Storm Sewer Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the installation of new stormwater infrastructure for prime contractors working on projects for the Hillsborough County Board of County Commissioners. The scope of work includes the excavation and installation of storm sewer systems, cross drains, side drains, manhole and inlet structures, and outfall or end treatments. Because work is performed under wet conditions, the contractor must utilize dewatering equipment and Z-shaped sheet pile cofferdam systems to ensure successful delivery of installed and tested systems. All work must adhere to the Hillsborough County Public Works and FDOT FY 2026-27 standards. The solicitation was posted on September 16, 2026, with a response deadline of October 20, 2026. This project falls under NAICS code 237990 and is managed by Hillsborough County in Florida.

General Info

Subcontract for stormwater infrastructure installation in Hillsborough County, Florida, deadline October 20, 2026.

Agency

Florida → Hillsborough CountyView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB-26-00286.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Stormwater CRRP Construction WORCS Contract CDBG-DR North

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Hillsborough County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Hillsborough County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new stormwater infrastructure for prime contractors on Hillsborough County Board of County Commissioners projects. Performs excavation and installation of storm sewer systems, cross drains, side drains, manhole and inlet structures, and outfall/end treatments under wet conditions. Utilizes dewatering equipment and Z-shaped sheet pile cofferdam systems. Adheres to Hillsborough County Public Works and FDOT FY 2026-27 standards. Delivers installed and tested storm sewer systems.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237990
New
Federal
Kalispel Tribe Dike Repair- Pend Oreille County, Washington
Solicitation # 12FPC326B0016
The USDA NRCS is soliciting proposals for the repair of the Kalispel Tribe Dike in Pend Oreille County, Washington, under solicitation 12FPC326B0016. This total small business set-aside project has an estimated magnitude between $250,000 and $500,000. The scope of work includes site dewatering, erosion control, excavating and stockpiling dike soil, and the removal and resetting of a 36-inch diameter dike culvert and anti-seep collars. If the existing culvert and collars are found to be unsalvageable, the contractor must install new replacements. Final restoration involves placing nonwoven geotextile and riprap around the culvert outlet, followed by backfilling and compacting the dike to specification. The period of performance is scheduled from October 12, 2026, to November 1, 2027. Bids are due by September 21, 2026, and must be submitted via email with all required signatures and a bid guarantee. Award will be made to the responsible bidder whose proposal is most advantageous to the government, based on price and previous experience with similar projects over the last five years. The project is subject to Davis-Bacon Act prevailing wage rates and requires compliance with NRCS construction and material specifications. All work is subject to government inspection, and the contractor must maintain a rigorous quality control system, submitting inspection records within one working day of completion.
Fpac Bus Cntr-Acq Division

POSTED

about 8 hours ago

DEADLINE

in about 1 hour
View Details
NAICS: 237990
New
SLED
Entrada Way Culvert Slip-out Bank Stabilization ProjectThe County of San Mateo Department of Public Works is implementing the Entrada Way Culvert Slip-out Bank Stabilization Project to repair progressive bank failure along La Honda Creek in the unincorporated community of La Honda, California. The project aims to protect critical infrastructure, including the Entrada Way roadway, stormwater systems, and utility poles, while improving water quality and enhancing riparian habitat. The scope of work involves a biotechnical approach featuring the construction of an engineered log structure cribwall along the lower bank and vegetated soil lifts on the upper slopes. Additional technical requirements include extending the existing culvert headwall by approximately 22 linear feet, realigning the creek thalweg to its original pre-erosional position, realigning a storm drain pipe, and performing minor roadway improvements and site revegetation. The project is subject to comprehensive environmental compliance under the California Environmental Quality Act, with a Mitigated Negative Declaration filed in June 2026. Key regulatory requirements include coordination with Caltrans for transportation permits and ADA compliance, as well as adherence to California Department of Fish and Wildlife regulations regarding the Native Plant Protection Act and Lake and Streambed Alteration. Specific operational mandates include the relocation of aquatic wildlife prior to dewatering, strict concrete washout protocols to prevent stream contamination, and the maintenance of bicycle and pedestrian access throughout construction. The project area encompasses approximately 2.0 acres and is managed by the Natural Resource Manager, Julie Casagrande.
California San Mateo County Department of Public Works

POSTED

about 13 hours ago

DEADLINE

N/A
View Details

More opportunities from Florida → Hillsborough County

Same awarding agency

NAICS: 238210
New
SLED
eFemto Installations for new County Buildings
Solicitation # SS-26-00421
Hillsborough County is pursuing a special procurement award to Source 1 Solutions, Inc. for the turnkey installation of Verizon-compatible eFemto small-cell systems at multiple facilities, including Fire Stations 21, 47, 48, and the Fire Rescue Warehouse. The project, valued at 47,730.55, involves the procurement of hardware, installation of a Passive Distributed Antenna System (DAS) with RF coaxial cabling and antennas, configuration, testing, and commissioning to improve Verizon Wireless LTE indoor coverage. This is a one-time project conducted under a fixed-fee structure, with services invoiced via milestones upon completion. The procurement is being handled as a sole source under Section 3-207 of the County’s Procurement Policy because Source 1 Solutions provides a single point of accountability for Verizon network integration, whereas alternative vendors were found to be unable to fulfill the complete scope independently. The scope of work includes mounting eFemto units in telecommunications closets and performing a post-installation walk test to verify signal presence. However, formal carrier certification and specific performance metrics such as RSSI, RSRP, and SINR are excluded. The County maintains the right to adjust the scope of services or extend the time period as requirements change.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
SLED
Stormwater CRRP Construction WORCS Contract CDBG-DR North
Solicitation # IFB-26-00286
Hillsborough County is seeking experienced contractors for the Stormwater CRRP Construction WORCS Contract CDBG-DR North (IFB-26-00286) to perform as-needed culvert repair and replacement. The work is primarily located north of I-4 and I-275, though assignments may occur throughout the county. This term contract, estimated at 18,258,390.04 dollars, involves a comprehensive scope of work including the installation of storm sewer systems, CIPP lining of existing sewers, roadway and right-of-way restoration, construction of retention and detention ponds, and the relocation of potable water, reclaimed water, and sanitary lines. The contract is governed by FDOT Standard Specifications FY 2026-27 and requires strict adherence to federal CDBG-DR compliance, including drug-free workplace and anti-lobbying provisions. Contractors must provide performance and payment bonds and certify they do not conduct business with specified foreign countries of concern. Key operational requirements include the submission of a Maintenance of Traffic plan, adherence to ADA standards for pedestrian facilities, and a strict response timeline for emergency work, requiring confirmation within 24 hours and a site visit within 48 hours of notification. Payment is structured through individual work orders with specific provisions for mobilization, project surveys, and non-priced items.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS