Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

DAY DOCK AT RIVERWALK PARK

Open
ITB-26-26-CWState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Port Orange is soliciting bids for the construction of a Day Docking facility at Riverwalk Park to provide recreational boaters along the Intracoastal Waterway with safe access to landward park amenities. The project involves a phased development approach designed to accommodate vessels up to 35 feet in length, with an initial capacity for ten mooring slips and the potential for future expansion. The scope of work includes the installation of a 880 square foot fixed timber access dock, a 1,315 square foot concrete floating dock system, and one 30 by 7 foot aluminum gangway. Additional requirements include mechanical dredging of 2,750 cubic yards, the installation of eight private aids to navigation, concrete sidewalks and curbing, a fire hydrant, an FDC and standpipe system, and dock lighting and electrical utilities. The contract will be awarded to the lowest responsive and responsible bidder based on price, bidder capability, professional standing, and past performance. Bidders must be licensed to do business in the State of Florida and provide a Sunbiz report, a current bonding capacity letter, and a site-specific safety plan. Technical specifications require adherence to AWPA standards for timber piles and lumber, OSHA safety standards, and the use of FDOT Type II floating turbidity barriers for environmental compliance. All payments will be processed via ACH within 45 days of receiving a proper invoice. Submissions must be delivered by mail or hand delivery, consisting of one original and one digital PDF version on a flash drive.

General Info

Bids for constructing a Day Docking facility at Port Orange's Riverwalk Park.

Documents

32
PDF, High priority: read this first2 pages · bid-bond
High
PDF, High priority: read this first11 pages · contract-document
High
PDF, High priority: read this first52 pages · itb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first30 pages · specifications
High
PDF, High priority: read this first84 pages · specifications
High
PDF, High priority: read this firstpermit
High
PDF, High priority: read this first1 page · supporting-document
High
PDF, High priority: read this first1 page · bid-form
High
PDF, High priority: read this first1 page · past-performance
High
PDF, High priority: read this first17 pages · specifications
High
XLSX, High priority: read this first1 page · bid-schedule
High
PDF, Low priority1 page · supporting-document
Low
PDF, Low priority1 page · certification
Low
PDF, Low priority3 pages · other
Low
PDF, Low priority1 page · affidavit
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · certification
Low
PDF, Low priority1 page · certification-form
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · no-bid-form
Low
PDF, Low priority2 pages · representations-certifications
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · supporting-document
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · past-performance
Low
PDF, Low priority1 page · subcontractor-list-form
Low
PDF, Low priority1 page · affidavit
Low
PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Community Development
Contacts2 people available
OfficePort Orange, FL, 32127, USA
Office AddressPort Orange, FL, 32127, USA
Contacts
Margaret TomlinsonConstruction & Engineering Manager - Community Development
Catrina WilsonPurchasing Manager

Interested Companies (25)

A2 GroupPort Charlotte, FL
AtkinsRealis USATampa, FL
Crunch ConstructionDaytona Beach, FL

See All 25 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
As part of the comprehensive Riverfront Park development enhancement and public access, the City of Port Orange is seeking to build a Day (transient) Docking facility. The intent of this Day Dock facility is to provide recreational boaters access to the City's landward park amenities. The current intent is to develop a phased approach that will ultimately allow the City to accommodate up to 35-foot boat vessels. This project will accommodate mooring of up to ten (10) vessels with a potential to add more slips as demand increases. Currently there is no ability for boaters to dock to use the park facility and amenities at this location. This project will increase transient docking availability which allows all boaters along the ICW to safely dock and use the park especially larger transient boats.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
RFB No. 27-0017 Carver Lake Park - Phase 1
Solicitation # 27-0017
The Columbus Consolidated Government is soliciting bids for the Carver Lake Park Phase 1 project in Columbus, Georgia. The scope of work involves comprehensive site improvements, including demolition, clearing, grubbing, earthwork, and grading. Key deliverables include the construction of access drives, parking areas with permeable pavers, concrete sidewalks, curb and gutter, and a 10-foot-wide multi-use trail. The project also encompasses the development of playground and pavilion areas, improvements to the existing splash pad, fencing, site signage, landscaping, and associated storm drainage and utility improvements. The contract will be awarded to the responsive and responsible bidder submitting the lowest base bid. Qualified bidders must be licensed contractors in the State of Georgia, maintain a permanent place of business, and demonstrate sufficient financial resources and construction experience. The project requires substantial completion within 550 consecutive calendar days, with final payment readiness by 580 days. Successful bidders must provide performance and payment bonds totaling 100 percent of the contract amount. The project mandates strict adherence to various federal and state regulations, including the Davis-Bacon Act, the Copeland Act, and the Anti-Kickback Act, while emphasizing a preference for qualified local labor and businesses.
Columbus Consolidated Government

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Cheshire Park Adaptive Turf Field
Solicitation # 2627-03
The Town of Cheshire is soliciting competitive bids for the Cheshire Park Adaptive Turf Field project (ITB #2627-03) in Connecticut. This project utilizes the AIA Document A101-2017 Standard Agreement and requires a lump sum base bid, with optional alternates for field lighting, a scoreboard, dugout shelters, a batting cage, and a turf groomer. Sealed bids must be submitted in opaque envelopes—including one original, one copy, and one electronic copy on a USB drive—to the Department of Public Works and Engineering by 11:00 AM on December 1, 2026. Bids must be signed by a principal officer or owner and include a bid bond or certified check for 5% of the bid amount for contracts exceeding $50,000. The scope of work involves comprehensive site development, including grading, utilities, and sediment and erosion controls, supported by geotechnical and topsoil analysis. Technical requirements include a 25-year warranty on light levels and strict adherence to IESNA RP-6-22 for illumination measurements. Contractors must comply with prevailing wage laws, the Americans with Disabilities Act, and state set-aside requirements for minority and women-owned businesses. Quality control is rigorous, requiring specific handling and storage of coated reinforcing steel and mandatory field density testing. Project administration is overseen by the Town Engineer and the Director of Public Works, with payments processed using EJCDC Form No. C-620.
DAS Procurement

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Three Lakes Park Stream Restoration
Solicitation # 26-3028-11EAR
The Three Lakes Park Stream Restoration project, solicitation number 26-3028-11EAR, is an invitation for bids to restore approximately 1,520 linear feet of an unnamed tributary to Upham Brook in Henrico County, Virginia. The project utilizes a Priority 2 restoration approach, which involves constructing a new bankfull channel within a newly excavated lower floodplain bench, designed as a low sinuosity C3/C3b type channel. Key technical requirements include the installation of wood and rock structures for grade control, the planting of native vegetation to stabilize banks, and adherence to the 2024 General VPDES Permit for Discharges of Stormwater from Construction Activities. The contractor must possess a Virginia Contractor’s License Class A and be a registered contractor in the Commonwealth of Virginia. The contract is a unit price agreement with a performance period of 365 calendar days from the written Notice to Proceed. Bids must be submitted via the ProcureWare portal by 3:00 PM on December 16, 2026, and must include a bid bond, cashier's check, or certified check for 5% of the Total Unit Price Base Bid. Award will be granted to the lowest responsive and responsible bidder. Required documentation includes a bid signature sheet, business category classification, and Virginia State Corporation Commission registration. A non-mandatory pre-bid meeting and site visit are scheduled for December 2, 2026, at the Purchasing Division Office.
Henrico County

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Florida → Community Development

Same awarding agency

NAICS: 541320
New
SLED
Land Development Code Update
Solicitation # 26-107
The City of Fort Myers, Florida, issued solicitation RFP 26-107 to engage a qualified multidisciplinary consulting firm for a comprehensive rewrite of its Land Development Code (LDC). The primary objective is to align the LDC with the updated Comprehensive Plan and remove regulatory barriers to infill, adaptive reuse, and redevelopment. The scope of work includes project management, an assessment of existing conditions and code consistency, the development of a new code framework, and extensive stakeholder and public engagement. Key deliverables include an existing conditions report, a code crosswalk, a preliminary rewritten LDC within six months, and final adoption-ready documents and training materials within one year of the project start date. Proposals must be submitted as a single PDF via the OpenGov portal by November 13, 2026. Qualified respondents must demonstrate at least five years of business stability and provide mandatory certifications, including a Human Trafficking Affidavit, Current Capacity Certification, and Non-Collusion Certification. The City will utilize a points-based scoring method to rank short-listed firms, with the highest-ranked respondent entering negotiations for a Professional Services Agreement. While the solicitation originally included special conditions for Minority Business Enterprises and local preferences, these were removed via Addendum 1. Selected consultants must adhere to strict insurance requirements and quality control standards to ensure legal consistency and technical accuracy in all final deliverables.
Landscape Architectural Services

POSTED

6 days ago

DEADLINE

in 3 days
View Details
NAICS: 236118
SLED
RFP 26-24-CW_Re-Advertisement for the Elevation of Flood Prone Homes
Solicitation # RFP-26-24-CW
The City of Port Orange is soliciting competitive sealed proposals under RFP-26-24-CW for the elevation of up to 11 single-family flood-prone homes. Funded through the FEMA Hazard Mitigation Grant Program, the project requires the elevation of habitable living areas onto new open foundations on pilings, replacing stem walls. The scope of work is comprehensive, encompassing boundary surveys, structural and geotechnical assessments, engineering, permitting, and the physical elevation of structures using beams and jacks. Additionally, the contractor must handle utility disconnects and reconnects, ensuring all electrical services are moved underground, and perform final site restoration including grading and landscaping. For two specific residences, the project includes the installation of medically required ADA-compliant lift platforms. Proposals are due by November 13, 2026, at 4:00 pm, and must be submitted both electronically and in physical form. The City intends to establish a pool of qualified contractors and will award contracts based on respondent capacity, with a substantial completion deadline of January 31, 2028, and final completion by March 1, 2028. Evaluation is based on a 10-point weighted score formula considering responsiveness, technical capability, timeline performance, and professional references. Awarded contractors must provide performance and payment bonds for 100 percent of the contract price and adhere to strict federal and state compliance standards, including 2 CFR Part 200, E-Verify, and the Build America Buy America Act. While the project involves construction, the Davis-Bacon Act does not apply.
Residential Remodelers

POSTED

14 days ago

DEADLINE

in 3 days
View Details
NAICS: 236115
SLED
ITB-26-18 - Mitigation Reconstruction of a Flood Prone Home Project
Solicitation # ITB-26-18-CW
The City of Port Orange is soliciting bids for the Mitigation Reconstruction of a Flood Prone Home Project (ITB-26-18-CW), which involves the installation of one new elevated manufactured home on a permanent foundation in a manufactured home park. The project requires the replacement structure to be no larger than 1,372 square feet and elevated at least 3.4 feet above existing conditions to meet specific flood elevation requirements. Key deliverables include a code-compliant, habitable residence with elevated mechanical, electrical, and plumbing systems, ADA-accessible features including a lift, and full site restoration. All work must adhere to the Florida Building Code, ASCE 24-14, and National Flood Insurance Program requirements. This project is funded through a FEMA Hazard Mitigation Grant Program subaward, necessitating strict compliance with 2 C.F.R. Part 200 and other federal provisions. While the Davis-Bacon Act does not apply, contractors must comply with Equal Employment Opportunity standards, the Build America Buy America Act, and specific overtime pay requirements for contracts exceeding $100,000. Bidders must provide a combination payment and performance bond, with the payment bond covering 100 percent of the contract price. The contract will be awarded to the lowest responsive and responsible bidder. Submissions are due by November 13, 2026, at 2:30 pm EST via a hybrid method requiring both an electronic PDF version on a flash drive and a sealed hand-delivered original. Required documentation is extensive, including a unit pricing schedule, professional references, E-Verify and workers' compensation affidavits, and various federal and state certifications regarding lobbying, debarment, and foreign ownership. The period of performance requires work to commence within ten calendar days of the Notice to Proceed, with substantial completion by November 1, 2027, and final completion by December 1, 2027.
New Single-Family Housing Construction (except For-Sale Builders)

POSTED

26 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS