Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Tennis and Pickleball Court Renovations at Howarth and Galvin Community Parks

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Rosa is undertaking significant renovations to the tennis court facilities at Howarth and Galvin Community Parks, involving full reconstruction and resurfacing of existing courts, with selected courts being converted to pickleball courts to meet evolving community recreation needs. The project includes installing new striping, interior fencing, net systems, and player benches to support the revised layouts. At Howarth Park, landscape planting will be added adjacent to the courts to enhance aesthetics and usability, while Galvin Park will feature a bioretention area designed to manage and treat stormwater in compliance with local environmental regulations. The work is intended to preserve operational use of the facilities during and after construction, with an emphasis on functional upgrades and sustainable design elements. No formal contract value, pricing details, or binding contractual terms are available in the provided documentation, as the materials describe a projected initiative classified as a forecast rather than a formally awarded contract. The project has undergone environmental review, with a Notice of Exemption and a CDFW No Effect Determination submitted as part of compliance, and fees related to this review have been paid. The City of Santa Rosa, through its Recreation and Parks department, serves as the lead agency, with Kristinae Toomains listed as the primary point of contact for project coordination. The place of performance is clearly defined as both parks located in Santa Rosa, California. However, no specific performance period, evaluation criteria, contract type, clause requirements, packaging standards, or procurement methodology have been disclosed in the available materials, suggesting the project is still in the planning or pre-solicitation phase with administrative and environmental groundwork completed but formal bidding and contracting processes not yet initiated.

General Info

Santa Rosa renovates tennis courts at Howarth and Galvin Parks, adding pickleball courts, fencing, benches, stormwater management, and landscaping.

Agency

California → City of Santa Rosa

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Howarth: Summerfield Rd; Galvin: Bennet Valley Rd and Yulupa Ave, CA

Set-Aside

NONE

Documents

(1)

CA DFW Environmental Document Filing Fee Receipt 2025 Tennis and Pickleball Court Renovations

PDFenvironmental-fee-receipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Rosa
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Santa Rosa
Office AddressN/A
Contacts
Kristinae ToomainsSenior Planner and Environmental Coordinator

Full Description

Show more
Project proposes significant renovations to the tennis court facility at both Howarth and Galvin Community parks, which will include rebuilding and resurfacing the courts and converting a select number to pickleball courts. New striping, interior fencing, net systems, and benches to support the new layouts, with landscape planting adjacent to the courts at Howarth park, and the installation of a bioretention area at Galvin park to satisfy stormwater treatment requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details