Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Welding for Metal Components

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Covington in Georgia is seeking a subcontractor for structural welding of metal components. This project involves field welding for structural steel, pipe joints, and support systems, with a strict requirement that all work be performed by certified personnel using procedures compliant with AWS D1.1 standards. The solicitation was posted on July 21, 2026, and requires responses to be submitted by August 25, 2026, at 3:00 PM. This opportunity falls under NAICS code 238990 and is managed through the Georgia state procurement system.

General Info

Covington, Georgia seeks certified structural welding subcontractors by August 25, 2026.

Agency

Georgia → City of CovingtonView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-15.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026-15 LAS Culvert Replacement. Phase 2

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Covington
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Covington
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Field welding of structural steel, pipe joints, and support systems requiring AWS D1.1-compliant procedures and certified personnel.

More opportunities from Georgia → City of Covington

Same awarding agency

NAICS: 237310
SLED
2026-21 Newton Drive Storm Drainage Improvements Project
Solicitation # 2026-21
The City of Covington is soliciting sealed bids for the Newton Drive Storm Drainage Improvements project, identified as Bid No. 2026-21. The scope of work involves the removal and replacement of approximately 208 linear feet of reinforced concrete storm drainage pipe, along with the installation of curb catch basins, drainage junction structures, and concealed access structures. The project also requires extensive site restoration, including the replacement of curb and gutter, sidewalks, residential driveways, and full-depth concrete roadway pavement, as well as drainage ditch regrading and the installation of GDOT Type 3 Riprap with nonwoven geotextile. Contractors are responsible for all labor, materials, equipment, traffic control, and the transportation of excavated materials to a City-designated site. Bids must be submitted in both hard copy and PDF format via USB thumb drive to City Hall by 10:00 am on October 13, 2026. A 5% bid bond is required with the submission, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract amount. Evaluation is based on responsiveness and responsibility, considering factors such as relevant experience, financial capacity, and safety records, rather than price alone. Qualified bidders must have at least five years of experience in similar work and have completed at least three such projects in the last five years. The contract includes a 15% City-controlled contingency allowance and stipulates liquidated damages of 250 dollars per calendar day for delays beyond the approved completion date. Contractors must perform at least 75% of the work using their own forces and maintain comprehensive general liability, automobile, and workers compensation insurance.
Highway, Street, and Bridge Construction

POSTED

19 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS