Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on April 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC ANVIL WATER MIST SYSTEM

Closed
70Z08526Q002495Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
The U.S. Navy, through the Navsup Fleet Logistics Center Naples, is soliciting a Firm-Fixed-Price contract for a Vessel Voyage Repair Availability (VRA) for the USS Mt Whitney (LCC 20). The work will be performed in Gaeta, Italy, with a period of performance from December 1, 2026, through December 15, 2026. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, featuring tasks such as barometer calibration, steel repairs, fire room drain piping repairs, LPAC hose hydrostatic testing, and insulation repairs. The contractor must adhere to strict technical standards, including MIL-STD-869 for thermal insulation, ANSI and ISO requirements for calibration, and US Coast Guard and COLREGS Navigation regulations. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered, quoters must be rated acceptable regarding their technical capability, which requires providing proof of ISO 9001 or 14001 Quality Management Systems, ABS welding certifications, and laboratory qualifications for calibration. The contract emphasizes rigorous safety and environmental compliance, requiring certified Marine Chemists for gas-freeing and strict adherence to international and local regulations for the handling and disposal of hazardous materials. Invoicing must be processed electronically via Wide Area Work Flow (WAWF). Quotes are due by November 2, 2026, and must include completed Standard Forms 18 and 30, along with specific representations and certifications regarding tax status and defense telecommunications equipment.
Navsup Flc Sigonella Naples Office

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is soliciting proposals for a comprehensive propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project requires a factory-certified Honda Marine Authorized Dealer to decommission and remove two existing Honda BF250A outboard engines and replace them with new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing the removal of legacy rigging, a structural assessment of the transom, installation of new engines and Honda iST electronic control heads at dual helm stations, integration with the existing SeaStar PA1315-2 Power Assist steering and NMEA 2000 network, and a complete fuel system overhaul using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and adhere to strict insurance requirements, including at least 1 million dollars in commercial general liability and business auto liability. Financial protections include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Proposals are due by November 13, 2026, and will be evaluated based on a 100-point scale considering technical capability and budget, with specific preferences given to responsible Indian Offerors under TERO and tribal preference laws. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 16 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Charleston, SC, 29401, USA

Set-Aside

8A

Documents

2

USCGC ANVIL Marioff Hi-Fog MAU-150 Upgrade Statement of Work

DOCX, High priority: read this firstsow
High

Notice of Intent to Sole Source 70Z08526Q002495

DOCX, Low prioritynotice-of-intent
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

NOTICE OF INTENT TO SOLE SOURCE 70Z08526Q002495



The Department of Homeland Security {DHS}, United States Coast Guard {USCG} Surface Forces Logistics Center {SFLC}, located at 1 Eagle Road Bldg. 55, Alameda CA 94501 is issuing this Notice of Intent {NOI} to inform industry contractors of the Government's intent to Award a Sole Source Firm Fixed Price {FFP} Contract IAW Federal Acquisition Regulation {FAR} Part 12 and 13 procedures.


The intended Contractor ASSOCIATED FIRE PROTECTION, 4905 South 97th St, Omaha, NE, 68127 United States.


USCG SFLC requires: USCGC ANVIL, water mist system upgrade.


This procurement is being conducted using commercial item procedures pursuant to Federal Acquisition Regulation {FAR} Part 12 and FAR Part 13, specifically FAR 13.106-1{b}{1}, allowing the Contracting Officer


{KO} to solicit from one source.


The North American Industry Classification System {NAICS} for this requirement is 336611 - Ship Building and Repairing. The Product of Service Code for this requirement is 2090. This will not be a small business under the Small Business Administration {SBA} size standard for this sector.


This notice of intent is neither a formal solicitation nor a request for competitive proposals. No solicitation document is available, and telephone requests will not be honored. No award will be made on the basis of unsolicited quotations or offers received in response to this notice. Any response to this notice must show clear, compelling and convincing evidence that competition will be advantageous to


the Government. The intent of this synopsis is for informational purposes only. Information received will normally be considered solely for the purpose of determining whether to conduct competitive procurement. A determination by the Government not to complete this action based on this notice is solely within the discretion of the Government.


All inquiries and concerns must be addressed in writing via e-mail to Mr. Sean McTague at contact@example.gov with the following information referenced in the subject line, Solicitation 70Z08526Q002495. A determination by the Government not to complete this proposed procurement based on the responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct competitive procurement. All interested parties who are responsible, certified, and capable may identify their interest and may submit an offer or quotation which shall be considered by the agency no later than 8:00 AM Pacific Time


{PST} on April 28, 2026, to Mr. McTague at contact@example.gov


The interested parties bear full responsibility to ensure complete transmission and timely receipt.




STATEMENT OF WORK (SOW)


FOR


USCGC ANVIL Marioff Hi-Fog MAU-150 Upgrade



ANVIL has an immediate need for replacement of their current engine room fire fighting system with the Marioff Hi-fog MAU-150 Water Mist Fire Suppression System.


1.  SCOPE


1.1 Intent.  This work item describes the requirements for the Contractor to provide labor and materials to install a complete Water Mist fire suppression system to protect the Engine Room.  This installation also includes piping provisions for supplying the Water Mist fire suppression system with potable water.


1.2 Government-furnished property.


MTI


ITEM DESCRIPTION


NSN/PN


QTY


ESTIMATED COST
($/UNIT)


N


Water Mist Fire Suppression System


EU2150 – MAU150  


1 ea.


100,000.00


*Government-loaned property, which shall be returned to the vessel upon completion of the availability.


**New or refurbished equipment that the Government may provide for installation in place of existing equipment.


***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.


2.  REFERENCES


Coast Guard Drawings


Coast Guard Drawing 75C-WLR-1112-001, Rev B, FOUNDATION FOR MARIOFF WATER MIST SYSTEM


Coast Guard Drawing 75C -WLR-4803-001, Rev C, ENGINE ROOM WATER MIST SYSTEM A&D


Coast Guard Drawing 75C -WLR-4803-002, Rev -, MARIOFF ENG RM WATER MIST FIRE SUPPRESSION SYSTEM


Coast Guard Publications


Surface Forces Logistics Center Standard Specification 0000, (SFLC Std Spec 0000) 2018 Edition, General Requirements


Surface Forces Logistics Center Standard Specification 0740, (SFLC Std Spec 0740) 2018 Edition, Welding and Allied Processes


Surface Forces Logistics Center Standard Specification 3041, (SFLC Std Spec 3041) 2018 Edition, Shipboard Electrical Cable Test


Surface Forces Logistics Center Standard Specification 3042, (SFLC Std Spec 3042) 2018 Edition, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation


Surface Forces Logistics Center Standard Specification 6310, (SFLC Std Spec 6310) 2018 Edition, Requirements for Preservation of Ship Structures


Surface Forces Logistics Center Standard Specification 8636, (SFLC Std Spec 8636) 2018 Edition, Temporary Hull Accesses


Other References


HI FOG WATER MIST FIRE PROTECTION SYSTEM MANUAL (MARIOFF),       DOCUMENT CODE DOC0002166E


Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2009, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, And Installation


3.  REQUIREMENTS


3.1 General.


3.1.1  CIR. 


None.


3.1.2 Tech Rep.  Contractor shall provide the services of OEM authorized/ licensed Tech Rep, for the Marioff Hi Fog MAU water Mist Fire Suppression System, to accomplish the following tasks:


Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system (consultation not mandatory to be on site).


Test and Certify final installation (on-site).


3.1.3 Protective measures.  The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work.  Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.


3.1.4 Interferences.  The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:


Piping


Bulkhead insulation


Deck Plates & Boundary Angle


Cableways and transits


Electrical panels


3.2  Water Mist Fire Suppression System Installation.  The Contractor shall install all components of the new Water Mist system as follows:.


3.2.1  Removals.


3.2.1.1  The Contractor shall package, ship, or dispose all removed components as designated by the Coast Guard Inspector.  The Contractor shall perform the following:


3.2.1.2  Existing CO₂ System Removal.  The Contractor shall remove the existing fixed fire-fighting CO₂ system in the Fidley including, but not limited to, the cylinders, foundation, hoses, supports and piping using Coast Guard Drawing 75C-WLR-4803-001.


3.2.2  Material List.


3.2.2.1  Both CG DWGs 75C-WLR-4803-001 and 75C-WLR-4803-002, have lists of "Installer Supplied Materials" and "Vendor Supplied Materials (GFE)".  To be clear for the purpose of this specification Installer Supplied Material is the same as Contractor Furnished.   To be clear for the purpose of this specification Vendor Supplied Material is the same as Government Furnished (and is what is included in 1.1 Government Furnished Property)


3.2.3  Structural modifications and installations.


3.2.3.1  Temporary access opening.  Upon obtaining specific express written permission from the Contracting Officer, the Contractor shall cut temporary access openings as designated by the Coast Guard Inspector to facilitate ingress/egress of equipment as necessary.  Perform all required work for opening the access and reinstallation of closure plates in accordance with SFLC Std Spec 8636, Temporary Hull Accesses.


3.2.3.2  Structural Foundations.  The Contractor shall fabricate and install the structural foundations for the new Water Mist Unit in accordance with CG DWG 75C-WLR-1112-001.


3.2.3.3  Deck Plates & Boundary Angle.  The Contractor shall modify deck plates and boundary angles in way of Water Mist System components.


3.2.4  Mechanical modifications and installations.


3.2.4.1  Potable Water Supply.  The Contractor shall install a new Potable Water supply piping line from the Engine Room to the Forward Hold in accordance with CG DWG 75C-WLR-4803-001 and 75C-WLR-4803-002. 


3.2.4.2  Water Mist Assembly.  The Contractor shall install the new Water Mist System, including the MAU, the Nitrogen bottle and all associated components located in the Forward Hold, in accordance with CG DWGs 75C-WLR-4803-001, 75C-WLR-4803-002 and 75C-WLR-1112-001.


3.2.4.3  Water Mist distribution piping.  The Contractor shall provide and install Water Mist distribution piping and spray heads for the Engine Room in accordance with Coast Guard Drawing 75C-WLR-4803-001 and 75C-WLR-4803-002.


3.2.4.4  Perform all weld in accordance with (SFLC Std Spec) 0740, Welding and Allied Processes.


3.2.4.5  When and where necessary, fabricate and install new pipe hangers in way of the permanently discarded hangers in accordance with MSS SP-58.  Remove any old discontinued pipe hangars no longer used.  These hangars would be in addition to the ones required by general Note 3. of 75C-WLR-4803-001.


3.2.4.6  Shop fabrication, cleaning, flushing and testing of assemblies is permissible and even  preferable.


3.2.5  Electrical modifications and installations.


3.2.5.1  Control Panel Installation.  The Contractor shall install the flush mounted Water Mist System Control Panel on the Longitudinal Bulkhead within the STBD Passage (Main Deck), leading into the Log Office, in accordance with CG Dwg 75C-WLR-1112-001. Exact location of panel to be determined at the time of installation.


3.2.5.2  Electrical Installation.  The contractor shall install new wiring between the Control Panel in the main deck passage and the Water Mist Unit in the Forward Hold, in accordance with CG Dwg 75C-WLR-4803-002.


3.2.5.3  Electrical requirements.  The Contractor shall accomplish all electrical work in accordance with SFLC Std Spec 3042, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation and test cables in accordance with SFLC Std Spec 3041, Shipboard Electrical Cable Test, and MIL-STD 2003A, Electric Plant Installation Standard Methods for Surface Ships and Submarines.


3.2.5.4  Electrical cabling requirements.  The Contractor shall ensure that all electrical cables are zero Halogen and low smoke type in accordance with requirements set forth in Naval Ships Technical Manual (NSTM) Chapter 300, Electric Plant-General.


3.3  Pipe flushing.  After all authorized work is completed; the Contractor shall accomplish the following:


3.3.1  Flush all new and disturbed piping with clean fresh water until all debris is removed but not longer than five minutes.  Ensure flushing fluid is directed to move scale and foreign debris away from installed machinery to prevent possible damage upon operational testing.  Submit a CFR documenting date and time of flushing process and level of pipe cleanliness.  Blow dry all flushed piping with dry, low-pressure air.  Ensure all water is removed to prevent contamination of the piping systems.


3.3.2  Dispose of flushing fluid in accordance with all applicable Federal, state, and local regulations. 


Warning


Do not drain any fluids including fresh water, into any space, bilge, or exterior location..


3.4  Hydrostatic test.  After all authorized repairs of welded joints, the Contractor shall hydrostatically test all new and disturbed piping and components of the system in accordance with SFLC Std Spec 0740, Appendix C, “Hydrostatic Test”.  Be aware that no leakage or permanent deformation of pressure-containing parts is permissible.  Repair all leaks and discrepancies found.  Submit a CFR.  Test Notes of CG DWG 75C-WLR-4803-001 provides more amplifying information concerning hydrostatic testing.


3.4.1 After hydrostatic testing, test piping for operation and unobstructed flow


3.5  Touch-up preservation, general.  The Contractor shall prepare and coat all new and disturbed gooseneck vent pipe surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)


3.6  Certification and Crew Training. 


3.6.1  At conclusion of all work and in the company of USCG Inspectors, the system shall be fully tested and shall be certified operational by a qualified Marioff Representative (Tech Rep).


3.6.2  The Tech Rep shall provide onboard training of the ship’s personnel for the watermist system installed.  The training shall include but is not limited to:


a.   review of monitoring and actuation procedures


b.   system recharging


c.   maintenance procedures





  1. OTHER APPLICABLE CONDITIONS


4.1 PERIOD of Performance 


The period of performance for this contract shall not exceed 120 calendar days from the date of award.



4.2 PLACE OF PERFORMANCE 


The primary place of performance will be at CGC ANVIL home port, 196 Tradd St.


Charleston, SC 29401




4.3 HOURS OF OPERATION


Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays).  However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations. 



4.4 TRAVEL 


Contractor travel may be required to support this requirement. 



4.5 Daily Progress Reports 


The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work.



4.6 General Report Requirements 


The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).



5.0 GOVERNMENT FURNISHED RESOURCES


Listed in section 1.2


6.0 CONTRACTOR FURNISHED PROPERTY 


The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.



  1. GOVERNMENT ACCEPTANCE PERIOD

The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance.  If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.       



8.0 DELIVERABLES


The Contractor shall provide a trip report once project is completed.




More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS