidewalk (MDS)
Solicitation # 26-426DOC-HILLC-B-51775
Solicitation 26-426DOC-HILLC-B-51775 is an Invitation for Bid issued by the Illinois Department of Corrections for a one-time project to repair and replace collapsing storm drain catch basins and adjacent sidewalks at the Hill Correctional Center in Galesburg, Illinois. The scope of work includes excavating to the depth of outlet pipe connections, removing and disposing of unstable structures and debris, installing new precast concrete catch basins with ductile-iron frames and grates, and constructing cement concrete sidewalks with broom finishes and contraction joints. All work must meet City, County, and State of Illinois standards, and the contractor is responsible for site restoration using topsoil, seed, or sod. The contract term extends through July 31, 2026, with a twelve-month warranty on all workmanship and materials. The award will be granted to the responsive and responsible bidder offering the lowest price. Bidders must submit all responses electronically via the BidBuy portal and comply with Business Enterprise Program goals, including the submission of a utilization plan. Key requirements include maintaining general commercial liability insurance of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate, as well as adhering to prevailing wage laws. Due to the nature of the facility, all on-site personnel must undergo criminal and driver history background checks and potential drug testing. Invoicing is submitted upon completion and is subject to approval by the Business Administrator.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS