USCG Station Eaton's Neck Boiler Combustion Analysis and calibration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project involves providing combustion analysis, calibration, and commissioning services for eleven Weil-McLain EVG 299 boilers and associated AQUA PLUS 55 S2 hot water storage tanks at the U.S. Coast Guard Station Eaton’s Neck housing complex in Northport, New York. The primary objective is to verify and adjust combustion settings at both low-fire and high-fire conditions according to manufacturer specifications to ensure safe and efficient operation. The contractor is required to inspect combustion-air intake and venting, document all readings before and after adjustments, and identify any equipment requiring repairs beyond the immediate scope of work. The performance period for site visits is scheduled for November 3 through November 6, 2026, and November 9 through November 10, 2026, between 8 AM and 3 PM EST, with coordination required through DC1 Michael Bush. This is a total small business set-aside under NAICS code 238220. All work must adhere to OSHA safety standards and EPA waste disposal regulations. Invoicing must be processed through the Invoice Processing Platform using the routing code CEU-MIAMI and must include the contractor's Unique Entity Identifier. The project is managed by the Department of Homeland Security's Base Boston office.
General Info
Place of Performance
Northport, NY, 11768, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE +1 (555) 000-0000.
This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768)
Each housing unit contains the following equipment covered under this agreement:
- Boiler: Weil-McLain EVG 299 (280,000 BTU)
- Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2
The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Homeland Security → Base Boston
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
