Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Sun City Lincoln Hills Beaver Coexistence Project (Notification of Lake or Streambed Alteration, No. EPIMS-PLA-67624-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMSPLA-67642-R2 with the Sun City Hills Community Association for the Sun City Lincoln Hills Beaver Coexistence Project in Lincoln, California. This project involves the installation of five pond leveler devices designed to manage beaver dams. Each device consists of high-density polyethylene double-walled corrugated pipes ranging from 8 to 12 inches in diameter, placed across hand-cut notches in the dams and protected by beaver exclusion cages at the upstream intake. To ensure stability, the pipes will be supported by t-posts in an X configuration and anchored with small concrete blocks. All installation work is required to be performed using hand tools to minimize environmental impact. The project is managed by the Fish and Wildlife Region 2 Northern Central office in Rancho Cordova, with Patrick Moeszinger serving as the Senior Environmental Scientist and Jeff Caponera acting as the project proponent.

General Info

CDFW and Sun City Hills will install five beaver pond levelers in Lincoln.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

Place of Performance

Lincoln, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Patrick MoeszingerSenior Environmental Scientist (Specialist)
Jeff CaponeraProject Proponent

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMSPLA-67642-R2, pursuant to section 1602 of the Fish and Game Code to the Sun City Hills Community Association. The project is limited to the installation of five (5) pond leveler devices, each consisting of beaver exclusion cages around the upstream intake and a high-density polyethylene (HDPE) double-walled corrugated pipe (ranging from 8” to12” diameter), placed across hand dug/cut notches in five (5) beaver dams. Pairs of t-posts will be installed in an 'X' configuration and secured to the pipe every 2 meters or as needed to support the pipe up off the bottom of the pond and/or streambed. Small concrete blocks will be used to anchor the pipe to the t-posts. All work will be performed with hand tools.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS