Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Control Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract titled Traffic Control Services requires the provision of all necessary labor, signs, barricades, and traffic control measures to ensure safe and uninterrupted access during ongoing construction activities. The scope encompasses the full implementation and management of traffic control plans on-site, with an emphasis on public safety, regulatory compliance, and the minimization of disruptions to roadway users. All materials and personnel must meet established standards for visibility, durability, and effectiveness under varying weather and traffic conditions. This is a subcontract solicitation posted on June 24, 2026, with a response deadline of July 23, 2026, at 9:30 AM. It falls under NAICS code 561990 for other support activities and is managed by the Vermont office of the Department of Economic Development. The place of performance is unspecified but will be within Vermont, and the contract does not include a set-aside designation. Interested parties must submit proposals through the official Vermont Business Registry portal by the stated deadline to be considered for award.

General Info

Provide traffic control services for Vermont construction projects by July 23, 2026, meet safety and regulatory standards.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

561990 - All Other Support ServicesView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73886.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Town Highway Surface Improvements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provision of all labor, signs, barricades, and traffic control measures to maintain safe access during construction.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS