Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Well Pump & Motor Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of RPU-8298.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Water Well Rehabilitation Program Fy2026/2027

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs inspection, repair, and installation of well pumps and motors for prime contractors on City of Riverside Public Utilities projects. Removes existing pumps, refurbishes motors, and installs new or repaired systems based on Pump Recommendation reports. Uses NSF-certified pump components and pump hoisting equipment. Delivers fully operational and tested well pump and motor systems.

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting lump sum fee-for-service bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The contractor is responsible for providing all transportation, labor, supervision, tools, and manufacturer-specified replacement parts. The scope of work includes the disassembly and inspection of the clutch assembly, replacement of friction discs, plates, bearings, oil seals, and O-rings, and the resurfacing of the flywheel. Additionally, the contractor must replace necessary hydraulic pipes and flanges, service applicable filters and fluids, and verify the proper operation of the clutch and power take-off system under load. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms, under NAICS code 811310. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a completed bid sheet, supplier packet, W-9, and proof of insurance. Award will be based on best value. The contract incorporates various Federal Acquisition Regulation clauses, including standards for combating trafficking in persons, equal opportunity, and the Service Contract Act wage determination for Kentucky. Final acceptance of the work is contingent upon inspection by the Facility Maintenance Department to ensure the tractor is restored to safe and reliable operating condition.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 811310
New
SLED
Chiller Maintenance Services
Solicitation # 26FS0006
Solicitation 26FS0006 is an Invitation for Bid issued by the California Department of Veterans Affairs (CalVet) for comprehensive maintenance and emergency repair services for chillers, Liebert units, and cooling towers at the Veterans Home of California-Fresno. The contract period is scheduled from January 1, 2027, through June 30, 2030. The scope of work includes annual and quarterly preventive maintenance, one-time evaporator tube cleaning and eddy current testing, and emergency repair services with a required two-hour response time. Key deliverables include annual leak detection reports per AQMD requirements and yearly oil sample lab analysis reports. The contract will be awarded to the lowest responsible bidder who complies with all requirements. Evaluation factors include price, responsibility, and responsiveness, with specific incentives and preferences applied for Disabled Veteran Business Enterprises (DVBE) and certified Small or Micro businesses. To be eligible, contractors must maintain an active C-20 license and technicians must hold EPA Section 608 Universal Technician Certification. Bidders are required to submit a mandatory Rate Sheet, signed Contractor Certification Clauses, and a Bidder Certification via email to Eric Dahmen by the November 4, 2026, deadline. Awarded contractors must adhere to prevailing wage laws under Labor Code Section 1770 and comply with all site security and health requirements at the Fresno facility.
California Department of Veterans Affairs

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
New
SLED
Water Well Rehabilitation Program Fy2026/2027
Solicitation # RPU-8298
Solicitation RPU-8298 is a project for the City of Riverside Public Utilities Department focused on the rehabilitation, redevelopment, and testing of the Thorne 12 potable water well in San Bernardino, California. The scope of work includes brushing, bailing, air lifting, video surveys, cleaning, chemical treatment, and redevelopment. The contractor is responsible for furnishing and installing a new motor-driven, oil-lubricated line-shaft, tube, column, vertical turbine pump unit and appurtenances, as well as performing motor inspections and repairs. Specialized requirements include spinner, gyroscopic, and caliper surveys, water quality testing for Title 22, PFOA/PFOS, and coliform/HPC analysis, and the installation of a removable permanent shade structure over the pump motor. Additionally, the contractor must utilize CIPO Cloud Construction Management Software for project management. The contract will be awarded to the lowest responsive and responsible bidder who completes all portions of Bid Schedule A. Bidders must hold a current C-57 contractor license and submit all proposals electronically by November 20, 2026. The project has a total performance period of 300 calendar days, with a specific 120-day window for the completion of well rehabilitation. Requirements include providing performance and payment bonds for 100 percent of the contract price, adhering to California prevailing wage rates, and complying with NPDES discharge permits. Payment is processed via progress applications consisting of invoices, schedules of values, and certified payroll records, with the City paying undisputed requests within 30 days.
Water and Sewer Line and Related Structures Construction

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS