Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Truckee River Day - Donner Creek Fuels

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Truckee Fire Protection District is implementing the Truckee River Day - Donner Creek Fuels project in Truckee, California, to reduce wildfire risk along State Route 89 South, a primary evacuation route. The project focuses on the selective hand thinning of small diameter lodgepole pine trees with a diameter at breast height of less than 10 inches that are growing at hazardous densities. Spanning an area of less than 0.3 acres, the scope of work involves using chainsaws for thinning and employing non-ground disturbing methods to carry and pile material for disposal. The primary objective is to decrease the vertical and horizontal continuity of forest fuels to enhance the protection of life, property, and emergency responders. This project is classified as a forecast under NAICS code 115310 and is managed by Forester Dillon Sheedy. It operates under a Categorical Exemption pursuant to CEQA Guidelines Section 15304, Class 4, for minor alterations to land. All activities will be conducted in accordance with resource protection measures to avoid adverse environmental impacts. While the project utilizes volunteers as part of the annual Truckee River Day, it is formally documented through a Notice of Exemption to ensure regulatory compliance within Nevada County.

General Info

Truckee Fire Protection District will thin lodgepole pines to reduce wildfire risk along SR89.

Agency

California → Truckee Fire Protection District

Place of Performance

State Route 89 S , College Trail, Truckee, CA, 96161

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Truckee Fire Protection District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Truckee Fire Protection District
Office AddressN/A
Contacts

Full Description

Show more
Truckee Fire will work with volunteers as part of the annual Truckee River day to hand thin small diameter lodgepole pine trees less than 10" DBH that are growing at an unhealthy and hazardous density near a primary evacuation route (SR 89 south). Project area is less than 0.3 acres. Non-ground disturbing methods will be used including hand thinning with chainsaws and hand carrying and piling for material disposal.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for an excavator piling and scarification project in the Louie Creek logging area. The scope of work covers a total of 90.8 acres divided into two specific blocks: Area 350-005 consisting of 42.3 acres and Area 350-039 consisting of 48.5 acres. Key performance requirements include the construction of water bars on slopes to prevent erosion and the strategic placement of piles on existing trails, with windrowing permitted only on slopes exceeding 40 percent. Project quality and progress will be monitored through inspections conducted by a designated Contract Officer’s Representative in each unit. Bids must be submitted in a sealed envelope to the San Poil Forestry Office at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. To be considered responsive, offerors must be registered in SAM.gov, provide proof of contractor liability insurance, and bid on every inspection item. The award process emphasizes Indian preference in accordance with Title 10-3-7 and considers technical qualifications, price reasonableness, and the offeror's responsibility history over the previous seven years. Additional requirements include TERO compliance, adherence to Tribal Occupational Safety and Health Administration standards, and the submission of a comprehensive contracting and subcontracting plan.
Confederated Tribes of the Colville Reservation

POSTED

about 19 hours ago

DEADLINE

in 2 days
View Details
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit Sp-16-PCT-27 (13.44 acres). The scope of work involves removing competing vegetation while preserving the most vigorous trees, managing slash to ensure it is cleared from roadways and water sources, and removing all debris from the site. Specific technical standards include a maximum stump height of one-half the stump diameter and a maximum slash height of 24 inches. Bids must be submitted in a sealed envelope labeled McAllister Creek PCT 2027 and delivered to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026; electronic submissions are prohibited. Required documentation includes a bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a certification regarding debarment and responsibility. While the lowest bid may not necessarily be the acceptable bid, award decisions may use previous contract close-out evaluations as tiebreakers. Contractors are required to maintain liability insurance and a valid Trader License, and they must comply with TERO Title X and TOSHA safety regulations. Payment is based on a bid price per acre for completed and accepted acreage, with 20 percent of each payment withheld until final acceptance. Partial payments are generally restricted to units larger than 10 acres unless weather shutdowns occur. All work is subject to inspection by a designated Contract Officer's Representative to ensure quality and compliance with thinning specifications.
Confederated Tribes of the Colville Reservation

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details
NAICS: 115310
New
SLED
25146 - Furnishing Labor and Equipment for Power Line Right of Way and Easement Clearance and Tree Trimming REBID
Solicitation # 25146
The City of Alcoa is soliciting sealed bids under RFB 25146 for the furnishing of labor, equipment, and materials to perform utility forestry services, including tree trimming, brush removal, and right-of-way and easement clearance. The contract is structured with multiple pricing models, including circuit firm prices, hourly crew rates, and unit rates for tree removal. Work is divided into two annual phases, with Phase I running from July 1st to December 31st and Phase II from January 1st to June 30th. Bids must be submitted by 2:00 p.m. on Tuesday, November 17, 2026, to the Alcoa Purchasing Agent. The scope of work requires strict adherence to ANSI A300 guidelines and safety standards, including OSHA and the National Electrical Safety Code. Key technical requirements include maintaining a 10-foot minimum clearance for distribution lines and a 25-foot clearance for transmission lines, with specific hand-cutting mandates near structures and wetlands. Contractors must possess a valid Pest Commercial Applicator's License from the Tennessee Department of Agriculture for chemical applications and provide an insurance certification. Award decisions will be based on the bid amount as well as the vendor's experience, reputation, and ability to provide future support. All work is guaranteed for one calendar year, and the City of Alcoa Electric Department retains the right to inspect and approve all completed services.
City of Alcoa

POSTED

about 20 hours ago

DEADLINE

in 14 days
View Details
NAICS: 115310
New
SLED
Chuckwagon Hazardous Fuels Reduction Project
Solicitation # 26RFP21220
The South Dakota Wildland Fire office is soliciting proposals under RFP 26RFP21220 for the Chuckwagon Hazardous Fuels Reduction Project. The project involves performing hazardous fuels reduction treatment on approximately 80.76 acres of property located near Rapid City, South Dakota, specifically within Sections 16 and 21 Township I.S Range 7E. This work is categorized under forest harvesting services. Interested contractors are encouraged to attend site visits scheduled for November 12 and November 18, 2026. Proposals must be submitted by December 4, 2026, at 3:00 PM MST. Submissions can be sent via email in PDF format to [email hidden] or delivered by mail to Adam Fritz at the South Dakota Department of Public Safety Wildland Fire office in Rapid City. Email submissions must use the subject line Sealed Proposal Enclosed RFP# 26RFP21220, while physical submissions require a sealed envelope marked with the RFP number, title, and the phrase Sealed Proposal Enclosed. Physical submissions must include one original and three identical copies signed by an authorized officer. Eligibility for award is contingent upon the contractor not being in arrears with the State of South Dakota and being deemed responsible and reliable by the Secretary of Public Safety. The issuing office is the South Dakota Wildland Fire office, with Adam Fritz serving as the primary point of contact.
South Dakota State Government

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS