Stormwater Management and Sustainable Infrastructure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Madison is seeking a subcontractor to design and install innovative stormwater management systems including bioswales, permeable paving, and retention basins under the contract titled Stormwater Management and Sustainable Infrastructure. The solicitation was posted on August 5, 2026, with a response deadline of November 6, 2026, at 2:00 PM. The work falls under NAICS code 541620, indicating engineering services, and is intended to enhance urban resilience through sustainable infrastructure that manages runoff, reduces flooding, and improves water quality. Projects will be performed within the jurisdiction of the City of Madison in Wisconsin, though specific locations have not been detailed. The contract does not specify a set-aside classification, and no point of contact information is provided in the data. Interested parties must submit responses through the vendor portal linked in the solicitation details.
General Info
Agency
NAICS
Place of Performance
WI, USASet-Aside
Documents
This scope was carved out of 15044-0-2026-BP.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Northeast Park Athletic Complex
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Wisconsin → City of Madison
Same awarding agency
