Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Structural Concrete and Piling Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the State of California Department of Transportation involves the performance of piling and structural concrete work for prime contractors on Caltrans highway projects in Sacramento. The scope of work includes the installation of cast-in-place concrete piling and steel soldier piling according to Sections 49-3 and 49-4, as well as the construction of concrete structures and reinforcement per Sections 51 and 52. The contractor is responsible for delivering all installed piling and completed concrete structures. Additionally, any concrete plants providing 250 cubic yards or more are required to have EPDs. The response deadline for this opportunity is November 10, 2026.

General Info

Subcontract for Caltrans piling and structural concrete work in Sacramento; deadline November 10, 2026.

Documents

This scope was carved out of 10-0V6904.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Merced County In And Near El Nido From 0.3 Mile South Of Red Top Road To Reilly Road

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs piling and structural concrete work for prime contractors on Caltrans highway projects. Installs cast-in-place concrete piling per Section 49-3, steel soldier piling per Section 49-4, and constructs concrete structures per Section 51 including reinforcement per Section 52. EPDs required for concrete plants providing 250 cubic yards or more. Delivers installed piling and completed concrete structures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price sealed bid issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole through clearing, grubbing, and stone rework. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Award is based on the lowest responsive price, and bidders must provide performance and payment bonds along with a bid guarantee. Key requirements include the submission of an operations plan and performance schedule within 30 days of the Notice to Proceed, as well as the appointment of key personnel including a Project Manager, Superintendent, Quality Control Manager, and Site Safety and Health Officer. The contract is subject to the Davis-Bacon Act and includes liquidated damages of 2,297 dollars per calendar day of delay. Bids must be submitted in sealed envelopes to the USACE Honolulu District, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237990
New
Federal
Amendment A00001; RFQ 70Z03026CCLEV0117; USCG LORAIN EZ-SUPPLY FLOORING RENEWAL, USCG STA LORAIN, 110 ALABAMA AVE, LORAIN, OH 44052.
Solicitation # 70Z03026CCLEV0117
The U.S. Coast Guard Base Cleveland is soliciting quotes for a turn-key flooring renewal project at the USCG Station Lorain boathouse facility in Lorain, Ohio. This total small business set-aside procurement, under NAICS code 237990, has an estimated value between $25,000 and $100,000. The scope of work involves the renewal of approximately 1,536 square feet of flooring, which includes structural rail demolition, slab trench infill, mechanical removal of existing paint, and the installation of a heavy-duty, slip-resistant epoxy/urethane coating system designed to withstand marine environments and forklift traffic. Quotes are due by 12:00 p.m. EST on September 29, 2026, and must include a comprehensive cost breakdown of labor, materials, equipment, and overhead. The selected contractor must commence work within 10 days of award and complete the project within 90 calendar days, with five allowable weather days. Key requirements include 100% bonding capacity for the quoted price, specific insurance coverages, and adherence to Ohio construction wage determinations. Site visits were encouraged between September 25 and September 28, 2026, to ensure accurate bidding and avoid potential cancellation if quotes exceed government estimates by more than 30 percent.
Base CLEVELAND(00030)

POSTED

about 18 hours ago

DEADLINE

in about 10 hours
View Details
NAICS: 237990
New
Federal
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Solicitation # W912HY26BA019
The U.S. Army Corps of Engineers, Galveston District, is seeking a firm-fixed-price contract for maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway and the Channel to Port Bolivar in Texas. The project, categorized under NAICS code 237990, involves removing approximately 959,000 cubic yards of material under Schedule 1, with a completion timeline of 270 calendar days from the Notice to Proceed. There are five optional work items, including dredging for the Galveston Alternate Route, Offatts Bayou Channel, and Ferry Channel, as well as beneficial use placement at Joycelyn Nungaray. The estimated construction price range is between 10 million and 25 million dollars. The procurement will follow the FAR 14 Sealed Bidding process, with the solicitation expected to be issued around September 15, 2026, and responses due by October 15, 2026. Eligible offerors must be registered in SAM.gov and provide performance and payment bonds within five days of award. Small businesses, including 8(a), HUBZone, SDVOSB, EDWOSB, and WOSB firms, are encouraged to apply, provided they meet the specific dredging size requirement of performing at least 40 percent of the volume with their own or other small business equipment. All work must comply with the USACE Safety and Health Requirements Manual EM 385-1-1 and applicable federal, state, and local regulations.
W076 Endist Galveston

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project
Solicitation # W9123626BA011
The Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project, solicitation W9123626BA011, is a firm-fixed-price construction contract issued by the U.S. Army Corps of Engineers, Norfolk District. The project involves the placement of approximately 2.2 million cubic yards of medium-grained sand across a nourishment area roughly 5.25 miles long and 125 feet wide in Virginia Beach, Virginia. Key technical requirements include the creation of a 50-foot-wide berm at an elevation of 6 feet NGVD and a foreshore slope of 1 vertical foot to 20 horizontal feet. The scope of work encompasses mobilization, dredging, beach fill operations, and specialized environmental services, including sea turtle response, relocation, and trawling. The estimated magnitude of construction is between 25 million and 100 million dollars, with a performance period of 365 calendar days. This unrestricted solicitation is awarded to the lowest responsive and responsible bidder based on the total price of base and option contract line items. Bidders must submit proposals through the PIEE Solicitation Module and provide a bid guarantee, with performance and payment bonds required at 100 percent of the contract price. The project is subject to strict environmental and safety standards, including coordination with the Bureau of Ocean Energy Management and the National Marine Fisheries Service, compliance with OSHA and EM 385-1-1 safety requirements, and adherence to DDESB TP-18 for personnel handling munitions and explosives of concern. Payment is administered monthly via ENG Form 93 through the Resident Management System, based on the volume of material placed and accepted.
W2SD Endist Norfolk

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details

More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

Same awarding agency

NAICS: 237110
New
SLED
Construction On State Highway In Shasta County At Various Locations From 0.5 Mile South Of Salt Creek Bridge To 0.3 Mile North Of Bridge Bay Overcrossing
Solicitation # 02-1J3904
Contract 02-1J3904 is a solicitation by the California Department of Transportation for construction work on State Highway 5 in Shasta County, spanning various locations from 0.5 mile south of Salt Creek Bridge to 0.3 mile north of Bridge Bay Overcrossing. The project has an estimated cost of 5.4 million dollars and is awarded on a cost plus time basis, with required bid durations between 85 and 120 working days. Bidders must hold a Class A or Class C-42 license and provide bid security equal to at least 10 percent of the bid. The project adheres to 2025 Standard Specifications and Standard Plans, with specific requirements for railroad flagging, environmental compliance, and the use of HDPE or non-treated wood mats for wetland crossings. The solicitation emphasizes Small Business Enterprise participation with a 5 percent contract goal; bids failing to meet this goal are considered nonresponsive. Preferences are available for certified SBEs, non-SBEs subcontracting at least 25 percent to SBEs, and California-based companies. Key deliverables include environmental product declarations for concrete and hot mix asphalt, electronic certified payroll via LCPtracker Pro, and compliance with in-use off-road diesel-fueled vehicle requirements. Work within drainage channels is restricted to the period between May 15 and October 15. Bids must be submitted via the Bid Express website by 2:00 p.m. on the bid opening date of October 28, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS