UDS - MHS-3 & MHS-5 Substation Protection Upgrade- Supply & Delivery

Active
CMH26-100International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Medicine Hat has issued Request for Proposals CMH26-100 for the supply and delivery of protection upgrades for the MHS-3 and MHS-5 substations. This supply-only contract involves the engineering design, fabrication, assembly, wiring, and testing of specific hardware, including a new bus protection panel, transformer protection panels, and a breaker control panel for the MHS-03 substation, as well as modification components for line protection panels at both MHS-03 and MHS-05. All equipment must adhere to CSA, ANSI, and IEEE standards, bear accredited certification labels, and have a minimum design life of 30 years. The successful vendor is responsible for all freight and shipping insurance, with final delivery required DDP to the Electric Distribution site in Medicine Hat, Alberta, by March 31, 2027. The procurement process follows a five-stage evaluation involving mandatory health and safety reviews, submission requirements, technical evaluations, and pricing. Proponents are ranked based on a 100-point scale, with corporate experience in electrical protection and control panel fabrication serving as a key rated criterion. The top-ranked proponent will enter direct contract negotiations to finalize a supply agreement. Key contractual obligations include providing a 12-month warranty from the date of operation or 18 months from delivery, submitting a preliminary inspection and testing plan, and providing bonding, insurance, and health and safety certification within seven days of a notice of award. The final submission deadline was extended via addendum to October 8, 2026.

General Info

Medicine Hat seeks protection upgrade hardware for MHS-3 and MHS-5 substations by March 2027.

Agency

City of Medicine HatView Agency

NAICS

335314 - Relay and Industrial Control ManufacturingView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(8)

BOM_MHS3 TX Protection_2026-09-02 - Addendum 2

PDFspecifications

CMH26-100 Addendum 1 - UDS Substation Protection Upgrade

PDFamendment

CMH26-100 Addendum 2 - UDS MHS-3 & MHS-5 Substation Protection Upgrade

PDFamendment

CMH26-100 - UDS MHS-3 & MHS-5 Substation Protection Upgrade

PDFrfp

MHS-03 BB & Line Prot BOM - Addendum 2

PDFspecifications

MHS-03 & MHS-05 Line Protection - Addendum 2

PDFspecifications

MHS-03 Transformer Protection - Addendum 2

PDFspecifications

Project 10518: MH53-69KV Bus Protection - Addendum 2

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Medicine Hat
ContactsNo contacts available
OfficeCAN
Organization / Agency
City of Medicine Hat
View Agency Profile
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
This Request for Proposals (the “RFP”) is an invitation by the City of Medicine Hat (the “City”) to prospective proponents to submit proposals for UDS - MHS-3 & MHS-5 Substation Protection Upgrade - Supply & Delivery. COMPANIES ARE TO SUBMIT ALL INFORMATION STATED ON PAGES 22 & 23. DO NOT SUBMIT ANY ZIPPED FILES.

Similar Contracts

Same NAICS industry code

More opportunities from City of Medicine Hat

Same awarding agency

NAICS: 423310
New
International
Supply and Delivery of Wood Utility Poles
Solicitation # CMH26-114
The City of Medicine Hat has issued Request for Proposals CMH26-114 for the supply and delivery of wood utility poles on an as-required basis. The contract features an initial one-year term with the option to extend for nine additional years, for a maximum total duration of ten years. All poles must conform to Material Standard ED-MPO-001.02 and various industry standards, including CAN/CSA O15 and O80, as well as AWPA specifications. Specifically, poles must be full-length pressure treated with Chromate Copper Arsenate Type C and feature precise die-stamped metal tagging and incising based on pole height. Delivery is required F.O.B. to 2172 Brier Park Place N.W., Medicine Hat, AB, with freight prepaid and allowed. Proposals are due by October 1, 2026, at 2:00 PM local time. The award will be based on a ranking of qualified proponents who meet all mandatory technical and submission requirements, evaluated on their ability to meet the scope, technical ability, and staff expertise. The successful supplier must maintain sufficient inventory to meet the City's business plans and provide automobile liability insurance of at least 2,000,000 dollars, naming the City as an additional insured. Payment terms are net 30 days from the receipt of a correct invoice. The City reserves the right to inspect products during all phases of production and upon delivery, requiring the supplier to replace any rejected goods at their own expense.
Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 237130
International
MHS-11 Transmission and Distribution Line Construction Services
Solicitation # CMH26-103
The City of Medicine Hat is soliciting proposals under RFP CMH26-103 for MHS-11 Transmission and Distribution Line Construction Services. The project scope involves the construction and installation of approximately 2 km of overhead 138 kV transmission line connecting the existing MHS 20L to the new MHS-11 substation in Medicine Hat, Alberta. Key technical requirements include the installation of three cast-in-place concrete caisson foundations, the framing and setting of three steel poles, the installation and testing of 13.8 kV underground cables in PVC conduit, and modifications to existing structures. The project is supported by a geotechnical investigation report and an Environmental Protection Plan to ensure compliance with AUC Rule 007 and other regulatory standards. The target in-service date for the project is April 30, 2027. Proposals must be submitted in PDF format by September 24, 2026. The evaluation process is multi-staged, covering health and safety, mandatory requirements, technical evaluation, and pricing, with pricing accounting for 50 points of the total score. Awarded contractors must provide a bid bond of at least 10 percent of the proposal price, as well as performance and payment bonds each equal to 50 percent of the contract price. Additionally, the successful proponent must provide health and safety certification and insurance certificates within seven days of the Notice of Award. Payment will be processed monthly based on unit prices, lump sums, or achieved milestones, following a review by the project consultant.
Power and Communication Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS