This Government Contract opportunity from Department Of Defense was posted on August 13, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Center for Aircraft Structural Life Extension (CAStLE), T-38 USAF Aircraft Structural Integrity Program (ASIP) Planning and Analysis

Awarded
FA7000-09-R-0050Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

United States Air Force Academy; Hill Air Force Base; Contractor Facilities, COLORADO SPRINGS, CO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 7:00 PM UTC to 5:00 PM UTC on Jul 25, 2009. The notice description changed.

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA7000 10 Cons Lgc
Contacts2 people available
OfficeUSAF ACADEMY, CO, 80840-2303, USA
Office AddressUSAF ACADEMY, CO, 80840-2303, USA
Contacts
Jessica M. NiebuhrContracting Officer
Richard A. HarperContract Specialist

Full Description

Show more
The 10th Contracting Squadron, United States Air Force Academy (USAFA) Colorado, intends to award a contract to Southwest Research Institute (SwRI) to maintain essential engineering and research capabilities pertaining to ASIP planning and analysis for the T-38 fuselage, wing, empennage, and landing gear, evaluating the usage spectrum, and assessing/determining alternative approaches for stress sequence development. In addition, SwRI will perform risk analysis of static, fatigue, or durability critical aircraft structures, structural health monitoring, non-destructive inspection, general training and any other related activities necessary to support the United States Air Force and the USAFA Center for Aircraft Structural Life Extension (CAStLE). The statutory authority permitting other than full and open competition is: 10 USC 2304(c)(1), as implemented by FAR 6.302-3(a)(2)(ii). FAR 6.302-3 is entitled, "Industrial Mobilization; Engineering, Developmental, or Research Capability; or Expert Services". In March 1961, the T-38 "Talon" was first delivered to the USAF with the expectation that the weapon system would have a nominal 20-year structural service life. Over the past five decades, both materiel (vis--vis modification programs) and engineering solutions have been employed to ensure structural airworthiness beyond the original 20-year expected service life. Some of the T-38 fighter jet aircraft trainers are nearing an unprecedented 50 years of service. The safety and success of the Warfighter are dependent upon the success of the T-38 System Program Office (SPO)/Aircraft Structural Integrity Program (ASIP) in sustaining the T-38 fleet to 2020 (and beyond). The Air Force must maintain continuous, focused, and integrated engineering capabilities, to ensure availability of personnel possessing characteristics and skills necessary to meet the fleet safety and structural sustainment needs of the aircraft community. Recent Class-A mishaps at Columbus (2008) and Edwards (2009) Air Force Base(s) (AFBs) resulting in the loss of life, demonstrate an ongoing, unforgiving environment that mandates an immediate response to the situation to ensure continuity in proactive sustainment activities. These incidences have reinforced the need for a community of well versed, technically competent, rapidly responding personnel. This community must be capable of providing timely, integrated, engineering answers to difficult technical challenges. In order to address this need, risks surrounding three key elements must be categorically mitigated: 1) safety, 2) mission impact, and 3) amount of Government oversight and contractor training prior to performing technical requirements. The operational environment will not accommodate an expenditure of additional resources (both in terms of personnel and cost) to support the time frame necessary for the development of an alternative engineering source for this effort. To address this environment and the resulting needs, it is essential for the Air Force to maintain SwRI's capabilities; thereby providing immediate, viable, engineering, research, and fleet management expertise to the Program and Warfighter. SwRI has been a major team leader in maintaining the viability of the T-38 weapon system to retirement. SwRI is a non-profit institution. It is positioned to provide unbiased technical assessments to the technical community, by pulling from the Company's wealth of T-38 experience and academic integrity as a research institution. SwRI has been a primary provider of technical expertise for mechanical testing, flight loads data recording, spectra analyses, durability and damage tolerance analyses, and engineering studies in direct support of the T-38 weapon system for over three decades. Much of this core ASIP data is unique to SwRI. Any other engineering services provider would find it extremely difficult (if not impossible) to be able to manipulate, interpret, and then transform this data into actionable technical information for use by the T-38 SPO/ASIP in a timely manner. For example, SwRI's T-38 Cracks Database, economic life analyses, and data reduction software - custom engineering algorithms and tools developed for the T-38 SPO/ASIP - takes an estimated six months to understand and a year to become proficient in their use. Due to the severity of the environment, this type of delay in execution of requirements would present an unacceptable level of risk to the Warfighter. SwRI has the immediate ability to execute requirements using company unique engineering analyses and tools. SwRI's technical prowess and detailed, comprehensive understanding of the T-38 structure/allied systems is unmatched by any similar aerospace engineering firm. The Institute's capacity as the lead ASIP contractor support organization for the T-38 has consistently provided highly skilled technical performance, responsiveness, and overwhelmingly positive value to the Warfighter. Historically, SwRI has provided for these essential technical capabilities by maintaining highly skilled company engineers that have ensured continuous, focused, and time critical engineering to the T-38 SPO/ASIP as detailed/demonstrated below: - USAF Fleet Viability Support (2009) - As an outcome of recent aircraft mishaps, and with continued general level concern about the ability of the T-38 weapon system to reach retirement in 2020, the T-38 ASIP/SPO is working with the USAF's Fleet Viability Board (FVB) to provide meaningful strategic direction to the Secretary of the Air Force (SECAF). SwRI, as the core provider of technical analyses and studies for the T-38 ASIP/SPO, is the recognized source of technical expertise for the T-38 structure (as most of the reports provided to the FVB's team are SwRI authored documents). In addition, SwRI stands behind their analyses and recommendations, providing a team of technical experts to address the FVB's questions regarding the structural history of the T-38 airframe. SwRI (teamed with the T-38 ASIP/SPO) continues to provide the key documentation and credible responses to the SECAF, the ultimate customer for the FVB's report. Maintaining this level of responsibility and continuity is critical to the success of the FVB in obtaining the buy-in of the SECAF. - Air Force Material Command's (AFMC's) Annual ASIP Review (2004-2009) - In support of the USAF's ASIP, AF leadership provides a technical team of senior structural, material, and aerospace engineers to review and provide recommendations for the various ASIPs. Over the past five review cycles (2007 was skipped), SwRI provided direct technical support to the T-38 ASIP/SPO in addressing engineering leadership's concerns and/or constructive critiques. Much of the review's dialogue centered around analytical and program management studies that SwRI was directly involved in developing; as the key provider of ASIP-related studies for the T-38, SwRI was adept at responding to (and patient with educating) the ASIP Review Team's members. As an outcome of this valued support, the ASIP Review Team has recognized the T-38 SPO/ASIP for a "best practice" in terms of ASIP planning. - T-38 Aileron Actuator Lever Fatigue Analysis (2008) - This engineering study was in direct support of a Class-A mishap that occurred at Columbus AFB. The Columbus mishap resulted in the tragic loss of two USAF pilots and the impact was further compounded by a second fatal mishap only weeks later. As a result of the initial mishap, USAF leadership grounded the entire T-38 fleet. Subsequent mishap investigations uncovered the cause of the Columbus AFB accident to be directly related to metal fatigue of an aileron actuator lever. SwRI was contracted to provide test, analysis, and technical/programmatic support recommendations to the USAF, as the T-38 SPO/ASIP was not positioned to immediately respond to the technical challenge of evaluating the fleet-wide risk. SwRI met all aggressive, short-suspense deadlines for reporting up to the Commander, AFMC (AFMC/CC) and Commander, Air Education and Training Command (AETC/CC) level of senior leadership. SwRI provided detailed, technically sound, and credible support to the associated Independent Review Team (IRT), established by the Commander, Ogden Air Logistics Center (OO-ALC/CC) level of leadership, in direct support of the needs of the USAF at large. The final outcome of this effort was stellar technical reporting and lever inspection/replacement recommendations that were on time, within budget, and critical to AETC and the T-38 SPO towards providing guidance on a fleet-wide grounding decision. - T-38 Analytical Condition Inspection (ACI) and Risk Plan (2007-2009) - As the USAF leadership's attention continues to be drawn to the T-38 weapon system, the T-38 SPO/ASIP are routinely required to provide timely, credible, and technically sound risk evaluations for safety and strategic management activities. SwRI is the recognized leader in developing sound risk assessments for use in managing the T-38 fleet. As the architect and sole provider of the only comprehensive ASIP risk plan for the T-38 weapon system, SwRI has provided strategic guidance towards the T-38 ASIP's ability to manage safety of flight risk while mitigating the associated adverse affects to mission impact. Cultivating this unique skill-set over the past three decades, SwRI has demonstrated its ability to readily address short, moderate, and long-term risk assessments with little-to-no guidance from the T-38 SPO/ASIP. The operational environment could not accommodate an expenditure of additional resources (both in terms of personnel and cost) to support an estimated two-year time frame for the development of an alternative engineering source for the described risk evaluations. The most recent risk assessment in SwRI's 2009 reporting is directly related to the life-limiting fuselage structural component (i.e., the dorsal longeron); this timely assessment is currently being used by the T-38 SPO/ASIP for development of the Pacer Classic III modification program - a $200M structural refitting program. In addition to fleet planning activities, such as Pacer Classic III, SwRI is positioned to quickly respond (within weeks) to any structural risk evaluation using the approved USAF Probability of Fracture (PROF) methodologies. This unique capability to support T-38 activities, in terms of both short- and long-term risk assessments, is essential to the management of the T-38 fleet to 2020 (and beyond). - T-38 Airframe Life Study (2002-2007) - This program has been the marquee engineering activity for the T-38 ASIP over the last ten years and it is vital to AETC and the T-38 SPO. SwRI has provided turn-key technical and programmatic support. Under one effort, the Company successfully reconfigured a T-38A aircraft (retired in 1995) by structurally refitting the hull into a near-T-38C configuration. Testing was conducted at SwRI's facilities, with simulated flight loading close-loop controlled by the use of a custom LabVIEW program and over 200 strain gage channels. SwRI provided turn-key engineering with the following technical activities: setting-up the test article, developing the loading sequence, establishing a data collection program, ensuring an appropriate inspection protocol, carefully employing a teardown evaluation, and articulating the final economic life reporting and recommendations. During mid-course of the program, cracking was discovered by SwRI, while looking in locations outside of the test requirements. These findings ultimately leading to a safety inspection Time Compliance Technical Order (TCTO). Later in the program, SwRI partnered with the T-38 SPO/ASIP/AETC and original equipment manufacturer (OEM - i.e., Northrop Grumman), developing a comprehensive assessment of the T-38 fleet's structural health. The test program culminated in a briefing to AETC on 30 May 2007, where the nucleus of the Pacer Classic III program (a structural refitting program for 125 aircraft) was formed. The final outcome of this effort was highly credible technical reporting and fleet management recommendations that were on time, within budget, and timely to AETC and the T-38 SPO towards determining the next-generation jet pilot trainer decision. - T-38 Wing Economic Life Evaluations (1993-2009) - In the early- and mid-1990s, the T-38 fleet experienced a number of relatively early wing condemnations, due in large part to fatigue cracking. Working with the Air Force, SwRI performed a full-scale wing test and subsequent teardown inspections of the test article (complemented by additional teardown work of field condemned wings), fully establishing a working baseline for estimating the number of wings required to fleet retirement. In essence, SwRI's unique algorithm for the T-38 usage evaluation and expertise in the wing life process evaluation enabled SwRI to provide the required level of detail to ensure fleet safety - while at the same time maintaining mission capability by recommending the appropriate level of wings for supply. The outcome of this comprehensive study was the establishment of an economic life for the T-38's wing, providing guidance to the USAF in the acquisition of replacement wings for the fleet. In total, over $200M in wings for the T-38 weapon system will be replaced based on SwRI's predictive model. This technical assessment was also instrumental in providing preliminary information used in the redesign of the next-generation of T-38 wings. The expertise of SwRI described herein will continue to enable the Air Force to immediately address the challenges facing the T-38 SPO/ASIP at present and those projected to occur as the Program sustains the T-38 in the decades to come. In these capacities, the Institute will play a key role in ensuring synergistic benefits and value to the USAF and to the parties that support and rely on the T-38 weapon system. On 10 July 2009, the Contracting Officer posted a sole source synopsis under solicitation number FA7000-09-R-0050. The synopsis contained a description of the requirement discussed above and rationale for the sole source acquisition. The posting closed on 25 July 2009. No responses have been received to date. The J&A was approved on 31 July 2009. 5352.201-9101 OMBUDSMAN (AUG 2005) (a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern. (b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions). (c) If resolution cannot be made by the contracting officer, concerned parties may contact the USAF Academy Ombudsmen, Kelly Snyder 8110 Industrial Drive, Ste 103 USAFA, CO 80840 Telephone Number: 719-333-2074 Fax Number: 719-333-9018 email: kelly.snyder@usafa.af.mil Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067. (d) The ombudsman has no authority to render a decision that binds the agency. (e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer. (End of clause)

