This Subcontract opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transformer Pad and Switch Enclosure Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails the construction of a concrete transformer pad and the installation of a switch enclosure, requiring precise coordination between concrete work and electrical systems. The scope involves site preparation, pouring and curing of reinforced concrete to support transformer equipment, and the secure mounting of a switch enclosure, ensuring compliance with all safety and engineering standards. All materials and labor must meet specified quality benchmarks to guarantee long-term durability and operational reliability in a public utility environment. The project is issued as a subcontract under the NAICS code 238110, tied to the City of Riverside in California with a place of performance in ZIP code 92504. The solicitation was posted on July 29, 2026, and bids are due by August 27, 2026, with submissions handled through the BidAmerica platform. No set-aside provisions or specific organizational requirements are outlined, but bidders must demonstrate experience in both concrete construction and electrical infrastructure installations to be considered for award.

General Info

Construct concrete transformer pad and install switch enclosure in Riverside, CA, meeting safety and quality standards for public utility use.

Place of Performance

Riverside, CA, 92504, USA

Set-Aside

NONE

Documents

This scope was carved out of 8273.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Hunter Substation Circuit 21 and 22 4KV-12KV - Make-Ready

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of a concrete transformer pad and installation of a switch enclosure requiring concrete and electrical coordination.

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
SLED
Water Well Rehabilitation Program Fy2026/2027
Solicitation # RPU-8298
Solicitation RPU-8298 is a project for the City of Riverside Public Utilities Department focused on the rehabilitation, redevelopment, and testing of the Thorne 12 potable water well in San Bernardino, California. The scope of work includes brushing, bailing, air lifting, video surveys, cleaning, chemical treatment, and redevelopment. The contractor is responsible for furnishing and installing a new motor-driven, oil-lubricated line-shaft, tube, column, vertical turbine pump unit and appurtenances, as well as performing motor inspections and repairs. Specialized requirements include spinner, gyroscopic, and caliper surveys, water quality testing for Title 22, PFOA/PFOS, and coliform/HPC analysis, and the installation of a removable permanent shade structure over the pump motor. Additionally, the contractor must utilize CIPO Cloud Construction Management Software for project management. The contract will be awarded to the lowest responsive and responsible bidder who completes all portions of Bid Schedule A. Bidders must hold a current C-57 contractor license and submit all proposals electronically by November 20, 2026. The project has a total performance period of 300 calendar days, with a specific 120-day window for the completion of well rehabilitation. Requirements include providing performance and payment bonds for 100 percent of the contract price, adhering to California prevailing wage rates, and complying with NPDES discharge permits. Payment is processed via progress applications consisting of invoices, schedules of values, and certified payroll records, with the City paying undisputed requests within 30 days.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 8 days
View Details
NAICS: 237110
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS