This Solicitation opportunity from Tennessee was posted on November 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Summit Softball Concession Stand Ventilation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive upgrades and installations at the Summit Softball Complex, specifically focusing on the Red Building. It includes installing a new concession hood system equipped with a UL-listed grease exhaust hood, exhaust fan, makeup air unit, ductwork, and an integrated fire suppression system to ensure proper ventilation and safety. Additionally, the project requires electrical enhancements, such as replacing the existing 400A service panel with a 500A panel, upgrading the service feeder in underground conduit, and installing a new 208/120V panel with a step-down transformer to support the new equipment. Furthermore, the contract mandates replacing existing photoelectric smoke detectors with dual fixed temperature and rate-of-rise heat detectors across multiple buildings, including the Red, Blue, and Maintenance Buildings, to mitigate false alarms caused by dust. The fire alarm panels will also be reprogrammed accordingly. The solicitation, posted by the City of Chattanooga, is targeted at vendors capable of delivering services within a budget range of $100,000 to $300,000, with a response deadline set for December 10, 2024. The project aims to enhance safety, ventilation, and electrical infrastructure at the facility, ensuring compliance with safety standards and operational efficiency.
General Info
Place of Performance
TN, USASet-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Adding new concession hood system in Red Building in the Summit of Softball complex. This system shall be complete with U.L. listed/labeled grease exhaust hood, grease exhaust fan, makeup air unit, interconnecting ductwork, and integral fire suppression system. Adding new power underneath new hood, including replacing existing 400A 480/277V service panel with 500A 480/277V service panel, replacing existing service feeder in existing underground conduit for 500A service, and adding new 208/120V panel and step-down transformer. Replacing existing photoelectric smoke detectors with new dual fixed temperature/rate-of-rise heat detectors to reduce continuing false alarms due to dust in Red Building, Blue Building, and Maintenance Building, including reprogramming of fire alarm panels.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