More opportunities from Department Of Defense → FA7000 10 Cons Lgc

Same awarding agency

NAICS: 323117
New
Federal
USAFA "Contrails" Pocket Reference Handbook – Volume 73 and Future Editions
Solicitation # FY27_USAFA_Contrails
The Department of Defense, through the 10th Contracting Squadron at the United States Air Force Academy, is conducting market research via a Sources Sought Notice for the production of the Contrails pocket reference handbook, Volume 73 and future editions. This anticipated Firm-Fixed-Price Requirements Contract under NAICS 323117 involves the annual printing, binding, packaging, and delivery of approximately 1,600 copies, with an estimated range between 1,400 and 1,800 units. The publication is a durable, hardcover, pocket-sized handbook measuring exactly 3.25 inches by 5.0 inches with approximately 240 pages. A critical technical requirement is the use of Smyth-sewn signatures for binding to ensure durability over a 47-month period; glued-only or perfect binding is explicitly prohibited. The project follows a strict annual timeline where the final approved layout is provided around December 1, and the finished products must be delivered FOB Destination to the USAFA in Colorado Springs by March 31. Contractors must provide physical or electronic press proofs for formal acceptance by the Contracting Officer or Representative before proceeding to mass production. All operations must comply with domestic sourcing requirements, including the Buy American Act, FAR Part 25, and DFARS 225. Interested parties must submit a capability statement of no more than five pages in searchable PDF format to Melinda Lingley and Dawson Hopkins by October 23, 2026, at 14:00 Mountain Time.
Books Printing

POSTED

6 days ago

DEADLINE

in 3 days
View Details
NAICS: 611512
Federal
USAFA Rapid Acquisition Commercial Solutions Opening (CSO)
Solicitation # FA7000-25-S-C001
The USAFA Rapid Acquisition Commercial Solutions Opening (CSO) FA7000-25-S-C001 is an umbrella solicitation designed to acquire innovative commercial technologies and services to support the United States Air Force Academy's mission in leadership, academics, fitness, and professionalism. Operating as a CSO with Calls, this vehicle does not request proposals upon initial issuance but instead establishes a framework for future requirements. The government issues specific Calls for proposals as amendments to the CSO, with awards typically taking the form of FAR Part 12 commercial contracts or Other Transactions (OT). Proposals are evaluated based on technical merit, importance to agency programs, and funds availability, with the government seeking the best overall value. To date, the CSO has issued six distinct Calls focusing on diverse operational needs. These include strategic admissions outreach (Call 001), military exoskeleton technology to enhance warfighter lethality (Call 002), autonomous virtual perimeter monitoring for situational awareness (Call 003), and warfighter training support services for a 47-month cadet continuum (Call 004). More recent efforts include the implementation of AI-powered automated high school and college transcript processing (Call 005) and a comprehensive brand analysis to develop a Strategic Brand Roadmap (Call 006). Due to the handling of Controlled Unclassified Information (CUI), certain requirements, particularly for AI and IT solutions, restrict participation to U.S. Persons, including U.S. citizens and lawful permanent residents.
Flight Training

POSTED

4 months ago

DEADLINE

in over 3 years
View Details
NAICS: 541611
Federal
Small Business Subcontracting Plan Development & ReportingThis contract involves developing and maintaining a subcontracting plan in compliance with FAR 52.219-9, focusing on small business participation across multiple categories including Minority Business Enterprises (MBE), Women-Owned Business Enterprises (WBE), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), Historically Underutilized Business Zones (HUBZone), and Small Disadvantaged Businesses (SDB). It requires comprehensive outreach efforts, goal tracking, and regular reporting to ensure contractors meet the specified small business participation targets. The contract supports the Department of Defense and is connected to the USAF Academy as the place of performance. The contract, titled "Small Business Subcontracting Plan Development & Reporting," falls under NAICS code 541611, which covers administrative management and general management consulting services. Issued on March 4, 2026, it has a response deadline on August 9, 2028, providing ample time to prepare proposals. Although no specific agency office address or point of contact is provided, it is managed by the contracting office designated as FA7000 10 Cons Lgc within the Department of Defense. The focus is on ensuring robust subcontracting plans that promote small business engagement and compliance with federal subcontracting regulations.
Administrative Management and General Management Consulting Services

POSTED

8 months ago

DEADLINE

in almost 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS