Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

US101: Trask River Bridge Proj.

Closed
S-73000-00016851State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 10 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 10 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The Oregon Department of Transportation is soliciting a qualified contractor to perform erosion control repair work on the Trask River Bridge along US101. The scope of work includes installing erosion and sediment control features, setting up temporary traffic control and water management systems, carrying out necessary bridge repairs, and implementing right-of-way development measures such as seeding and planting to restore and stabilize the surrounding area. All work must be conducted in compliance with environmental and safety standards to minimize impact on the surrounding ecosystem and traffic flow. The solicitation, identified as S-73000-00016851, was posted on June 3, 2026, with a response deadline of June 24, 2026, at 10:00 PM Pacific Time. The contract falls under NAICS code 237310 for highway, street, and bridge construction and is managed by ODOT Region 2 in Salem, Oregon. All inquiries and communications should be directed to Joanne Robinson, the primary point of contact and purchaser, via phone or email. The work is to be performed at the Trask River Bridge location, and interested parties must submit proposals through the OregonBuys portal by the specified deadline.

General Info

ODOT seeks contractors for erosion control and bridge repair on Trask River Bridge, bid due June 17, 2026.

Place of Performance

Salem, OR, 97301, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 17, 2026 to Jun 24, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
Contacts2 people available
OfficeSalem, OR, 97301, USA
Office AddressSalem, OR, 97301, USA
Contacts
Joanne RobinsonPoint of Contact
Joanne RobinsonPurchaser

Interested Companies (36)

4S Signs
AakenBend, OR
Ash Creek Forest ManagementHillsboro, OR

See All 36 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
ODOT is seeking one qualified contractor to perform erosion control repair work to the Trask River Bridge including: Installing erosion and sediment control features, installing temporary traffic control and water management devices, performing the bridge repair work, and installing right-of-way development and control features including seeding and planting.

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238220
New
SLED
ODOT Bldg. A HVAC Controls Replacement
Solicitation # S-73000-00018356
The Oregon Department of Transportation (ODOT) is soliciting quotes for the design and implementation of a like-for-like Direct Digital Control (DDC) system at Building A in Salem, Oregon. The primary objective is to replace outdated American Auto-Matrix controllers with Automated Logic Systems to improve energy efficiency and simplify operational control. The scope includes replacing GPC1 controllers in the boiler room and specific roof top units, ensuring that Building B can operate independently upon completion. To avoid disrupting building climate control, all work must be performed between 5 PM and 6 AM while maintaining a temperature of 70 degrees plus or minus 2.5 degrees. The contract will be awarded to a single responsible offeror based on price, experience, expertise, product functionality, and suitability for the project. Awardees must be certified as an Emerging Small Business via COBID and commit to performing at least 51 percent of the labor using their own workforce. The project is subject to BOLI prevailing wage requirements and strict safety standards, including compliance with federal and Oregon OSHA regulations. Detailed technical requirements include specific labeling for wiring, pneumatic tubing, and control panels, with equipment meeting MIL-STD 810C for shock and vibration. Contract administration involves monthly invoicing by the 10th of each month, with a 5 percent retainage potentially withheld by the owner. Payments are typically issued within 30 calendar days of receiving a conforming invoice. The contractor must provide a detailed work schedule within one month of the award and submit monthly status reports. Substantial completion is defined by 30 continuous days of successful, trouble-free operation, and failure to meet the substantial completion date will result in liquidated damages. Final acceptance requires the submission of all demonstration checklists and written certification from the engineer.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS