Substation Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Substation Program is a modernization initiative by the Los Angeles Department of Water and Power (LADWP) designed to upgrade the electrical distribution system within its in-basin service area through the planning horizon year 2045. The program focuses on relieving overloaded facilities, replacing aging equipment, and meeting the growing electricity needs of the City of Los Angeles to ensure reliable power delivery and support clean energy mandates. Key project components include the construction of four new enclosed distributing substations in the Sun Valley, Silver Lake, Southeast Los Angeles, and Wilmington areas, each with a total bank capacity of 32 to 90 megavolt-amperes. These new facilities will feature standard equipment such as transformers, circuit breakers, and feeders, and will be remotely monitored via a Supervisory Control and Data Acquisition (SCADA) system. Additionally, the program encompasses expansions and minor improvements to existing receiving and distributing substations. Construction for the four new substations is expected to begin in 2030 and conclude by 2041, with each site requiring approximately three years for development, testing, and commissioning. Other improvements range from short-term activities of 25 days per phase for distributing substation expansions to six-month durations for minor structural and installation works. The program is being executed in compliance with the California Environmental Quality Act (CEQA), with a Program Environmental Impact Report (PEIR) and Initial Study guiding the environmental assessment. Technical standards include strict noise and air quality controls, with operational levels maintained below 85 dBA and 65 dBA respectively, and adherence to state and local stormwater management requirements and hazardous waste regulations.

General Info

LADWP will modernize electrical substations in Los Angeles from 2030 to 2041.

Agency

California Los Angeles Department of Water and Power

Place of Performance

Exact locations to be determined, Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts2 people available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Jazmin MartinEnvironmental Specialist
Vicky RosenEnvironmental Planner

Interested Companies (1)

Michael Baker InternationalMoon Township, PA

Full Description

Show more
The Substation Program consists of planned developments and conceptual improvements to the LADWP distribution system through the planning horizon year 2045. To keep pace with the City’s growing electricity needs and reduce strain on the existing system, LADWP proposes to modernize its distribution system by constructing four new distributing substations to serve the Sun Valley, Silver Lake, Southeast Los Angeles, and Wilmington areas, and improving existing distributing substations and receiving substations. These improvements would take place in the LADWP in-basin service area, which covers the City of Los Angeles, and focus on relieving overloaded facilities, modernizing aging equipment, and meeting the City’s growing electricity needs to ensure reliable power delivery into the future.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of buried fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work includes all labor, materials, supervision, and equipment necessary for staking, material coordination, property owner contacts, and right-of-way restoration. The project involves the installation of both contractor-provided 48-strand buried fiber optic cable and district-provided 48-strand all-dielectric fiber, starting from the Hoskins 345kV substation control building and proceeding to District structure 79. Bids are due by November 13, 2026, with an expected award date on or before November 25, 2026. The project must be completed by April 15, 2027. Qualified bidders must have completed at least three similar buried fiber optic installation projects within the last five years and must provide a safety program compliant with OSHA standards, including OSHA 300 and 300A reports from the last three years. Award decisions will be based on the best evaluated bid, considering factors such as quoted price, conformance with specifications, past performance, and general financial and technical qualifications. Contractors are required to maintain comprehensive insurance coverage, including Workers Compensation with a 500,000 dollar employers liability limit, Commercial General Liability with a 1,000,000 dollar per occurrence limit, and Automobile Liability with a 1,000,000 dollar combined single limit. Payments will be made within 30 calendar days of receipt of a proper invoice containing the contractor's Federal Taxpayer Identification Number and the district's 10-digit Purchase Order Number. Final acceptance of the work is contingent upon a district inspection to ensure all specifications and Rural Utilities Service material standards are met.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS