Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Washington was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stormwater and Erosion Control

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 18 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Snohomish County PUD is seeking a subcontractor to install and maintain temporary erosion control measures, including silt fencing, wattles, and seeding, in full compliance with Washington State stormwater regulations. The work is intended to prevent sediment runoff and protect water quality during construction activities, with all materials and methods required to meet applicable environmental standards. The contract is open for bids with a response deadline of July 14, 2026, and falls under NAICS code 541620, which covers environmental consulting services. The project location is in Washington, though specific city or address details are not provided, and the work will be performed at sites designated by the agency. Bidders must demonstrate the capability to execute and sustain erosion control practices effectively throughout the project duration, ensuring ongoing compliance and site readiness.

General Info

Install and maintain erosion control measures per Washington stormwater rules at designated sites by July 14, 2026.

Agency

Washington → Snohomish County PUDView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-1688-KS.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SWR - 2026 - 2028 Unit Price Asphalt and Concrete Restoration Contract

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Snohomish County PUD
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → Snohomish County PUD
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation and maintenance of temporary erosion control measures such as silt fencing, wattles, and seeding in compliance with WA stormwater regulations.

More opportunities from Washington → Snohomish County PUD

Same awarding agency

NAICS: 541614
SLED
Supply Chain Management Consulting
Solicitation # 26-1644-SR
Public Utility District No. 1 of Snohomish County is seeking qualified consultants through RFQ 26-1644-SR to establish a roster of experts for supply chain management consulting. The primary objective is to analyze the District's supply chain, identify gaps against industry best practices and regulatory requirements, and provide prioritized remediation roadmaps. The scope of work is comprehensive, covering demand and supply planning, sourcing, contracting, supplier management, logistics, inventory, risk and compliance, technology, and sustainability. Assessments must align with standards relevant to U.S. electric utilities, including NERC CIP, FERC, DOE, NIST, and ISO standards. Key deliverables include project charters, current state assessment reports with process maps, and final closeout packages. The selection process is based on best evaluated qualifications, with a strong emphasis on experience with comparable electric utilities and SAP MRP operations. The District utilizes a three-stage evaluation process involving pass/fail gates for completeness and responsiveness before ranking firms based on expertise and references. Awarded consultants will operate as independent contractors, with contract terms and engagement durations varying by project. Requirements include maintaining professional liability and workers' compensation insurance of at least 1 million dollars and adhering to strict confidentiality and non-disclosure agreements regarding critical infrastructure information. Submissions are accepted electronically through December 31, 2026, and must be signed by an authorized representative.
Process, Physical Distribution, and Logistics Consulting Services

POSTED

6 months ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS