Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on June 29, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC Cheyenne Chill Water Renewal

Closed
70Z08522P18587000Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by the Navsup Flc Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from 12 November 2026 to 18 November 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, rust and corrosion removal, replacement of lagging and insulation, cleaning and inspection of air conditioning and refrigeration plant condensers, furniture upholstery replacement, and the provision of rigging and scaffolding services. All work must adhere to NAVSEA Standard Items and specification package NAPL-009-27. Award will be made to the lowest priced technically acceptable offeror, with technical capability evaluated on an acceptable or unacceptable basis. Offerors must submit a completed J-1 price breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Quality assurance requirements include providing a quality management system supporting documents and certifications for welding and coatings. Contract administration requires electronic invoicing via Wide Area WorkFlow, and the contractor must comply with specific overseas insurance requirements, including the Defense Base Act and war-hazard insurance.
Navsup Flc Sigonella Naples Office

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 336611
New
Federal
Misty Barge Dry Dock Services
Solicitation # 1240BF27Q0002
Solicitation 1240BF27Q0002 is a total small business set-aside issued by the USDA-FS CSA Northwest 4 for dry dock services for the Misty Barge, currently located at Shelter Cove on Revillagigedo Island, Alaska. The scope of work includes hauling out the vessel, performing exterior hull sandblasting and painting, repairing the exterior deck and appurtenances, painting the interior hull, and cleaning bilge tanks. All painting must adhere to Preparation and Painting Specification 00300 and manufacturer recommendations, specifically utilizing PPG products. The period of performance extends from the date of award through April 1, 2027, with specific deliverables including a work schedule, coating products list, and interior bilge painting plan due shortly after the start date. Offers are due by November 6, 2026, following an extension granted by Amendment 0001. Proposals must be submitted via email as three separate attachments covering technical capability, past performance, and price. Award will be based on the most advantageous quote, with price serving as the primary evaluation factor. Technical evaluations will focus on the provided draft work schedule and proposed haul-out dates, while past performance will be assessed based on recency and relevancy within the last three years. The contractor is responsible for implementing a Quality Control Plan managed by a designated Quality Control Representative, while the government will maintain Quality Assurance through performance requirements measures.
Csa Northwest 4 Usda-Fs

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 336611
New
Federal
USCGC DOLPHIN FUEL TANK CLEANING
Solicitation # 52000QR270000488
The U.S. Coast Guard Surface Force Logistics Center is soliciting quotations for the cleaning and inspection of two diesel fuel service tanks (3-9-1-F and 3-9-2-F), each with a 1,450-gallon capacity, aboard the USCGC Dolphin (WPB-87354) in Mobile, Alabama. This total small business set-aside is being processed as a firm-fixed price contract using simplified acquisition procedures under FAR Part 13 and FAR Subpart 12.6. The scope of work includes the removal and legal disposal of 1,400 gallons of contaminated diesel fuel, comprehensive interior cleaning of tank surfaces, atmospheric testing by a competent person, and detailed visual inspections of structural conditions and coating systems. The contractor is also responsible for maintaining a plug log, providing a chain of custody for waste, and implementing a Quality Control Program to ensure compliance with SFLC Standard Specifications 0000 and 0740. The period of performance is not to exceed five days, with a requested work window between November 15, 2026, and December 15, 2026. Key deliverables include the successful execution of initial and post-service operational tests on tank level indicators and vent check valves, witnessed by the Engineer Petty Officer. The government will provide new gaskets and stainless steel hardware for tank closure. Interested vendors must be registered in SAM.gov and submit a detailed cost breakdown, including unit and total pricing, by November 9, 2026, at 0900 A.M. EST. Award will be based on the best value to the government, considering price, specifications, quality, and past performance.
CG-SEA-C21

POSTED

1 day ago

DEADLINE

in 10 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Saint Louis, MO, 63118, USA

Set-Aside

SBA

Documents

3

75C-WAGL_3800_1_1_-_3.pdf

PDF

75C-WAGL_3802_22_1_-_-.pdf

PDF

CHEYENNE_Chill+water+SOW.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA
Contacts
RODERIOUS HARMON
William A. M. Sword

Full Description

Show more
STATEMENT OF WORK (SOW) FOR USCGC CHEYENNE CHILL WATER PIPING RENEWAL CHEYENNE has multiple leaks in their chill water system piping due to system freezing. The ship currently has a non-operational chill water/air conditioning system and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL Background The 75 WLR asset, USCGC CHEYENNE, has a central chill water air conditioning system that supplies multiple fan coil units (FCU) which supply heat and cooling to various spaces on the cutter. The chill water piping froze which resulted in multiple ruptures throughout the cutter's chill water piping system. CHEYENNE's chill water piping needs to be replaced as soon as possible to minimize cutter climate concerns and possible crew fatigue issues to CHEYENNE's crew. Scope The scope of this contract is defined by the efforts and tools required to support USCGC CHEYENNE (WLR 75405). The Contractor shall provide all labor, materials, and tools necessary to renew the chill water piping system. OBJECTIVE The goal is to return CGC CHEYENNE's chill water piping system to designed system parameters. APPLICABLE DOCUMENTS Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020, General Requirements Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document: Coast Guard Drawing (CGDWG) 75C-WAGL_3800_1, Rev 3, AUG 1963, HEATING & A/C CHILL WTR SYS (75401) SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC CHEYENNE (WLR 75405) at its current location in St. Louis, MO. In some instances, such as with the trip report, the Contractor may complete work upon return to the home office. 2.1 Renew Chill water Piping The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. 2.1.1 The Contractor shall remove all interferences to access chill water piping including but not limited to bulkhead/overhead paneling and insulation. 2.1.2 The Contractor shall furnish and install protective coverings to protect all non-affected items in the vicinity of the work area. 2.1.3 The Contractor shall remove and dispose of all existing chill water piping. 2.1.4 The Contractor shall renew all chill water piping with appropriate size and material piping IAW Section 1.4.2 and industry standards. 2.1.5 The Contractor shall upon completion of chill water piping renewal preform a pressure test to verify system integrity. 2.1.6 The Contractor shall install new pipe insulation to all renewed piping. 2.1.7 The Contractor shall repair any bulkhead/overhead framing deemed necessary during interference removal. 2.1.8 The Contractor shall reinstall all interferences removed in Section 2.1.1. 2.1.9 The Contractor shall remove and dispose of all protective coverings and any other miscellaneous refuse generated during the performance of this task. 2.2 Document Changes The Contractor shall configure all components in accordance with established industry best practices. 2.2.1 The Contractor shall reference Documents 1.4.2 when working onboard the asset(s). The Coast Guard will make available copies of the existing Drawing for this system. While performing work, if the Contractor notices discrepancies between the documented guidance and their best practices, it shall be annotated. Obsolete or inaccurate information must be corrected by Coast Guard personnel after the site visit. 2.3 Test Thoroughly and Document The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO's designated representative. 2.3.1 The Contractor shall provide a trip report documenting all findings no later than one week after returning to the home office. 2.3.2 The Contractor shall include in the trip report any system and design changes made during the visit. CONTRACTOR PERSONNEL 3.1 Qualified Personnel The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 3.2 Continuity of Support The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer's Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement. 3.3 Employee Identification 3.3.1 Contractor employees visiting Government facilities shall wear an identification badge that, at a minimum, displays the Contractor name and the employee's name. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times. OTHER APPLICABLE CONDITIONS 4.1 PERIOD of Performance The period of performance for this contract shall start on 11July2022 and not exceed 14 calendar days. 4.2 PLACE OF PERFORMANCE The primary place of performance will be the Department of Homeland Security on CGC CHEYENNE at 100 Arsenal Street, St. Louis, MO 63118 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Officer (EO) as scheduling is subject to ship's operations. 4.4 TRAVEL Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows XP and Microsoft Office Applications). 5.0 GOVERNMENT FURNISHED RESOURCES The Government will provide the workspace necessary to perform the on-site portion of Contractor services required in this contract, unless specifically stated otherwise in this work statement. The Government will also provide copies of the references cited in Section 1.4 upon Contractor arrival. The Contractor shall use Government furnished information, data and documents only for the performance of work under this contract, and shall be responsible for returning all Government furnished information, data and documents to the Government at the end of the performance period. The Contractor shall not release Government furnished information, data and documents to outside parties without the prior and explicit consent of the Contracting Officer (KO). 6.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. GOVERNMENT ACCEPTANCE PERIOD The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted. 7.1 Corrections The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor's accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions. 7.2 Timeliness of Corrections The COR will have 15 business days to review deliverables and make comments. The Contractor shall have 15 business days to make corrections and redeliver. 7.3 All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained. 8.0 DELIVERABLES ITEM SOW REFERENCE DELIVERABLE / EVENT DUE BY DISTRIBUTION 1 2.2.1 Equipment or Document Discrepancies 14 cal days post visit KO and COR 2 2.2.1 Red-lines to Reference Documents 1.4.2. 14 cal days post visit KO and COR 3 2.2.2 Supplemental and updated documentation to be added to Reference Documents 1.4.2. 14 cal days post visit KO and COR 4 2.3.1 & 2.3.2 Trip report documenting all findings 7 cal days post visit KO and COR

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS